Several large-scale wind turbine tripping accidents occurred in Jiuquan wind power base in 2011.According to the on-site survey and analysis of these accidents related to relay protection,causes were found to be the c...Several large-scale wind turbine tripping accidents occurred in Jiuquan wind power base in 2011.According to the on-site survey and analysis of these accidents related to relay protection,causes were found to be the collection system defects and low correct operation rate of small current grounded line selectors of the unearthed neutral point collection system.By referring to both the characteristics of Jiuquan wind power base and arrangement of relay protection,the short-circuit features of wind power and its impacts on relay protection are analyzed.The collection system and the retrofit of the small current grounded line selector are improved by specific countermeasures.Finally,further research subjects are put forward.展开更多
To optimize peaking operation when high proportion new energy accesses to power grid,evaluation indexes are proposed which simultaneously consider wind-solar complementation and source-load coupling.A typical wind-sol...To optimize peaking operation when high proportion new energy accesses to power grid,evaluation indexes are proposed which simultaneously consider wind-solar complementation and source-load coupling.A typical wind-solar power output scene model based on peaking demand is established which has anti-peaking characteristic.This model uses balancing scenes and key scenes with probability distribution based on improved Latin hypercube sampling(LHS)algorithm and scene reduction technology to illustrate the influence of wind-solar on peaking demand.Based on this,a peak shaving operation optimization model of high proportion new energy power generation is established.The various operating indexes after optimization in multi-scene peaking are calculated,and the ability of power grid peaking operation is compared whth that considering wind-solar complementation and source-load coupling.Finally,a case of high proportion new energy verifies the feasibility and validity of the proposed operation strategy.展开更多
There were many accidents of large-scale wind turbines disconnecting from power grid in 2011.As singlephase-to-ground fault cannot be correctly detected,single-phase-to-ground fault evolved to phase-to-phase fault.Pha...There were many accidents of large-scale wind turbines disconnecting from power grid in 2011.As singlephase-to-ground fault cannot be correctly detected,single-phase-to-ground fault evolved to phase-to-phase fault.Phase-to-phase fault was isolated slowly,thus leading to low voltage.And wind turbines without enough low voltage ride-through capacity had to be disconnected from the grid.After some wind turbines being disconnected from the grid,overvoltage caused by reactive power surplus made more wind turbines disconnect from the grid.Based on the accident analysis,this paper presents solutions to above problems,including travelling waves based single-phase-to-ground protection,adaptive low voltage protection,integrated protection and control,and high impedance fault detection.The solutions lay foundations in theory and technology to prevent large-scale wind turbines disconnecting from the operating power grid.展开更多
To analyze the factors which affecting transient stability of power system, the dynamic model of doubly-fed induction generator and direct-drive PM synchronous generator has been built using PSCAD. Impact of different...To analyze the factors which affecting transient stability of power system, the dynamic model of doubly-fed induction generator and direct-drive PM synchronous generator has been built using PSCAD. Impact of different wind farm integration on grid typically in China has been presented. The influence of the variations of transient reactance, negative sequence reactance and rotary inertia on critical clearing time of power system transient stability is analyzed by time-domain simulation. Mixture operation of DFIG and PMSG to optimize the stability of system has been analyzed firstly. The digital simulation results show that doubly-fed induction wind turbines is a better choice to meet the requirement of system instability due to large wind farm integration in comparison with direct-drive PM synchronous wind turbines. With a rather large rotary inertia, the proper ratio of direct-drive PM synchronous wind turbines used in wind farm could be comprehensive planning by optimized the stability of system. Analysis of this paper should be provided as academic reference for improving design of wind farm system.展开更多
With the rapid and large-scale development of renewable energy, the lack of new energy power transportation or consumption, and the shortage of grid peak-shifting ability have become increasingly serious. Aiming to th...With the rapid and large-scale development of renewable energy, the lack of new energy power transportation or consumption, and the shortage of grid peak-shifting ability have become increasingly serious. Aiming to the severe wind power curtailment issue, the characteristics of interactive load are studied upon the traditional day-ahead dispatch model to mitigate the influence of wind power fluctuation. A multi-objective optimal dispatch model with the minimum operating cost and power losses is built. Optimal power flow distribution is available when both generation and demand side participate in the resource allocation. The quantum particle swarm optimization (QPSO) algorithm is applied to convert multi-objective optimization problem into single objective optimization problem. The simulation results of IEEE 30-bus system verify that the proposed method can effectively reduce the operating cost and grid loss simultaneously enhancing the consumption of wind power.展开更多
