The ability of power system to survive the transition from preloading state to the gradual increase in load and thereafter reach an acceptable operational condition is an indication of transient stability of the syste...The ability of power system to survive the transition from preloading state to the gradual increase in load and thereafter reach an acceptable operational condition is an indication of transient stability of the system. The study analyzed load shedding scheme through the use of empirical measurement tools and load-flow simulation techniques. It was geared towards determining effective load shedding strategies to reduce unnecessary overload in order to achieve dynamic stability of the electric power network in the Export Free Trade Zone, Calabar, Nigeria. From the tests and the measurements taken, it was observed that the real and reactive powers from the generator and the mechanical power from the turbine engine were stable when the load shedding controller was switched on, as compared to when it was off. The engine speed, the bus-bar frequency and the output voltage of the generator stabilized within a shorter time (about 8 seconds) when the controller was switched on than when it was on the off condition. Also, there were noticeable fluctuations in the speed of the remaining two generators. It became stable at about 12 seconds after the loss. The variations were 0.3 per cent of the nominal speed value. The excitation voltage fluctuated from 1.2 (pu) to 4.5 (pu) when the bus voltage dipped as a result of additional load. It then came down and stabilized at 1.8 (pu) after few swings. This confirmed that the stability of power system is much enhanced when load shedding controllers are effectively configured on the network.展开更多
The purpose of this paper is to build a secured and reliable vehicle anti-theft system which will have the ability to access the vehicle subsystems from a remote location where there is GSM network. And also, the desi...The purpose of this paper is to build a secured and reliable vehicle anti-theft system which will have the ability to access the vehicle subsystems from a remote location where there is GSM network. And also, the design method involves the interfacing of GSM/GPRS modem module with the vehicle ignition subsystem, and the test result shows that it performs some control actions on the vehicle subsystems from a mobile phone, having taken the advantage of the wide coverage area of some GSM networks. Hence the topic is “Remotely Controlled Vehicle Anti-theft System via GSM Network”.展开更多
Maximum Power Point Tracking (MPPT) is an important process in Photovoltaic (PV) systems because of the need to extract maximum power from PV panels used in these systems. Without the ability to track and have PV pane...Maximum Power Point Tracking (MPPT) is an important process in Photovoltaic (PV) systems because of the need to extract maximum power from PV panels used in these systems. Without the ability to track and have PV panels operate at its maximum power point (MPP) entails power losses;resulting in high cost since more panels will be required to provide specified energy needs. To achieve high efficiency and low cost, MPPT has therefore become an imperative in PV systems. In this study, an MPP tracker is modeled using the IC algorithm and its behavior under rapidly changing environmental conditions of temperature and irradiation levels is investigated. This algorithm, based on knowledge of the variation of the conductance of PV cells and the operating point with respect to the voltage and current of the panel calculates the slope of the power characteristics to determine the MPP as the peak of the curve. A simple circuit model of the DC-DC boost converter connected to a PV panel is used in the simulation;and the output of the boost converter is fed through a 3-phase inverter to an electricity grid. The model was simulated and tested using MATLAB/Simulink. Simulation results show the effectiveness of the IC algorithm for tracking the MPP in PV systems operating under rapidly changing temperatures and irradiations with a settling time of 2 seconds.展开更多
Sawdust which is basically considered as?a timber-industrial waste?that pollutes the environment can become a valuable commodity which is considered in three ways: Manufacturing, Energy and Agricultural utilization. T...Sawdust which is basically considered as?a timber-industrial waste?that pollutes the environment can become a valuable commodity which is considered in three ways: Manufacturing, Energy and Agricultural utilization. The sawdust is burnt in an updraft gasifier under a limited supply of air to obtain?producer gas which is carbon II oxide and hydrogen as main components. The sawdust and other biomass materials are mixed in certain proportions, then bound together and palletized to a small blocks called briquettes. The material?was also considered to be composted by mixing it with animal digestion or?wood ashes and calcium carbonate to form fertilizers. The sawdust and wood shavings can be used for particle board as well as oil production.展开更多
Power system stability is a very important issue in power system engineering because a decrease in the stability margins can cause unacceptable operating conditions, which leads to frequent failures. In this paper, SK...Power system stability is a very important issue in power system engineering because a decrease in the stability margins can cause unacceptable operating conditions, which leads to frequent failures. In this paper, SKM POWER TOOLS PTW-32 Version 4.5.2.0 was used to study different Stability recovery tests after a medium voltage short circuit fault on a turbine generator in the power system. The analysis focused on the generator electrical and mechanical powers stability recovery test, generator speed stability recovery test, excitation voltage stability recovery test, bus voltage and bus frequency stability recovery test. In our study, when the introduced fault was cleared after 0.5 s, it reveals that the recovery rate of electrical power was much faster than that of mechanical power. Also, the results reveal that it took about 10 seconds for the turbine speed to stabilize while it took fewer seconds for the frequency to stabilize.展开更多
