For the Guanshui Road Station tunnel project of Guiyang Metro Line 2,the wind pavilion group was moved out of the main tunnel to reduce the number of openings in the main tunnel,and the wind pavilion group was excavat...For the Guanshui Road Station tunnel project of Guiyang Metro Line 2,the wind pavilion group was moved out of the main tunnel to reduce the number of openings in the main tunnel,and the wind pavilion group was excavated in a triangular configuration at the entrance of the main tunnel.Based on the finite element software ABAQUS,a three-dimensional model is established to study the influence of different triangular-distribution tunnels excavation schemes on the surface settlement and tunnel stability.The objective of this study is to reveal the change rules of surface settlement,deformation and force in the support structures and the surrounding rock and identify the best excavation scheme for this tunnel configuration.Results show that to control the surface settlement and the deformation of the support structures,the optimal excavation sequence involves excavating the upper fresh air exhaust tunnel before the lower running tunnel.To control the stress of the support structures,the optimal excavation involves excavating the lower running tunnel before the upper fresh air exhaust tunnel.In this project,the most reasonable excavation sequence of the tunnel is from top to bottom.The most reasonable thickness of tunnel penetration is 5 m.展开更多
Centralized delivery has become the main operation mode under the scaled development of wind power.Transmission channels are usually the guarantee of out-delivered wind power for large-scale wind base.The configuratio...Centralized delivery has become the main operation mode under the scaled development of wind power.Transmission channels are usually the guarantee of out-delivered wind power for large-scale wind base.The configuration of transmission capacity,which has the features of low utilization and poor economy,is hardly matching correctly due to the volatility and low energy density of wind.The usage of energy storage can mitigate wind power fluctuations and reduce the requirement of out-delivery transmission capacity,but facing the issue of energy storage cost recovery.Therefore,it is necessary to optimize the allocation of energy storage while considering the problem of wind power transmission.This paper studies the joint optimization of large-scale wind power transmission capacity and energy storage,reveals the mechanism of energy storage in order to reduce the power fluctuation of wind power base and slow down the demand of transmission.Then,analyze the multi-functional cost-sharing mode of energy storage,improve the efficiency of energy storage cost recovery.Constructs the coordination optimization configuration model to deal with the problem of large-scale wind power transmission capacity and energy storage,and realizes the transmission capacity optimization coordination and optimization with energy storage.The proposed method is verified by a wind base located in Northeast China.展开更多
基金Projects(B200204032,2019B07914)supported by the Fundamental Research Funds for the Central Universities,ChinaProjects(51878667,51678571,51808193)supported by the National Natural Science Foundation of China。
文摘For the Guanshui Road Station tunnel project of Guiyang Metro Line 2,the wind pavilion group was moved out of the main tunnel to reduce the number of openings in the main tunnel,and the wind pavilion group was excavated in a triangular configuration at the entrance of the main tunnel.Based on the finite element software ABAQUS,a three-dimensional model is established to study the influence of different triangular-distribution tunnels excavation schemes on the surface settlement and tunnel stability.The objective of this study is to reveal the change rules of surface settlement,deformation and force in the support structures and the surrounding rock and identify the best excavation scheme for this tunnel configuration.Results show that to control the surface settlement and the deformation of the support structures,the optimal excavation sequence involves excavating the upper fresh air exhaust tunnel before the lower running tunnel.To control the stress of the support structures,the optimal excavation involves excavating the lower running tunnel before the upper fresh air exhaust tunnel.In this project,the most reasonable excavation sequence of the tunnel is from top to bottom.The most reasonable thickness of tunnel penetration is 5 m.
基金supported by the National Key Research and Development Program(2016YFB0900100)。
文摘Centralized delivery has become the main operation mode under the scaled development of wind power.Transmission channels are usually the guarantee of out-delivered wind power for large-scale wind base.The configuration of transmission capacity,which has the features of low utilization and poor economy,is hardly matching correctly due to the volatility and low energy density of wind.The usage of energy storage can mitigate wind power fluctuations and reduce the requirement of out-delivery transmission capacity,but facing the issue of energy storage cost recovery.Therefore,it is necessary to optimize the allocation of energy storage while considering the problem of wind power transmission.This paper studies the joint optimization of large-scale wind power transmission capacity and energy storage,reveals the mechanism of energy storage in order to reduce the power fluctuation of wind power base and slow down the demand of transmission.Then,analyze the multi-functional cost-sharing mode of energy storage,improve the efficiency of energy storage cost recovery.Constructs the coordination optimization configuration model to deal with the problem of large-scale wind power transmission capacity and energy storage,and realizes the transmission capacity optimization coordination and optimization with energy storage.The proposed method is verified by a wind base located in Northeast China.