While having constantly developed for five years,China's wind power meets its bottleneck of further development in fast-growing areas due to the insufficient market accommodation.In contrast,the Central China and ...While having constantly developed for five years,China's wind power meets its bottleneck of further development in fast-growing areas due to the insufficient market accommodation.In contrast,the Central China and the East China have experienced the shortage of coal,oil and natural gas for power generation in recent winters.Hence,how to handle the discrepancy between insufficient accommodation and short energy supply has become the focus of attention both domestically and abroad.Taking Jiuquan Wind Power Base as an example,the reverse distribution between the energy resources and the consumer market,the wind power accommodation and the energy transmission are analyzed;the necessity and feasibility of long-distance power transmission are also discussed,which presents a technical roadmap for the long-distance transmission of thermal and wind power in combination.展开更多
Due to the phenomenon of abandoning wind power and photo voltage(PV)power in the“Three Northern Areas”in China,this paper presents an optimal strategy for coordinating and dispatching“source-load”in power system b...Due to the phenomenon of abandoning wind power and photo voltage(PV)power in the“Three Northern Areas”in China,this paper presents an optimal strategy for coordinating and dispatching“source-load”in power system based on multiple time scales.On the basis of the analysis of the uncertainty of wind power and PV power as well as the characteristics of load side resource dispatching,the optimal model of coordinating and dispatching“source-load”in power system based on multiple time scales is established.It can simultaneously and effectively dispatch conventional generators,wind plant,PV power station,pumped-storage power station and load side resources by optimally using three time scales:day-ahead,intra-day and real-time.According to the latest predicted information of wind power,PV power and load,the original generation schedule can be rolled and amended by using the corresponding time scale.The effectiveness of the model can be verified by a real system.The simulation results show that the proposed model can make full use of“source-load”resources to improve the ability to consume wind power and PV power of the grid-connected system.展开更多
The grain boundary(GB)damage of long-term crept HR3C(25Cr–20Ni–Nb–N)austenitic steel with solid solution state was investigated by nanoindentation test accompanied with in-situ electron back-scattered diffraction.T...The grain boundary(GB)damage of long-term crept HR3C(25Cr–20Ni–Nb–N)austenitic steel with solid solution state was investigated by nanoindentation test accompanied with in-situ electron back-scattered diffraction.The corresponding microstructure was characterized by scanning electron microscopy and transmission electron microscopy.Results show that the increase in nanoindentation hardness at the GBs and triple grain junctions may be related to the dislocation accumulation and carbide growth during the creep.Coarsened M23C6 and dislocations piling-up at the GB accelerate the nucleation and coalescence of creep cavity along the GB.The nanoindentation hardness in grains varies with orientation of the stress axis.The orientation difference of neighbor grains may induce local high geometrically necessary dislocation densities and strain gradients near the GB,consequently causing stress concentration and subsequent crack growth at specific GBs.展开更多
This paper analyzes the fundamental frequency impedance presents a novel transmission line pilot protection scheme characteristic of a thyristor controlled series capacitor (TCSC) and based on fault component integr...This paper analyzes the fundamental frequency impedance presents a novel transmission line pilot protection scheme characteristic of a thyristor controlled series capacitor (TCSC) and based on fault component integrated impedance (FCII) calculated for a transmission line with TCSC and controllable shunt reactor (CSR). The FCII is defined as the ratio of the sum of the fault component voltage phasors of a transmission line with TCSC and CSR to the sum of the fault component current phasors where all the phasors are determined at both line's terminals. It can be used to distinguish internal faults occurring on the line from external ones. If the fault is an external one the FCII reflects the line's capacitive impedance and has large value. If the fault is an internal one on the line the FCII reflects the impedance of the equivalent system and the line and is relatively small. The new pilot protection scheme can be easily set and has the fault phase selection ability and also it is not affected by the capacitive current and the fault transition resistance. It is not sensitive to compensation level and dynamics of TCSC and CSR. The effectiveness of the new scheme is validated against data obtained in ATP simulations and Northwest China 750 kV Project.展开更多
基金supported by National High Technology Research and Development Program of China(863Program)(No.2011AA05A104)
文摘Several large-scale wind turbine tripping accidents occurred in Jiuquan wind power base in 2011.According to the on-site survey and analysis of these accidents related to relay protection,causes were found to be the collection system defects and low correct operation rate of small current grounded line selectors of the unearthed neutral point collection system.By referring to both the characteristics of Jiuquan wind power base and arrangement of relay protection,the short-circuit features of wind power and its impacts on relay protection are analyzed.The collection system and the retrofit of the small current grounded line selector are improved by specific countermeasures.Finally,further research subjects are put forward.
