Explicit solution techniques have been widely used in geotechnical engineering for simulating the coupled hydro-mechanical(H-M) interaction of fluid flow and deformation induced by structures built above and under sat...Explicit solution techniques have been widely used in geotechnical engineering for simulating the coupled hydro-mechanical(H-M) interaction of fluid flow and deformation induced by structures built above and under saturated ground, i.e. circular footing and deep tunnel. However, the technique is only conditionally stable and requires small time steps, portending its inefficiency for simulating large-scale H-M problems. To improve its efficiency, the unconditionally stable alternating direction explicit(ADE)scheme could be used to solve the flow problem. The standard ADE scheme, however, is only moderately accurate and is restricted to uniform grids and plane strain flow conditions. This paper aims to remove these drawbacks by developing a novel high-order ADE scheme capable of solving flow problems in nonuniform grids and under axisymmetric conditions. The new scheme is derived by performing a fourthorder finite difference(FD) approximation to the spatial derivatives of the axisymmetric fluid-diffusion equation in a non-uniform grid configuration. The implicit Crank-Nicolson technique is then applied to the resulting approximation, and the subsequent equation is split into two alternating direction sweeps,giving rise to a new axisymmetric ADE scheme. The pore pressure solutions from the new scheme are then sequentially coupled with an existing geomechanical simulator in the computer code fast Lagrangian analysis of continua(FLAC). This coupling procedure is called the sequentially-explicit coupling technique based on the fourth-order axisymmetric ADE scheme or SEA-4-AXI. Application of SEA-4-AXI for solving axisymmetric consolidation of a circular footing and of advancing tunnel in deep saturated ground shows that SEA-4-AXI reduces computer runtime up to 42%-50% that of FLAC’s basic scheme without numerical instability. In addition, it produces high numerical accuracy of the H-M solutions with average percentage difference of only 0.5%-1.8%.展开更多
Cibaliung Underground Gold Mine applies cut and fill mining method to optimize ore production and maintain underground stability. Existing 5 m × 5 m height and width of stope geometry has a potential new design t...Cibaliung Underground Gold Mine applies cut and fill mining method to optimize ore production and maintain underground stability. Existing 5 m × 5 m height and width of stope geometry has a potential new design to increase production of gold due to variety of thick ore, however serious shotcrete failures often occur in hanging wall decline. This paper aims to find out the relationship between stope design and stability of hanging wall decline. The analysis conducted in this study is based on underground characteristics and geological condition of Cibaliung area. The impact of stope design on decline stability was analyzed by using numerical methods. The impact factors such as different rock mass, size of stope, and distance between stope and hanging wall decline were used in the analysis of underground stability especially stability on hanging wall decline.展开更多
Rockfalls are one of the hazards that may be associated with open pit mining. The majority of rockfalls occur due to the existing conditions of slopes, such as back break, fractures and joints. Constructing a berm on ...Rockfalls are one of the hazards that may be associated with open pit mining. The majority of rockfalls occur due to the existing conditions of slopes, such as back break, fractures and joints. Constructing a berm on the catch bench is a popular method for the mitigation of rockfall hazards in open pit mining.The width of the catch bench and the height of the berm play a major role in the open pit bench design.However, there is no systematic method currently available to optimize the size of these parameters. This study proposes a novel methodology which calculates the optimum catch bench width by integrating the rockfall simulation model and genetic algorithm into a Simulation-Optimization Model. The proposed methodology is useful when used to determine the minimum catch bench width, or the maximum overall slope angle, insuring that a sufficient factor of safety of the slope is included while maximizing the overall profitability of the open pit mine.展开更多
基金the support from the University Transportation Center for Underground Transportation Infrastructure at the Colorado School of Mines for partially funding this research under Grant No. 69A3551747118 of the Fixing America's Surface Transportation Act (FAST Act) of U.S. DoT FY2016
文摘Explicit solution techniques have been widely used in geotechnical engineering for simulating the coupled hydro-mechanical(H-M) interaction of fluid flow and deformation induced by structures built above and under saturated ground, i.e. circular footing and deep tunnel. However, the technique is only conditionally stable and requires small time steps, portending its inefficiency for simulating large-scale H-M problems. To improve its efficiency, the unconditionally stable alternating direction explicit(ADE)scheme could be used to solve the flow problem. The standard ADE scheme, however, is only moderately accurate and is restricted to uniform grids and plane strain flow conditions. This paper aims to remove these drawbacks by developing a novel high-order ADE scheme capable of solving flow problems in nonuniform grids and under axisymmetric conditions. The new scheme is derived by performing a fourthorder finite difference(FD) approximation to the spatial derivatives of the axisymmetric fluid-diffusion equation in a non-uniform grid configuration. The implicit Crank-Nicolson technique is then applied to the resulting approximation, and the subsequent equation is split into two alternating direction sweeps,giving rise to a new axisymmetric ADE scheme. The pore pressure solutions from the new scheme are then sequentially coupled with an existing geomechanical simulator in the computer code fast Lagrangian analysis of continua(FLAC). This coupling procedure is called the sequentially-explicit coupling technique based on the fourth-order axisymmetric ADE scheme or SEA-4-AXI. Application of SEA-4-AXI for solving axisymmetric consolidation of a circular footing and of advancing tunnel in deep saturated ground shows that SEA-4-AXI reduces computer runtime up to 42%-50% that of FLAC’s basic scheme without numerical instability. In addition, it produces high numerical accuracy of the H-M solutions with average percentage difference of only 0.5%-1.8%.
文摘Cibaliung Underground Gold Mine applies cut and fill mining method to optimize ore production and maintain underground stability. Existing 5 m × 5 m height and width of stope geometry has a potential new design to increase production of gold due to variety of thick ore, however serious shotcrete failures often occur in hanging wall decline. This paper aims to find out the relationship between stope design and stability of hanging wall decline. The analysis conducted in this study is based on underground characteristics and geological condition of Cibaliung area. The impact of stope design on decline stability was analyzed by using numerical methods. The impact factors such as different rock mass, size of stope, and distance between stope and hanging wall decline were used in the analysis of underground stability especially stability on hanging wall decline.
文摘Rockfalls are one of the hazards that may be associated with open pit mining. The majority of rockfalls occur due to the existing conditions of slopes, such as back break, fractures and joints. Constructing a berm on the catch bench is a popular method for the mitigation of rockfall hazards in open pit mining.The width of the catch bench and the height of the berm play a major role in the open pit bench design.However, there is no systematic method currently available to optimize the size of these parameters. This study proposes a novel methodology which calculates the optimum catch bench width by integrating the rockfall simulation model and genetic algorithm into a Simulation-Optimization Model. The proposed methodology is useful when used to determine the minimum catch bench width, or the maximum overall slope angle, insuring that a sufficient factor of safety of the slope is included while maximizing the overall profitability of the open pit mine.