期刊文献+
共找到19篇文章
< 1 >
每页显示 20 50 100
Floating Production Platforms and their Applications in the Development of Oil and Gas Fields in the South China Sea 被引量:3
1
作者 Dagang Zhang Yongjun Chen Tianyu Zhang 《Journal of Marine Science and Application》 2014年第1期67-75,共9页
This paper studies the current available options for floating production platforms in developing deepwater oil fields and the potential development models of future oil and gas exploration in the South China Sea. A de... This paper studies the current available options for floating production platforms in developing deepwater oil fields and the potential development models of future oil and gas exploration in the South China Sea. A detailed review of current deepwater platforms worldwide was performed through the examples of industry projects, and the pros and cons of each platform are discussed. Four types of platforms are currently used for the deepwater development: tension leg platform, Spar, semi-submersible platform, and the floating production system offloading. Among these, the TLP and Spar can be used for dry tree applications, and have gained popularity in recent years. The dry tree application enables the extension of the drilling application for fixed platforms into floating systems, and greatly reduces the cost and complexity of the subsea operation. Newly built wet tree semi-submersible production platforms for ultra deepwater are also getting their application, mainly due to the much needed payload for deepwater making the conversion of the old drilling semi-submersible platforms impossible. These platforms have been used in different fields around the world for different environments; each has its own advantages and disadvantages. There are many challenges with the successful use of these floating platforms. A lot of lessons have been learned and extensive experience accumulated through the many project applications. Key technologies are being reviewed for the successful use of floating platforms for field development, and potential future development needs are being discussed. Some of the technologies and experience of platform applications can be well used for the development of the South China Sea oil and gas field. 展开更多
关键词 FLOATING PLATFORM DEEPWATER development OIL fielddevelopment DEEPWATER technology PLATFORM HOST
在线阅读 下载PDF
Riser VIV and its numerical simulation 被引量:5
2
作者 Kevin Huang 《Engineering Sciences》 EI 2013年第4期55-60,共6页
This paper summarizes some of the typical riser vortex-induced vibration (VIV) problems in subsea oil and gas developments, and presents the corresponding computational fluid dynamics (CFD) time domain simula- tio... This paper summarizes some of the typical riser vortex-induced vibration (VIV) problems in subsea oil and gas developments, and presents the corresponding computational fluid dynamics (CFD) time domain simula- tion results to address these problems. First, the CFD time domain simulation approach was applied to analyze the wake field behind a stationary cylinder and a vibrating cylinder. Then a vertical riser VIV response under uniform current was studied. The VIV response time histories revealed some valuable clues that could lead to explanation of the higher harmonics. After that, a vertical riser VIV response under shear current was investigated. A 3 000 ft (1 ft=-0.304 8 m) water depth top tensioned riser was sized, and its VIV responses under uniform and shear current were studied. Then this paper continues to discuss one catenary flexible riser VIV response during normal lay. Last, the time domain simulation approach was applied to a partially submerged flexible jumper, to study the jumper VIV behavior, and dynamic motion envelopes. It was demonstrated that the time domain simulation ap- proach is able to disclose details of the flow field, vortex shedding pattern, and riser dynamic behavior, and han- dle different tvoes of risers under different Woe of currents. 展开更多
关键词 RISER PIPELINE FLEXIBLE CYLINDER VIV numerical simulation CFD
在线阅读 下载PDF
Suppression of Vortex-Induced Vibration by Fairings on Marine Risers 被引量:7
3
作者 KANG Yongtian XIAO Wensheng +2 位作者 WANG Quanbin ZHANG Dagang ZHAO Jun 《Journal of Ocean University of China》 SCIE CAS CSCD 2020年第2期298-306,共9页