基金Youth Science and Technology Fund Project of Gansu Province(No.18JR3RA011)Major Projects in Gansu Province(No.17ZD2GA010)+1 种基金Science and Technology Projects Funding of State Grid Corporation(No.522727160001)Science and Technology Projects of State Grid Gansu Electric Power Company(No.52272716000K)
文摘To optimize peaking operation when high proportion new energy accesses to power grid,evaluation indexes are proposed which simultaneously consider wind-solar complementation and source-load coupling.A typical wind-solar power output scene model based on peaking demand is established which has anti-peaking characteristic.This model uses balancing scenes and key scenes with probability distribution based on improved Latin hypercube sampling(LHS)algorithm and scene reduction technology to illustrate the influence of wind-solar on peaking demand.Based on this,a peak shaving operation optimization model of high proportion new energy power generation is established.The various operating indexes after optimization in multi-scene peaking are calculated,and the ability of power grid peaking operation is compared whth that considering wind-solar complementation and source-load coupling.Finally,a case of high proportion new energy verifies the feasibility and validity of the proposed operation strategy.
基金supported by Major International Collaborative Project of National Natural Science Foundation of China(No.51120175001)Key Project of National Natural Science Foundation of China(No.50937003)
文摘There were many accidents of large-scale wind turbines disconnecting from power grid in 2011.As singlephase-to-ground fault cannot be correctly detected,single-phase-to-ground fault evolved to phase-to-phase fault.Phase-to-phase fault was isolated slowly,thus leading to low voltage.And wind turbines without enough low voltage ride-through capacity had to be disconnected from the grid.After some wind turbines being disconnected from the grid,overvoltage caused by reactive power surplus made more wind turbines disconnect from the grid.Based on the accident analysis,this paper presents solutions to above problems,including travelling waves based single-phase-to-ground protection,adaptive low voltage protection,integrated protection and control,and high impedance fault detection.The solutions lay foundations in theory and technology to prevent large-scale wind turbines disconnecting from the operating power grid.
文摘To analyze the factors which affecting transient stability of power system, the dynamic model of doubly-fed induction generator and direct-drive PM synchronous generator has been built using PSCAD. Impact of different wind farm integration on grid typically in China has been presented. The influence of the variations of transient reactance, negative sequence reactance and rotary inertia on critical clearing time of power system transient stability is analyzed by time-domain simulation. Mixture operation of DFIG and PMSG to optimize the stability of system has been analyzed firstly. The digital simulation results show that doubly-fed induction wind turbines is a better choice to meet the requirement of system instability due to large wind farm integration in comparison with direct-drive PM synchronous wind turbines. With a rather large rotary inertia, the proper ratio of direct-drive PM synchronous wind turbines used in wind farm could be comprehensive planning by optimized the stability of system. Analysis of this paper should be provided as academic reference for improving design of wind farm system.
文摘With the rapid and large-scale development of renewable energy, the lack of new energy power transportation or consumption, and the shortage of grid peak-shifting ability have become increasingly serious. Aiming to the severe wind power curtailment issue, the characteristics of interactive load are studied upon the traditional day-ahead dispatch model to mitigate the influence of wind power fluctuation. A multi-objective optimal dispatch model with the minimum operating cost and power losses is built. Optimal power flow distribution is available when both generation and demand side participate in the resource allocation. The quantum particle swarm optimization (QPSO) algorithm is applied to convert multi-objective optimization problem into single objective optimization problem. The simulation results of IEEE 30-bus system verify that the proposed method can effectively reduce the operating cost and grid loss simultaneously enhancing the consumption of wind power.
