期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Using sequential analysis procedures to rank the influencing factors of public work’s quality
1
作者 YANG Chau-ping 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2006年第3期330-334,共5页
In order to improve the efficiency in management of public work projects, screening and controlling influencing factors affecting the quality of a public work project is essential. This study synthesized 9 influential... In order to improve the efficiency in management of public work projects, screening and controlling influencing factors affecting the quality of a public work project is essential. This study synthesized 9 influential categories including 91 factors related to quality management of public works in Taiwan using a sequential analysis procedure. According to the Borda-values of influencing factors obtained from a first stage questionnaire, the number of primary factors selected by the re-sponsible entities and the design-supervisory entities were 44 and 45 respectively. A Fuzzy Analytic Hierarchy Process (FAHP) was used to prioritize and rank these factors. The top five factors ranked by the responsible entities were (1) introduction of the earned value analysis, (2) working efficiency, (3) environmental laws and regulations, (4) price-index fluctuation, and (5) on-site safety management. The top five factors ranked by the design-supervisory entities were (1) man power, (2) laws and regulations, (3) price-index fluctuation, (4) traffic conditions, and (5) faulty design. 展开更多
关键词 FAHP Public works Quality management Influencing factors
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部