Vortex-induced vibration is quite common during the operation of offshore risers or umbilical cables,commonly leading to serious damage to risers and reduced service life.Vortex-induced vibration of the offshore riser... Vortex-induced vibration is quite common during the operation of offshore risers or umbilical cables,commonly leading to serious damage to risers and reduced service life.Vortex-induced vibration of the offshore risers could be effectively suppressed by fairing devices.In this paper,a newly developed vortex-induced vibration fairing and large eddy simulation model of the FLUENT software were used for numerical analysis,experimental research and stimulating vortex-induced vibration at 0.1–2 ms^-1.The data of the numerical model with fairing was compared and analyzed to study the vortex shedding frequency at different Reynolds numbers and changes in drag and lift coefficients.The displacement state of 12 in risers with and without fairing was experimentally tested using a five degree-of-freedom balance.The vortex-induced vibration effect of the fairing was tested at different velocities.The result shows the drag reduction effect of the fairing is more obvious when the flow velocity is 0.4–1.2 ms^-1 and the maximum drag reduction reaches 55.6%when the flow velocity is 0.6 ms^-1.Additionally,the drag reduction effect was obvious when the flow velocity was greater than 1.3 ms^-1 and less than 0.3.The result indicates that the developed 12 in fairing,with good potential in engineering applications,has good vortex-induced vibration-suppression effects. 展开更多
关键词 vortex-induced vibration faring devices finite element analysis TESTING
在线阅读 下载PDF
Tension leg platform project execution 被引量:5
4
作者 Zhang Dagang Wang Chunsheng Zhang Tianyu 《Engineering Sciences》 EI 2013年第4期79-85,共7页
The first floating platform concept design work for South China Sea is undergoing in DMAR's office now. This tension leg platform has potential to become the first advanced floating production platform project. Pr... The first floating platform concept design work for South China Sea is undergoing in DMAR's office now. This tension leg platform has potential to become the first advanced floating production platform project. Project execution is always a challenge for floating system. This paper focuses on the critical elements of project execution for tension leg platform,and studies potential implications to future oil and gas exploration in South China Sea. There are many factors affecting successful execution of floating system project,including technical issues, engineering management,interface management,etc. There are also failure examples of project execution in the industry. The author has participated 28 large detailed projects and has gained extensive experience on floating projects,with ample hands-on project experiences. A detailed tension leg platform project study example and discussions in depth are presented for future project execution in China deepwater development. 展开更多
关键词 project execution deepwater project tension leg platform floating system project management
在线阅读 下载PDF
Deepwater oil and gas field development in South China Sea 被引量:4
5
作者 Zhang Dagang Wybro Pieter Kang Yongtian 《Engineering Sciences》 EI 2013年第4期2-9,共8页
This paper focuses on potential development models of future oil and gas exploration in South China Sea. A detailed study of current development models worldwide is performed through some examples of industry installe... This paper focuses on potential development models of future oil and gas exploration in South China Sea. A detailed study of current development models worldwide is performed through some examples of industry installed/ongoing projects and major technical issues encountered during these practice. Key technologies are discussed for the success of field development. Some of the technologies and field development experience can be used for South China Sea project. Several models are studied in field development for different scenarios,including marginal field,large oil field and gas field. With the massive investment activities,continued improved technologies,and rapidly growing pool of professionals,the offshore industry in China will soon encounter a golden period. 展开更多
关键词 field development deepwater exploration development model deepwater technology combinedsystem
在线阅读 下载PDF
TLP hull structural design and analysis 被引量:3
6
作者 Yang Jiahui Ren Michael 《Engineering Sciences》 EI 2013年第4期35-40,共6页
Tension leg platform (TLP) has been one of the most favorite deep-water platform concepts for offshore oil and gas field exploration and development. As of now,a total of 24 TLPs have been installed worldwide with 3 m... Tension leg platform (TLP) has been one of the most favorite deep-water platform concepts for offshore oil and gas field exploration and development. As of now,a total of 24 TLPs have been installed worldwide with 3 more to be installed in the near future and 5 more under design. Most of these installations are in the Gulf of Mexico (GoM). Water depths for these TLP installations range from 150 m to 1 600 m. It is highly expected that China will have her first TLP designed,fabricated,and installed in the very near future. In order to satisfy the need for a unified hull structural design practice,this paper presents the design philosophy of a conventional TLP hull structure with emphases on critical structural components design and analysis methodologies. 展开更多