In modern motoring, many factors are considered to realize driving convenience and achieving safety at a reasonable cost. A drive towards effective management of traffic and parking space allocation in urban centres u...In modern motoring, many factors are considered to realize driving convenience and achieving safety at a reasonable cost. A drive towards effective management of traffic and parking space allocation in urban centres using intelligent software applications is currently being developed and deployed as GPS enabled service to consumers in automobiles or smartphone applications for convenience, safety and economic benefits. Building a fuzzy logic inference for such applications may have numerous approaches such as algorithms in Pascal or C-languages and of course using an effective fuzzy logic toolbox. Referring to a case report based on IrisNet project analysis, in this paper Matlab fuzzy logic toolbox is used in developing an inference for managing traffic flow and parking allocation with generalized feature that is open for modification. Being that modifications can be done within any or all among the tool’s universe of discourse, increment in the number of membership functions and changing input and output variables etc, the work here is limited within changes at input and output variables and bases of universe of discourse. The process implications is shown as plotted by the toolbox in surface and rule views, implying that the inference is flexibly open for modifications to suit area of application within reasonable time frame no matter how complex. The travel time to the parking space being an output variable in the current inference is recommended to be substituted with distance to parking space as the former is believed to affect driving habits among motorist, whom may require the inference to as well cover other important locations such as nearest or cheapest gas station, hotels, hospitals etc.展开更多
The increasing demand for airline services amidst limited resources results in passenger dissatisfaction and dwindling revenue for airports and airlines. The dynamics of service demand and resource supply results in c...The increasing demand for airline services amidst limited resources results in passenger dissatisfaction and dwindling revenue for airports and airlines. The dynamics of service demand and resource supply results in check-in issues for the stakeholders in the commercial aviation industry. This has the effect of impacting negatively on service performance, cost of operations, customer satisfaction, and overall throughput. Hence, this paper modelled the travelers’ check-in process at the “D Wing” of the Departure Section of Murtala Muhammed International Airport (MMIA), Ikeja, using Arena Software Tool. The work was carried out by determining the parameters of the queues at designated service points in the check-in process. The primary data required to develop the model were acquired by direct observation of passenger flow and oral interview. Thus, the average check-in time was determined. Thereafter, a model of the international check-in system of the MMIA was developed using Arena software in combination with Microsoft Office tools. The data collected were therefore inputted into the model and simulated;the real result was compared with the simulation result of 133 completions and there was no significant difference. The result showed that the model is a representation of the real system under study. Further work will be tailored towards simulation (<em>i.e</em>. the model will be subjected to experimentation in order to have different scenario).展开更多
With the current situation of insecurity in Nigeria and the worsening condition of Nigerian roads, there is increasing demand for air travel. This increasing demand for airline services amidst limited resources result...With the current situation of insecurity in Nigeria and the worsening condition of Nigerian roads, there is increasing demand for air travel. This increasing demand for airline services amidst limited resources results in passenger dissatisfaction and reduction of revenue for airports and airlines. The dynamics of service demand and resource supply result in check-in issues for all the stakeholders in the commercial aviation industry. Hence, this research simulated the developed model for travelers’ check-in process at the “D Wing” of the Departure Section of Murtala Muhammed International Airport (MMIA), Ikeja, using Arena Software Tool. The simulation of the developed model was carried out by varying five different configurations of the servers with respect to the baggage weighing machines and passenger profiling devices to obtain the minimum average check-in time (ACT) for the process, with each configuration undergoing 133 completions of simulation runs. The result of the experimentation revealed that the 3 × 3 × 4 configuration of servers produced the smallest ACT of 18.25 minutes. This translates to a difference of about 58 minutes from the 76.16 minutes ACT of the real system;representing about 76% improvement in the check-in time of passengers. This study contributed to knowledge by revealing that the main choke points in the MMIA check-in system occur at the baggage weighing and passenger profiling areas as against the check-in counter sub-section as advanced by previous works. Furthermore, the research added value to knowledge by creating a balance between customer satisfaction and cost of operations thereby accommodating the interests of the passenger and the operator who are the two main stakeholders in the commercial aviation industry.展开更多
