期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
A Concept Solution of Anchored Diaphragm Wall in Central Part of Budva Town
1
作者 Helidon Kokona 《Journal of Civil Engineering and Architecture》 2025年第10期484-492,共9页
In this paper is presented a concept solution and acceptance test application procedure of deep pit protection structure,intended for three underground levels of residential building:A,B,C,D,block 10C,Budva,Montenegro... In this paper is presented a concept solution and acceptance test application procedure of deep pit protection structure,intended for three underground levels of residential building:A,B,C,D,block 10C,Budva,Montenegro.The anchored wall used consist of nongravity cantilevered walls with three levels of ground anchors.Nongravity cantilevered walls employ continuous walls constructed in slurry trenches(i.e.,slurry(diaphragm)walls),e.g vertical elements that are drilled to depths below the finished excavation grade.For those nongravity cantilevered walls,support is provided through the shear and bending stiffness of the vertical wall elements and passive resistance from the soil below the finished excavation grade.Anchored wall support relies on these components as well as lateral resistance provided by the ground anchors to resist horizontal pressures(e.g.,earth,water,external loads)acting on the wall.Anchored wall analysed and applied is temporary supporting structure necessary for the excavation and erection of the underground structure part up to ground surface level.Temporary ground anchors lifetime is up to two years.Dynamic loads are not considered. 展开更多
关键词 Anchored retaining walls slurry walls deep excavation support ground anchors
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部