关键词 TLP hull structure critical component design practice
在线阅读 下载PDF
State of the art for dry tree semi technologies 被引量:2
7
作者 Yu Hao Chen Yongjun Cui Yujun 《Engineering Sciences》 EI 2013年第4期92-96,共5页
Dry tree semi is a fast developing technology and becomes more and more appealing to the operators as a solution for producing deepwater reserves. Utilizing a dry tree semi means spending less cost on well mainte-nanc... Dry tree semi is a fast developing technology and becomes more and more appealing to the operators as a solution for producing deepwater reserves. Utilizing a dry tree semi means spending less cost on well mainte-nance and interventions,while the production platform can be integrated and commissioned at quayside. This paper presents a comprehensive overview of various technologies for dry tree semi,such as E-semi,T-semi,paired-column semi and long stroke tensioners. Each dry tree semi concept is briefed in terms of global performance,top tension riser (TTR) tensioner system,quayside integration and feasibility to environment. 展开更多
关键词 dry tree semi heave plate TTR response amplitude operator (RAO) quayside integration
在线阅读 下载PDF
Polyester mooring stiffness modeling for deepwater floating system 被引量:2
8
作者 Chen Yongjun Qu Yan Zhang Tianyu 《Engineering Sciences》 EI 2013年第4期48-54,共7页
Polyester mooring has become increasing popular to serve as permanent station-keeping system for deepwater floating system during recent years. Comparing to the traditional steel wire mooring,polyester mooring provide... Polyester mooring has become increasing popular to serve as permanent station-keeping system for deepwater floating system during recent years. Comparing to the traditional steel wire mooring,polyester mooring provides significant benefits in deepwater,such as reduced installed capital expenditure (CAPEX) and smaller vertical loads on host platform. Polyester rope is a visco-elastic material,and its stiffness is nonlinear and affected by mean load,load range,loading period and loading history. There is a perception that the polyester stiffness model has significant impact on the floating system's performance. This paper presents a detailed description and comparison of two stiffness models and three analytic approaches,and provides a systematic study of the impact of polyester mooring stiffness modeling on the deepwater floating system performance. 展开更多
关键词 polyester mooring mooring stiffness DEEPWATER floating system
在线阅读 下载PDF
Capping stack:An industry in the making 被引量:2
9
作者 Jack Chen Li Xunke +1 位作者 Xie Wenhui Kang Yongtian 《Engineering Sciences》 EI 2013年第4期17-23,共7页
This paper gives an overview of recent development of the marine well containment system (MWCS) after BP Macondo subsea well blowout occurred on April 20,2010 in the Gulf of Mexico. Capping stack,a hard-ware utilized ... This paper gives an overview of recent development of the marine well containment system (MWCS) after BP Macondo subsea well blowout occurred on April 20,2010 in the Gulf of Mexico. Capping stack,a hard-ware utilized to contain blowout well at or near the wellhead is the center piece of MWCS. Accessibility to the dedicated capping stacks is gradually becoming a pre-requirement to obtain the permit for offshore drilling/workover, and the industry for manufacturing,maintenance,transportation and operation of the capping stack is in the making. 展开更多
关键词 marine well containment system capping stack offshore drilling/workover BLOWOUT
在线阅读 下载PDF
Application of a Newly Built Semi-submersible Vessel for Transportation of a Tension Leg Platform 被引量:1
10
作者 Dagang Zhang WeiyingSun Zhixia Fan 《Journal of Marine Science and Application》 2012年第3期341-350,共10页
