This paper introduces an applicable test plan for emergency diesel generator in nuclear power plant. It advances improvement approaches with problems found during field commissioning test and its trouble-shooting proc...This paper introduces an applicable test plan for emergency diesel generator in nuclear power plant. It advances improvement approaches with problems found during field commissioning test and its trouble-shooting processes. The method is based on the integration of complementary through, the extension theory of matter-element model and neural network theory combine to overcome a neural network to learn shelters, and other defects. The purpose of this paper is to provide the better running and commissioning experience for the similar emergency generator unit.展开更多
The coordination correctness of Nuclear power plant current transformer (CT)/ voltage transformer (PT) polarity and relay protection is often verified through the dynamic test on the unit no load / load operating cond...The coordination correctness of Nuclear power plant current transformer (CT)/ voltage transformer (PT) polarity and relay protection is often verified through the dynamic test on the unit no load / load operating conditions. This paper proposes a test method to prevent and circumvent the failure of the dynamic test abnormality caused by the static power test before the plant power is applied and the whole group is started. Reduce the dynamic test workload and test difficulty, to ensure that the dynamic test safety risk control and control in the state.展开更多
文摘This paper introduces an applicable test plan for emergency diesel generator in nuclear power plant. It advances improvement approaches with problems found during field commissioning test and its trouble-shooting processes. The method is based on the integration of complementary through, the extension theory of matter-element model and neural network theory combine to overcome a neural network to learn shelters, and other defects. The purpose of this paper is to provide the better running and commissioning experience for the similar emergency generator unit.
文摘The coordination correctness of Nuclear power plant current transformer (CT)/ voltage transformer (PT) polarity and relay protection is often verified through the dynamic test on the unit no load / load operating conditions. This paper proposes a test method to prevent and circumvent the failure of the dynamic test abnormality caused by the static power test before the plant power is applied and the whole group is started. Reduce the dynamic test workload and test difficulty, to ensure that the dynamic test safety risk control and control in the state.