汽轮机并网前轴瓦振动优化控制

Optimal Control of Bearing Vibration of Steam Turbine before Grid Connection
在线阅读 下载PDF
导出
摘要 某厂2×350MW燃煤机组由上海汽轮机厂生产,2013年投入商业运行。2020年机组C级检修后冷态启动,汽轮机冲转暖机正常后定速3000rpm/min运行,3000rpm/min定速运行90min后,汽轮机轴瓦振动持续升高触发振动保护动作停机,通过分析及处理取得良好的效果,可为其他同类型机组相关问题提供借鉴。 The 2×350 MW coal-fired unit was produced by Shanghai steam turbine works.The unit was put into commercial operation at the end of 2013.After the annual overhaul of the unit in 2020,the turbine started at a constant speed of 3000 rpm/min,and the bearing bush vibration continued to rise,triggering the vibration protection action shutdown.Through the analysis and treatment,good results were obtained,which can provide reference for other similar units.
作者 窦家新 董曙君 贺强 Dou Jiaxin;Dong Shujun;He Qiang(Inner Mongolia Jingneng Kangbashi Thermal Power Co.,Ltd.,Ordos 017010,China)
出处 《内蒙古石油化工》 CAS 2021年第7期36-40,共5页 Inner Mongolia Petrochemical Industry
关键词 350MW级 汽轮机 轴瓦 分析 处理 350MW class steam turbine bearing shell analysis treatment
  • 相关文献

参考文献3

二级参考文献7

共引文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部