Instrument calibration is vital to a successful control system because signal inputs to the system controllers come from such instruments. This paper presents a method for actualizing a standard low-cost loop calibrat...Instrument calibration is vital to a successful control system because signal inputs to the system controllers come from such instruments. This paper presents a method for actualizing a standard low-cost loop calibrator for the famous 4-20 mA electrical signaling scheme. The loop calibrator generates a linear current signal from 4 to 20 mA over a 250 ? typical process instrument load for calibration. The realization of the loop calibrator relies on a voltage-to-current converter to build a constant current source. The voltage controlled constant current source is built from discrete components and an op-amp to keep the cost low. Results from simulations and the prototype demonstrate the performance of the 4-20 mA loop calibrator which utilizes a greatly reduced number of components. The cost of these components is approximately 34% of the least expensive calibrator sampled, though other production costs are not included. This conclusion reinforces the fact that loop calibrators can be cheaper.展开更多
文摘The ability of power system to survive the transition from preloading state to the gradual increase in load and thereafter reach an acceptable operational condition is an indication of transient stability of the system. The study analyzed load shedding scheme through the use of empirical measurement tools and load-flow simulation techniques. It was geared towards determining effective load shedding strategies to reduce unnecessary overload in order to achieve dynamic stability of the electric power network in the Export Free Trade Zone, Calabar, Nigeria. From the tests and the measurements taken, it was observed that the real and reactive powers from the generator and the mechanical power from the turbine engine were stable when the load shedding controller was switched on, as compared to when it was off. The engine speed, the bus-bar frequency and the output voltage of the generator stabilized within a shorter time (about 8 seconds) when the controller was switched on than when it was on the off condition. Also, there were noticeable fluctuations in the speed of the remaining two generators. It became stable at about 12 seconds after the loss. The variations were 0.3 per cent of the nominal speed value. The excitation voltage fluctuated from 1.2 (pu) to 4.5 (pu) when the bus voltage dipped as a result of additional load. It then came down and stabilized at 1.8 (pu) after few swings. This confirmed that the stability of power system is much enhanced when load shedding controllers are effectively configured on the network.
文摘The purpose of this paper is to build a secured and reliable vehicle anti-theft system which will have the ability to access the vehicle subsystems from a remote location where there is GSM network. And also, the design method involves the interfacing of GSM/GPRS modem module with the vehicle ignition subsystem, and the test result shows that it performs some control actions on the vehicle subsystems from a mobile phone, having taken the advantage of the wide coverage area of some GSM networks. Hence the topic is “Remotely Controlled Vehicle Anti-theft System via GSM Network”.
文摘Maximum Power Point Tracking (MPPT) is an important process in Photovoltaic (PV) systems because of the need to extract maximum power from PV panels used in these systems. Without the ability to track and have PV panels operate at its maximum power point (MPP) entails power losses;resulting in high cost since more panels will be required to provide specified energy needs. To achieve high efficiency and low cost, MPPT has therefore become an imperative in PV systems. In this study, an MPP tracker is modeled using the IC algorithm and its behavior under rapidly changing environmental conditions of temperature and irradiation levels is investigated. This algorithm, based on knowledge of the variation of the conductance of PV cells and the operating point with respect to the voltage and current of the panel calculates the slope of the power characteristics to determine the MPP as the peak of the curve. A simple circuit model of the DC-DC boost converter connected to a PV panel is used in the simulation;and the output of the boost converter is fed through a 3-phase inverter to an electricity grid. The model was simulated and tested using MATLAB/Simulink. Simulation results show the effectiveness of the IC algorithm for tracking the MPP in PV systems operating under rapidly changing temperatures and irradiations with a settling time of 2 seconds.
文摘Sawdust which is basically considered as?a timber-industrial waste?that pollutes the environment can become a valuable commodity which is considered in three ways: Manufacturing, Energy and Agricultural utilization. The sawdust is burnt in an updraft gasifier under a limited supply of air to obtain?producer gas which is carbon II oxide and hydrogen as main components. The sawdust and other biomass materials are mixed in certain proportions, then bound together and palletized to a small blocks called briquettes. The material?was also considered to be composted by mixing it with animal digestion or?wood ashes and calcium carbonate to form fertilizers. The sawdust and wood shavings can be used for particle board as well as oil production.
文摘Power system stability is a very important issue in power system engineering because a decrease in the stability margins can cause unacceptable operating conditions, which leads to frequent failures. In this paper, SKM POWER TOOLS PTW-32 Version 4.5.2.0 was used to study different Stability recovery tests after a medium voltage short circuit fault on a turbine generator in the power system. The analysis focused on the generator electrical and mechanical powers stability recovery test, generator speed stability recovery test, excitation voltage stability recovery test, bus voltage and bus frequency stability recovery test. In our study, when the introduced fault was cleared after 0.5 s, it reveals that the recovery rate of electrical power was much faster than that of mechanical power. Also, the results reveal that it took about 10 seconds for the turbine speed to stabilize while it took fewer seconds for the frequency to stabilize.