文摘While having constantly developed for five years,China's wind power meets its bottleneck of further development in fast-growing areas due to the insufficient market accommodation.In contrast,the Central China and the East China have experienced the shortage of coal,oil and natural gas for power generation in recent winters.Hence,how to handle the discrepancy between insufficient accommodation and short energy supply has become the focus of attention both domestically and abroad.Taking Jiuquan Wind Power Base as an example,the reverse distribution between the energy resources and the consumer market,the wind power accommodation and the energy transmission are analyzed;the necessity and feasibility of long-distance power transmission are also discussed,which presents a technical roadmap for the long-distance transmission of thermal and wind power in combination.
基金Major Projects of Gansu Province(No.17ZD2GA010)Power Company Technology Projects of State Grid Corporation in Gansu Province(No.52272716000K)
文摘Due to the phenomenon of abandoning wind power and photo voltage(PV)power in the“Three Northern Areas”in China,this paper presents an optimal strategy for coordinating and dispatching“source-load”in power system based on multiple time scales.On the basis of the analysis of the uncertainty of wind power and PV power as well as the characteristics of load side resource dispatching,the optimal model of coordinating and dispatching“source-load”in power system based on multiple time scales is established.It can simultaneously and effectively dispatch conventional generators,wind plant,PV power station,pumped-storage power station and load side resources by optimally using three time scales:day-ahead,intra-day and real-time.According to the latest predicted information of wind power,PV power and load,the original generation schedule can be rolled and amended by using the corresponding time scale.The effectiveness of the model can be verified by a real system.The simulation results show that the proposed model can make full use of“source-load”resources to improve the ability to consume wind power and PV power of the grid-connected system.
基金grateful for the financial support from the National Natural Science Foundation of China(51904156,51971163 and 51705082)the Open Fund of Jiangsu Wind Power Engineering Technology Center(ZK22-03-02)the Ten thousand talents project of Zhejiang Province(2019R52056).
文摘The grain boundary(GB)damage of long-term crept HR3C(25Cr–20Ni–Nb–N)austenitic steel with solid solution state was investigated by nanoindentation test accompanied with in-situ electron back-scattered diffraction.The corresponding microstructure was characterized by scanning electron microscopy and transmission electron microscopy.Results show that the increase in nanoindentation hardness at the GBs and triple grain junctions may be related to the dislocation accumulation and carbide growth during the creep.Coarsened M23C6 and dislocations piling-up at the GB accelerate the nucleation and coalescence of creep cavity along the GB.The nanoindentation hardness in grains varies with orientation of the stress axis.The orientation difference of neighbor grains may induce local high geometrically necessary dislocation densities and strain gradients near the GB,consequently causing stress concentration and subsequent crack growth at specific GBs.
基金supported by the National Natural Science Foundation of China (Grant Nos.50877061 and 51037005)
文摘This paper analyzes the fundamental frequency impedance presents a novel transmission line pilot protection scheme characteristic of a thyristor controlled series capacitor (TCSC) and based on fault component integrated impedance (FCII) calculated for a transmission line with TCSC and controllable shunt reactor (CSR). The FCII is defined as the ratio of the sum of the fault component voltage phasors of a transmission line with TCSC and CSR to the sum of the fault component current phasors where all the phasors are determined at both line's terminals. It can be used to distinguish internal faults occurring on the line from external ones. If the fault is an external one the FCII reflects the line's capacitive impedance and has large value. If the fault is an internal one on the line the FCII reflects the impedance of the equivalent system and the line and is relatively small. The new pilot protection scheme can be easily set and has the fault phase selection ability and also it is not affected by the capacitive current and the fault transition resistance. It is not sensitive to compensation level and dynamics of TCSC and CSR. The effectiveness of the new scheme is validated against data obtained in ATP simulations and Northwest China 750 kV Project.