This study documents pioneering results in marginal wells in Texas,where the application of RDV-00■restored production through delayed protonic activation catalyzed by reservoir energy.The product,based on RDV■(Vaso...This study documents pioneering results in marginal wells in Texas,where the application of RDV-00■restored production through delayed protonic activation catalyzed by reservoir energy.The product,based on RDV■(Vasoactive Dynamic Reactor)technology,operates via:Controlled protonation of molecular structures;Release of energetic carbocations;Autonomous transformation without external inputs.(a)Case 1(Well#E2-Starr County):Certified as“dry”by RRC(2022)after 48 months at 0 BPD;8 months post-injection of 5 gal RDV-00■(Fluid column:37 bbl;Wellhead pressure:80 psi(vs.0 psi initially)).(b)Case 2(Well#P1-Luling Field):Historical stripper well(0.25-0.5 BPD);23 months of immobilization with 15 gal RDV-00■;Critical results:(1)Initial production:42 BPD(8,400%above baseline);(2)Shut-in wellhead pressure:40 psi(neighboring wells=0-3 psi);(3)Current behavior:Continuous recharge from reservoir(well shut-in due to lack of storage).(c)Technically Significant Observations:(1)First case of self-sustaining reactivation in depleted wells;(2)Mechanism validated by Autonomous pressure generation(0→40-80 psi),and Continuous flow without additional stimulation;(3)No documented precedents in SPE/OnePetro literature to our knowledge.展开更多
文摘This study documents pioneering results in marginal wells in Texas,where the application of RDV-00■restored production through delayed protonic activation catalyzed by reservoir energy.The product,based on RDV■(Vasoactive Dynamic Reactor)technology,operates via:Controlled protonation of molecular structures;Release of energetic carbocations;Autonomous transformation without external inputs.(a)Case 1(Well#E2-Starr County):Certified as“dry”by RRC(2022)after 48 months at 0 BPD;8 months post-injection of 5 gal RDV-00■(Fluid column:37 bbl;Wellhead pressure:80 psi(vs.0 psi initially)).(b)Case 2(Well#P1-Luling Field):Historical stripper well(0.25-0.5 BPD);23 months of immobilization with 15 gal RDV-00■;Critical results:(1)Initial production:42 BPD(8,400%above baseline);(2)Shut-in wellhead pressure:40 psi(neighboring wells=0-3 psi);(3)Current behavior:Continuous recharge from reservoir(well shut-in due to lack of storage).(c)Technically Significant Observations:(1)First case of self-sustaining reactivation in depleted wells;(2)Mechanism validated by Autonomous pressure generation(0→40-80 psi),and Continuous flow without additional stimulation;(3)No documented precedents in SPE/OnePetro literature to our knowledge.