Transportation of tension leg platform (TLP) structures for a long distance has always been associated with the use of a heavy semi-transport vessel. The requirements of this type of vessel are always special, and t... Transportation of tension leg platform (TLP) structures for a long distance has always been associated with the use of a heavy semi-transport vessel. The requirements of this type of vessel are always special, and their availability is limited. To prepare for the future development of South China Sea deepwater projects, the China Offshore Oil Engineering Corporation has recently built a heavy lift transport vessel-Hai Yang Shi You 278. This semi-submersible vessel has a displacement capacity of 50k DWT, and a breath of 42 meters. Understanding the vessel's applicability and preparing it for use in future deepwater projects are becoming imminent needs. This paper reviews the current critical issues associated with TLP transportation and performs detailed analysis of the designed TLP during load-out and transportation. The newly built COOEC transportation vessel HYSY 278 was applied to dry transport of the TLP structure from the COOEC fabrication yard in Qingdao to an oil field in South China Sea. The entire process included the load-out of the TLP structure from the landsite of the fabrication yard, the offloading and float-on of the platform from the vessel, the dry transport of the TLP over a long distance, and the final offloading of the platform. Both hydrodynamic and structure analysis were performed to evaluate the behavior of the transport vessel and TLP structure. Special attention was paid to critical areas associated with the use of this new vessel, along with any potential limitations. The results demonstrate that HYSY 278 can effectively be used for transporting the structure with proper arrangement and well-prepared operation. The procedure and details were presented on the basis of the study results. Special attention was also given to discussion on future use based on the results from the analysis. 展开更多
关键词 dry transport HYSY 278 tension leg platform (TLP) structure heavy semi-submersible transportvessel floating structure
在线阅读 下载PDF
Subsea rigid jumper design and VIV fatigue evaluation 被引量:2
11
作者 Wang Jun 《Engineering Sciences》 EI 2013年第4期67-71,共5页
The purpose of this paper is to present a design procedure for subsea rigid jumper system including strength and fatigue analysis. Special attention gives to a methodology based on DNV-RP-F105 to evaluate jumper fatig... The purpose of this paper is to present a design procedure for subsea rigid jumper system including strength and fatigue analysis. Special attention gives to a methodology based on DNV-RP-F105 to evaluate jumper fatigue damage caused by vortex induced vibration (VIV). Jumper strength analysis is to determine the jumper con-figuration which can accommodate various load conditions and all possible span lengths driven by installation tole-rances of connected subsea structures. Fatigue analysis includes two parts:thermal fatigue and VIV fatigue. This paper presents the procedure of VIV fatigue damage calculation. An example is given to illustrate above methodologies. 展开更多
关键词 subsea rigid jumper vortex induced vibration
在线阅读 下载PDF
An overview of marine & utility system for offshore platform 被引量:1
12
作者 Ho Jin Jeong David Norman Derrick Zhang 《Engineering Sciences》 EI 2013年第4期41-47,共7页
Main marine 8, utility (M & U) systems are essential to the routine operation of offshore units, and are extremely important as they are the system that will ensure the basic safety of offshore platforms. This pape... Main marine 8, utility (M & U) systems are essential to the routine operation of offshore units, and are extremely important as they are the system that will ensure the basic safety of offshore platforms. This paper gave a general explanation and guideline of the marine & utility systems in offshore projects including their interface with topside, M & U engineering, equipment sizing operation and control. 展开更多
关键词 marine utility systems offshore platform
在线阅读 下载PDF
Transportation of Floating Structures by Using Newly Built Heavy Lifting Semi Vessel HYSY278
13
作者 孙伟英 张大刚 樊之夏 《China Ocean Engineering》 SCIE EI CSCD 2013年第3期299-312,共14页
Transportation of floating structures for long distance has always been associated with the use of heavy semi transport vessel. The requirements of this type of vessel are always special, and its availability is limit... Transportation of floating structures for long distance has always been associated with the use of heavy semi transport vessel. The requirements of this type of vessel are always special, and its availability is limited. To prepare for the future development of the South China Sea deepwater projects, COOEC has recently built a heavy lift transport vessel - Hai Yang Shi You 278 (HYSY278). This semi-submersible vessel has displacement capacity of 50k DWT, and a breath of 42 m. Understanding the vessel's applicability and preparing its use for future deepwater projects are becoming imminent need. This paper reviews the critical issues associated with the floating structure transportation and performs detailed analysis of two designed floating structures during transportation. The newly built COOEC transportation vessel HYSY278 will be used to dry transport the floating structures from COOEC fabrication