Based on experimental study result of two simply supported beams,which were prestressed by vertical tendons,the research on the weakening effect of vertical prestress ducts on web sections of prestressed concrete box ...Based on experimental study result of two simply supported beams,which were prestressed by vertical tendons,the research on the weakening effect of vertical prestress ducts on web sections of prestressed concrete box girder was carried out. The test result shows that in the condition without grouting into the ducts,the cracking load is evidently lower than that with full grouting,and stirrup stress and principal tension stress at the surface of concrete will increase obviously. Meanwhile,the finite element analysis has been done to the test beams. The research is consistent with the analysis of finite element. The research tells that strengthening the detection and management for the vertical prestress grouting quality have an important meaning to prevent cracking of the prestressed concrete box girder bridge and provide one theoretical and testing basis for analyzing the cracking reason of such bridges.展开更多
This study investigated the sidewall rockburst characteristics of highly stressed circular tunnel subjected to impact loads resulting from rock blasting or other mining-related dynamic disturbances,aiming at exploring...This study investigated the sidewall rockburst characteristics of highly stressed circular tunnel subjected to impact loads resulting from rock blasting or other mining-related dynamic disturbances,aiming at exploring the influence of vertical prestress and dynamic load on sidewall rockburst.Using a biaxial Hopkinson pressure bar(BHPB)system,we studied the sidewall rockburst of a circular tunnel by applying various prestresses(horizontal and vertical static stresses)to a sand prefabricated circular hole specimen,followed by impact loads.The real-time process and strain field of the sidewall rockburst around the specimen were tracked by the high-speed camera and digital image correlation(DIC).The tests reveal that the sidewall rockburst process can be summarized as:calm stage,slab buckling and spalling stage,rock slabs ejection stage,and V-shaped notch formation stage.Furthermore,the sidewall rockbursts exhibit typical dynamic tensile failure.The mechanism of sidewall rockburst under the coupled static-impact loads was summarized,i.e.the static prestress determines the initial stress and strain distribution,and the vertical prestress influences the affected range and strain values of the strain concentration zone;the impact load disrupts the original static stress equilibrium,inducing alterations in the stress and strain of the surrounding rock and triggering sidewall rockburst.展开更多
文摘Based on experimental study result of two simply supported beams,which were prestressed by vertical tendons,the research on the weakening effect of vertical prestress ducts on web sections of prestressed concrete box girder was carried out. The test result shows that in the condition without grouting into the ducts,the cracking load is evidently lower than that with full grouting,and stirrup stress and principal tension stress at the surface of concrete will increase obviously. Meanwhile,the finite element analysis has been done to the test beams. The research is consistent with the analysis of finite element. The research tells that strengthening the detection and management for the vertical prestress grouting quality have an important meaning to prevent cracking of the prestressed concrete box girder bridge and provide one theoretical and testing basis for analyzing the cracking reason of such bridges.
基金supported by the National Natural Science Foundation of China(Grant No.42077244).
文摘This study investigated the sidewall rockburst characteristics of highly stressed circular tunnel subjected to impact loads resulting from rock blasting or other mining-related dynamic disturbances,aiming at exploring the influence of vertical prestress and dynamic load on sidewall rockburst.Using a biaxial Hopkinson pressure bar(BHPB)system,we studied the sidewall rockburst of a circular tunnel by applying various prestresses(horizontal and vertical static stresses)to a sand prefabricated circular hole specimen,followed by impact loads.The real-time process and strain field of the sidewall rockburst around the specimen were tracked by the high-speed camera and digital image correlation(DIC).The tests reveal that the sidewall rockburst process can be summarized as:calm stage,slab buckling and spalling stage,rock slabs ejection stage,and V-shaped notch formation stage.Furthermore,the sidewall rockbursts exhibit typical dynamic tensile failure.The mechanism of sidewall rockburst under the coupled static-impact loads was summarized,i.e.the static prestress determines the initial stress and strain distribution,and the vertical prestress influences the affected range and strain values of the strain concentration zone;the impact load disrupts the original static stress equilibrium,inducing alterations in the stress and strain of the surrounding rock and triggering sidewall rockburst.