静压桩隔时压桩试桩的探讨 被引量:1

The Discussing final pressure of static P.H.C.T.P. (Prestressed High-stren gth Concrete Tubular Piles)
在线阅读 下载PDF
导出
摘要 本文介绍一种新的静压桩试桩方法———隔时压桩试桩法,即试压桩后间隔2·0h即进行单桩极限承载力测试,然后选择能满足设计要求的压桩力作为工程桩施工时的终压力。用这种试压桩确定的终压力来指导工程桩的施工,既能满足单桩设计承载力要求,又不致产生不必要的浪费。 The paper introduces a new static P.H.C.T.P. (Prest re ssed High-strength Concrete Tubular Piles) trail method. The quintessence of this me t hod:① Pushing down a pile with certainty pressure ② interval 2.0hours ③ push i ng down the pile again and measuring utmost pressure at that time. ④confirming final pressure by utmost pressure. The method could save on the construction ma t erial, abridge the engineering period. In the same time, the bearing capacity c o uld satisfy the design requirement.
作者 吴巧霞
出处 《福建建筑》 2005年第4期105-106,共2页 Fujian Architecture & Construction
关键词 静压桩 隔时压桩试桩 终压力 Static P.H.C.T.P Interval pushing down pile testing Fina l pressure
  • 相关文献

参考文献2

  • 1林本海,王离.静压桩承载性能的分析研究[A]中国土木工程学会第九届土力学及岩土工程学术会议论文集(上册),2003.
  • 2JGJ 94-1994.建筑桩基技术规程[S],1994.

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部