yard in Qingdao to the oil field in the South China Sea. The entire process will start with load-out/float-offthe floating structures from the construction sites, offload the platform from the vessel if needed, dry transport floating structures through a long distance, and finally offload the platform. Both hydrodynamic and struc^tral analyses are performed to evaluate transport vessel and floating structures. Critical issues associated with the transportation and offloading of platform from the vessel will be studied in detail. Detailed study is performed to evaluate the response of the system during this phase and additional work needed to make the vessel feasible for use of this purpose. The results demonstrate that with proper modifications, HYSY278 can effectively be used for transporting structures with proper arrangement and well-prepared operation. The procedure and details are presented on the basis of study results. Special attentions associated with future use will also be discussed based on the results from analysis. 展开更多
关键词 dry transport HYSY2 78 floating structure heavy semi-submersible transport vessel TLP Spar productionsemi-submersible
在线阅读 下载PDF
Response-based Analysis for Tension Leg Platform
14
作者 Yongjun Chen Dagang Zhang 《Journal of Marine Science and Application》 CSCD 2017年第1期87-92,共6页
The typical industry practice for Tension Leg Platform (TLP) design focuses on a conventional short-term design recipe, which assumes that an N-year design environment leads to an N-year response. In the response-ba... The typical industry practice for Tension Leg Platform (TLP) design focuses on a conventional short-term design recipe, which assumes that an N-year design environment leads to an N-year response. In the response-based design method, the TLP is designed to withstand N-year responses rather than respond to N-year environmental conditions. In this paper, we present an overview and a general procedure for the response-based design method and use a case study to compare the critical TLP responses between the two methods. The results of our comparison show that the conventional short-term design method often contains an element of conservatism and that the response-based design method can reduce the design conditions and thereby achieve cost savings. 展开更多
关键词 response-based design long-term response short-term response DEEPWATER floating platform tension leg platform
在线阅读 下载PDF
Overview of flowline bundle technology from concept selection to offshore installation
15
作者 Song Ruxin Xia Qiuling 《Engineering Sciences》 EI 2013年第4期10-16,共7页
Flowline bundle system consisting of carrier pipe,sleeve pipe and internal flowlines offers innovative solution for the infield transportation of oil and gas. Due to its features,flowline bundle offers a couple of adv... Flowline bundle system consisting of carrier pipe,sleeve pipe and internal flowlines offers innovative solution for the infield transportation of oil and gas. Due to its features,flowline bundle offers a couple of advantages over conventional flowline in particular for cases where multi-flowlines and high thermal performance is of great interest. The main benefits and advantages of such system include excellent thermal performance to prevent wax formation and hydrates,multiple bundled flowlines,mechanical and corrosion protection,potential reuse, etc. With the developments of offshore oil and gas industries,more and more hydrocarbon resources are being explored and discovered from shallow to deep water. Pipeline bundle system can be a smart solution for certain applications,which can be safe and cost effective solution. The objective of this paper is to overview pipeline bundle technology,outline detailed engineering design issue and procedure. Focus is given to its potential application in offshore for infield transportation. Engineering design principles and procedures for pipeline bundle system are highlighted. Construction methods of flowline bundle onshore are reviewed. Offshore towing and installation of pipeline bundle procedure is outlined. 展开更多
关键词 OFFSHORE pipelines flowlines BUNDLES DEEPWATER design INSTALLATION
在线阅读 下载PDF
In-place structural strength and fatigue analysis for floating platform topsides
16
作者 Chen Lizhong 《Engineering Sciences》 EI 2013年第4期24-34,共11页