文摘In modern motoring, many factors are considered to realize driving convenience and achieving safety at a reasonable cost. A drive towards effective management of traffic and parking space allocation in urban centres using intelligent software applications is currently being developed and deployed as GPS enabled service to consumers in automobiles or smartphone applications for convenience, safety and economic benefits. Building a fuzzy logic inference for such applications may have numerous approaches such as algorithms in Pascal or C-languages and of course using an effective fuzzy logic toolbox. Referring to a case report based on IrisNet project analysis, in this paper Matlab fuzzy logic toolbox is used in developing an inference for managing traffic flow and parking allocation with generalized feature that is open for modification. Being that modifications can be done within any or all among the tool’s universe of discourse, increment in the number of membership functions and changing input and output variables etc, the work here is limited within changes at input and output variables and bases of universe of discourse. The process implications is shown as plotted by the toolbox in surface and rule views, implying that the inference is flexibly open for modifications to suit area of application within reasonable time frame no matter how complex. The travel time to the parking space being an output variable in the current inference is recommended to be substituted with distance to parking space as the former is believed to affect driving habits among motorist, whom may require the inference to as well cover other important locations such as nearest or cheapest gas station, hotels, hospitals etc.
文摘The increasing demand for airline services amidst limited resources results in passenger dissatisfaction and dwindling revenue for airports and airlines. The dynamics of service demand and resource supply results in check-in issues for the stakeholders in the commercial aviation industry. This has the effect of impacting negatively on service performance, cost of operations, customer satisfaction, and overall throughput. Hence, this paper modelled the travelers’ check-in process at the “D Wing” of the Departure Section of Murtala Muhammed International Airport (MMIA), Ikeja, using Arena Software Tool. The work was carried out by determining the parameters of the queues at designated service points in the check-in process. The primary data required to develop the model were acquired by direct observation of passenger flow and oral interview. Thus, the average check-in time was determined. Thereafter, a model of the international check-in system of the MMIA was developed using Arena software in combination with Microsoft Office tools. The data collected were therefore inputted into the model and simulated;the real result was compared with the simulation result of 133 completions and there was no significant difference. The result showed that the model is a representation of the real system under study. Further work will be tailored towards simulation (<em>i.e</em>. the model will be subjected to experimentation in order to have different scenario).
文摘With the current situation of insecurity in Nigeria and the worsening condition of Nigerian roads, there is increasing demand for air travel. This increasing demand for airline services amidst limited resources results in passenger dissatisfaction and reduction of revenue for airports and airlines. The dynamics of service demand and resource supply result in check-in issues for all the stakeholders in the commercial aviation industry. Hence, this research simulated the developed model for travelers’ check-in process at the “D Wing” of the Departure Section of Murtala Muhammed International Airport (MMIA), Ikeja, using Arena Software Tool. The simulation of the developed model was carried out by varying five different configurations of the servers with respect to the baggage weighing machines and passenger profiling devices to obtain the minimum average check-in time (ACT) for the process, with each configuration undergoing 133 completions of simulation runs. The result of the experimentation revealed that the 3 × 3 × 4 configuration of servers produced the smallest ACT of 18.25 minutes. This translates to a difference of about 58 minutes from the 76.16 minutes ACT of the real system;representing about 76% improvement in the check-in time of passengers. This study contributed to knowledge by revealing that the main choke points in the MMIA check-in system occur at the baggage weighing and passenger profiling areas as against the check-in counter sub-section as advanced by previous works. Furthermore, the research added value to knowledge by creating a balance between customer satisfaction and cost of operations thereby accommodating the interests of the passenger and the operator who are the two main stakeholders in the commercial aviation industry.
文摘Instrument calibration is vital to a successful control system because signal inputs to the system controllers come from such instruments. This paper presents a method for actualizing a standard low-cost loop calibrator for the famous 4-20 mA electrical signaling scheme. The loop calibrator generates a linear current signal from 4 to 20 mA over a 250 ? typical process instrument load for calibration. The realization of the loop calibrator relies on a voltage-to-current converter to build a constant current source. The voltage controlled constant current source is built from discrete components and an op-amp to keep the cost low. Results from simulations and the prototype demonstrate the performance of the 4-20 mA loop calibrator which utilizes a greatly reduced number of components. The cost of these components is approximately 34% of the least expensive calibrator sampled, though other production costs are not included. This conclusion reinforces the fact that loop calibrators can be cheaper.