期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Prediction of central bursting defects in rod extrusion process with upper bound analysis method 被引量:2
1
作者 Amir PARGHAZEH Heshmatollah HAGHIGHAT 《Transactions of Nonferrous Metals Society of China》 SCIE EI CAS CSCD 2016年第11期2892-2899,共8页
The prediction of central bursting defects in the rod extrusion process through conical dies using the upper bound analysisis investigated. A kinematically admissible velocity field, including the radial and angular v... The prediction of central bursting defects in the rod extrusion process through conical dies using the upper bound analysisis investigated. A kinematically admissible velocity field, including the radial and angular velocity components, is proposed. A newcriterion is presented to predict the occurrence of the central bursting defects. Parameter bobt, which represents the risk probability ofcracking, is proposed. It is calculated using the shape of the boundary at the entrance by minimizing the total power dissipationduring the extrusion process. When bobt is equal to or greater than bcr, central bursting occurs. Furthermore, the quantitativerelationships between central bursting defects and process parameters (semi die angle, reduction in area and frictional factor) arestudied. The results show that the central bursting defects are affected primarily by the reduction in area and the friction factor. Thepresented criterion is verified by comparing with the FEM simulation data and the results of the published paper. 展开更多
关键词 central bursting defect upper bound analysis method rod extrusion process
在线阅读 下载PDF
Design method of high prestressed support for shallow-buried large-span caverns
2
作者 JIANG Bei WEI Hua-yong +3 位作者 WANG Qi WANG Ming-zi YIN Chen ZHANG Yan-bo 《Journal of Central South University》 2025年第3期1099-1116,共18页
The surrounding rock is prone to large-scale loosening and failure after the excavation of shallow large-span caverns because of the thin overlying strata and large cross-section span.The rational design of bolt suppo... The surrounding rock is prone to large-scale loosening and failure after the excavation of shallow large-span caverns because of the thin overlying strata and large cross-section span.The rational design of bolt support is very important to the safety control of surrounding rock as a common support means.The control mechanism and design method of bolt support for shallow-buried large-span caverns is carried out.The calculation method of bolt prestress and length based on arched failure and collapsed failure mode is established.The influence mechanism of different influencing factors on the bolt prestress and length is clarified.At the same time,the constant resistance energy-absorbing bolt with high strength and high toughness is developed,and the comparative test of mechanical properties is carried out.On this basis,the design method of high prestressed bolt support for shallow-buried large-span caverns is put forward,and the field test is carried out in Qingdao metro station in China.The monitoring results show that the maximum roof settlement is 6.8 mm after the new design method is adopted,and the effective control of the shallow-buried large-span caverns is realized.The research results can provide theoretical and technical support for the safety control of shallow-buried large-span caverns. 展开更多
关键词 Hoek-Brown strength criterion shallow-buried large-span caverns limit analysis upper bound method high prestress bolt support design method
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部