This paper presents some insights on the state-of-the-art practice that has been utilized recently in the inplace structural strength and fatigue analysis for topsides on deepwater floating platforms such as tension l... This paper presents some insights on the state-of-the-art practice that has been utilized recently in the inplace structural strength and fatigue analysis for topsides on deepwater floating platforms such as tension leg plat-form (TLP) and semi-submersibles. Emphases are put on analysis software,geometric and mass modeling,hydro-dynamic loading and its mapping,and analysis procedures. In addition,for the in-place analysis using structure analysis computer system (SACS),the procedure of Visual Basic for Application (VBA) is developed to map AQWA-LINE hydrodynamic loading to the SACS integrated hull/topsides model;for the in-place analysis using structure engineering system analysis model (SESAM),many computer aided applications are made to aid the post-processing. These applications have been used in structural analyses for a few TLP and semi-submersible plat-form topsides,and are briefly introduced in this paper. 展开更多
关键词 topsides TLP SEMI-SUBMERSIBLE in-place structural analysis hydrodynamic loading SACS SESAM
在线阅读 下载PDF
Subsea flexible flowline installation issues and solutions
17
作者 Kevin Huang 《Engineering Sciences》 EI 2013年第4期86-91,共6页
Flexible flowlines and risers have been increasingly used for deepwater and ultra-deepwater field applications,partially because of its low submerged weight and better dynamic characteristics comparing to rigid pipeli... Flexible flowlines and risers have been increasingly used for deepwater and ultra-deepwater field applications,partially because of its low submerged weight and better dynamic characteristics comparing to rigid pipelines. The offshore installation of flowline may have advantages as well. However,it has special needs for the in-stallation aids,and it is challenging to install tie-in structures due to its low bending stiffness. This paper is to present some of the challenges during a recent flexible installation project with a total of more than 100 km flexible flowlines,and 24 in-line sleds/pipeline end termination(PLET) in water depth up to 1 300 m. 展开更多
关键词 FLEXIBLE INSTALLATION normal lay in-line sled PLET
在线阅读 下载PDF
Production TTR modeling and dynamic buckling analysis
18
作者 Hugh Liu John Wei Edward Huang 《Engineering Sciences》 EI 2013年第4期61-66,共6页
In a typical tension leg platform (TLP) design,the top tension factor (TTF),measuring the top tension of a top tensioned riser (TTR) relative to its submerged weight in water,is one of the most important design parame... In a typical tension leg platform (TLP) design,the top tension factor (TTF),measuring the top tension of a top tensioned riser (TTR) relative to its submerged weight in water,is one of the most important design parameters that has to be specified properly. While a very small TTF may lead to excessive vortex induced vibration (VIV),clashing issues and possible compression close to seafloor,an unnecessarily high TTF may translate into excessive riser cost and vessel payload,and even has impacts on the TLP sizing and design in general. In the process of a production TTR design,it is found that its outer casing can be subjected to compression in a worst-case scenario with some extreme metocean and hardware conditions. The present paper shows how finite element analysis (FEA) models using beam elements and two different software packages (Flexcom and ABAQUS) are constructed to simulate the TTR properly,and especially the pipe-in-pipe effects. An ABAQUS model with hybrid elements (beam elements globally + shell elements locally) can be used to investigate how the outer casing behaves under compression. It is shown for the specified TTR design,even with its outer casing being under some local compression in the worst-case scenario,dynamic buckling would not occur;therefore the TTR design is adequate. 展开更多
关键词 TLP TTR FEA pipe-in-pipe buckling analysis
在线阅读 下载PDF
Seismic response of a typical fixed platform foundation under earthquake loading
19
作者 Zhu Feng Wang Jun 《Engineering Sciences》 EI 2013年第4期72-78,共7页
Offshore platforms in seismically active areas should be designed to service severe earthquake excitations with no global structural failure. This paper summarizes the dynamic analysis of a typical fixed platform unde... Offshore platforms in seismically active areas should be designed to service severe earthquake excitations with no global structural failure. This paper summarizes the dynamic analysis of a typical fixed platform under the earthquake loading in the seismically active area. The dynamic analysis includes interpretation of dynamic design parameters based on the available site-specific data,together with foundation design recommendations for earthquake loading conditions,which include free-field site response analyses,liquefaction analyses and soil-pile interaction analyses. 展开更多
关键词 fixed platform earthquake loading soil-pile interaction
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部