The paper presents conclusions related to the design of shallow foundations,at the site where the Substation at Kashari,in Tirana is foreseen to be constructed.The project includes buildings with small to medium struc...The paper presents conclusions related to the design of shallow foundations,at the site where the Substation at Kashari,in Tirana is foreseen to be constructed.The project includes buildings with small to medium structures with 1-3 stories.The geological survey works include 6 boreholes of a depth 20.0 m,90 SPT(Standard Penetration Tests)tests,and laboratory works include 13 direct shear tests,27 unconfined and compressive strength tests,7 CU(consolidated undrained)tests and 9 UU(unconsolidated undrained)tests,etc.The foundation design must fulfill both,bearing and settlement criteria,but in this case the settlements of foundations are not possible to be calculated,since the laboratory works do not include any consolidation test.So,the local bearing capacity is expected to control the design in terms of bearing capacity and settlements.The local bearing capacity of shallow square foundations is evaluated by using Terzaghi’s formula,based on reduced shear strength parameters of soils below the bottom of foundations.The results are compared with the bearing capacity values calculated by using Burland and Burbdige(1984)method,based on the data of SPT tests.This method is used for checking the settlement(serviceability)criterion in the foundation design,when the direct settlement calculation is missing.The paper presents some conclusions related to local bearing capacity foundation-based design.展开更多
This paper aims to deal with the comparison of the estimated settlements derived by in situ tests with the observed settlements in site, in order to evaluate the accuracy of settlement prediction by in situ tests, in ...This paper aims to deal with the comparison of the estimated settlements derived by in situ tests with the observed settlements in site, in order to evaluate the accuracy of settlement prediction by in situ tests, in comparison not only with site observation by topographic means, but also with the values of settlements derived by numerical analysis by means of PLAXIS 2D and 3 D. The site where are carried out the tests and periodically are observed the settlements since the beginning of construction process, is located in the Oil Product Terminal, at the industrial park of Porto Romano, Durres, Albania. The main purpose of this project was the ground improvement by using preloading method in order to prevent liquefaction process and settlements. The data used to conduct this study are taken by the site investigation done after inserting into the soil vertical drains made of columns of free--draining gravel (gravel pile drains) until 14 m depth and center-to-center spacing of 2 m, and wick drains (premanufactured) until 25 m depth and center-to-center spacing of 1.8 m. The observed settlements are periodically measured by topographic equipments. This paper will present the conclusions derived by settlement analyzes from in situ tests and site observations.展开更多
文摘The paper presents conclusions related to the design of shallow foundations,at the site where the Substation at Kashari,in Tirana is foreseen to be constructed.The project includes buildings with small to medium structures with 1-3 stories.The geological survey works include 6 boreholes of a depth 20.0 m,90 SPT(Standard Penetration Tests)tests,and laboratory works include 13 direct shear tests,27 unconfined and compressive strength tests,7 CU(consolidated undrained)tests and 9 UU(unconsolidated undrained)tests,etc.The foundation design must fulfill both,bearing and settlement criteria,but in this case the settlements of foundations are not possible to be calculated,since the laboratory works do not include any consolidation test.So,the local bearing capacity is expected to control the design in terms of bearing capacity and settlements.The local bearing capacity of shallow square foundations is evaluated by using Terzaghi’s formula,based on reduced shear strength parameters of soils below the bottom of foundations.The results are compared with the bearing capacity values calculated by using Burland and Burbdige(1984)method,based on the data of SPT tests.This method is used for checking the settlement(serviceability)criterion in the foundation design,when the direct settlement calculation is missing.The paper presents some conclusions related to local bearing capacity foundation-based design.
文摘This paper aims to deal with the comparison of the estimated settlements derived by in situ tests with the observed settlements in site, in order to evaluate the accuracy of settlement prediction by in situ tests, in comparison not only with site observation by topographic means, but also with the values of settlements derived by numerical analysis by means of PLAXIS 2D and 3 D. The site where are carried out the tests and periodically are observed the settlements since the beginning of construction process, is located in the Oil Product Terminal, at the industrial park of Porto Romano, Durres, Albania. The main purpose of this project was the ground improvement by using preloading method in order to prevent liquefaction process and settlements. The data used to conduct this study are taken by the site investigation done after inserting into the soil vertical drains made of columns of free--draining gravel (gravel pile drains) until 14 m depth and center-to-center spacing of 2 m, and wick drains (premanufactured) until 25 m depth and center-to-center spacing of 1.8 m. The observed settlements are periodically measured by topographic equipments. This paper will present the conclusions derived by settlement analyzes from in situ tests and site observations.