In the present study,a comparison between the new shallow tunneling method(STM)and the traditional pile and rib method(PRM)was conducted to excavate and construct subway stations in the geological conditions of Tehran...In the present study,a comparison between the new shallow tunneling method(STM)and the traditional pile and rib method(PRM)was conducted to excavate and construct subway stations in the geological conditions of Tehran.First,by selecting Station Z6 located in the Tehran Subway Line 6 as a case study,the construction process was analyzed by PRM.The maximum ground settlement of 29.84 mm obtained from this method was related to the station axis,and it was within the allowable settlement limit of 30 mm.The acceptable agreement between the results of numerical modeling and instrumentation data indicated the confirmation and accuracy of the excavation and construction process of Station Z6 by PRM.In the next stage,based on the numerical model validated by instrumentation data,the value of the ground surface settlement was investigated during the station excavation and construction by STM.The results obtained from STM showed a significant reduction in the ground surface settlement compared to PRM.The maximum settlement obtained from STM was 6.09 mm as related to the front of the excavation face.Also,the sensitivity analysis results denoted that in addition to controlling the surface settlement by STM,it is possible to optimize some critical geometric parameters of the support system during the station excavation and construction.展开更多
Hawking radiation of black ring solutions to 5-dimensional Einstein-Maxwell-dilaton theory is analyzed by use of the Parikh-Wilczek tunneling method. To get the correct tunneling amplitude and emission rate, we adopt ...Hawking radiation of black ring solutions to 5-dimensional Einstein-Maxwell-dilaton theory is analyzed by use of the Parikh-Wilczek tunneling method. To get the correct tunneling amplitude and emission rate, we adopt and develop the Angheben-Nadalini-Vanzo Zerbini covariant approach to cover the effects of rotation and electronic discharge all at once, and the effect of back reaction is also taken into account. This constitutes a unified approach to the tunneling problem. Provided the first law of thermodynamics for black rings holds, the emission rate is proportional to the exponential of the change of Bekenstein-Hawking entropy. Explicit calculation for black ring temperatures agrees exactly with the results obtained via the classical surface gravity method and the quasi-local formalism.展开更多
The original formula to calculate the tunneling rate through event horizons is apparently dependent on the type of coordinates used. In this paper, we propose an invariant expression under canonical transformations to...The original formula to calculate the tunneling rate through event horizons is apparently dependent on the type of coordinates used. In this paper, we propose an invariant expression under canonical transformations to study the tunneling effect. Moreover, the problem of factor 2 is solved naturally. As an application of this expression, we obtain the same tunneling rate both in the Schwarzschild and the Painlev6 coordinates. It is shown that once the suitable formula to calculate tunneling rate is correctly identified, the tunneling method is manifestly covariant.展开更多
Since the development of the new Austrian tunnelling method(NATM)in the 1960s,this technique has been applied successfully in many tunnels.However,opinions of NATM principles emerged till 2000,i.e.NATM is not a tunnel...Since the development of the new Austrian tunnelling method(NATM)in the 1960s,this technique has been applied successfully in many tunnels.However,opinions of NATM principles emerged till 2000,i.e.NATM is not a tunnelling method,but an approach covering all general principles of tunnelling.To investigate the general principles of the NATM,this study focused on tunnelling practises in the Bolu tunnel,and evaluated the conditions under which the NATM practises could be effective.The Bolu tunnel project was designed following the NATM principles.It is evident that practises adopted in this tunnel are important with respect to the NATM.In addition,it shows that the solutions to the problems encountered in this tunnel are consistent with the NATM principles.Finally,the study determines the ground types of the NATM principles and proposes associated updates.展开更多
In this paper,the wind load on an arc-shaped canopy roof was studied with numerical wind tunnel method(NWTM) .Three-dimensional models were set up for the canopy roof with opened or closed skylights.The air flow aroun...In this paper,the wind load on an arc-shaped canopy roof was studied with numerical wind tunnel method(NWTM) .Three-dimensional models were set up for the canopy roof with opened or closed skylights.The air flow around the roof under wind action from three directions was analysed respectively.Wind pressure coefficients on the canopy roof were determined by NWTM.The results of NWTM agreed well with those of wind tunnel test for the roof with opened skylights,which verified the applicability and rationality of NWTM.The effect of the closure of skylights was then investigated with NWTM.It was concluded that the closure of the skylights may increase the wind suction on the top surface of the roof greatly and should be considered in the structure design of the canopy roof.展开更多
Mass movements are very common problems in the eastern Black Sea region of Turkey due to its climate conditions, geological, and geomorphological characteristics. High slope angle, weathering, dense rainfalls, and ant...Mass movements are very common problems in the eastern Black Sea region of Turkey due to its climate conditions, geological, and geomorphological characteristics. High slope angle, weathering, dense rainfalls, and anthropogenic impacts are generally reported as the most important triggering factors in the region. Following the portal slope excavations in the entrance section of Cankurtaran tunnel, located in the region, where the highly weathered andesitic tuff crops out, a circular toe failure occurred. The main target of the present study is to investigate the causes and occurrence mechanism of this failure and to determine the feasible remedial measures against it using finite element method(FEM) in four stages. These stages are slope stability analyses for pre-and postexcavation cases, and remediation design assessments for slope and tunnel. The results of the FEM-SSR analyses indicated that the insufficient initial support design and weathering of the andesitic tuffs are the main factors that caused the portal failure. After installing a rock retaining wall with jet grout columns and reinforced slope benching applications, the factor of safety increased from 0.83 to 2.80. In addition toslope stability evaluation, the Rock Mass Rating(RMR), Rock Mass Quality(Q) and New Austrian Tunneling Method(NATM) systems were also utilized as empirical methods to characterize the tunnel ground and to determine the tunnel support design. The performance of the suggested empirical support design, induced stress distributions and deformations were analyzed by means of numerical modelling. Finally, it was concluded that the recommended stabilization technique was essential for the dynamic long-term stability and prevents the effects of failure. Additionally, the FEM method gives useful and reasonably reliable results in evaluating the stability of cut slopes and tunnels excavated both in continuous and discontinuous rock masses.展开更多
Estimation of tunnel diameter convergence is a very important issue for tunneling construction,especially when the new Austrian tunneling method(NATM) is adopted.For this purpose,a systematic convergence measurement...Estimation of tunnel diameter convergence is a very important issue for tunneling construction,especially when the new Austrian tunneling method(NATM) is adopted.For this purpose,a systematic convergence measurement is usually implemented to adjust the design during the whole construction,and consequently deadly hazards can be prevented.In this study,a new fuzzy model capable of predicting the diameter convergences of a high-speed railway tunnel was developed on the basis of adaptive neuro-fuzzy inference system(ANFIS) approach.The proposed model used more than 1 000 datasets collected from two different tunnels,i.e.Daguan tunnel No.2 and Yaojia tunnel No.1,which are part of a tunnel located in Hunan Province,China.Six Takagi-Sugeno fuzzy inference systems were constructed by using subtractive clustering method.The data obtained from Daguan tunnel No.2 were used for model training,while the data from Yaojia tunnel No.1 were employed to evaluate the performance of the model.The input parameters include surrounding rock masses(SRM) rating index,ground engineering conditions(GEC) rating index,tunnel overburden(H),rock density(?),distance between monitoring station and working face(D),and elapsed time(T).The model’s performance was assessed by the variance account for(VAF),root mean square error(RMSE),mean absolute percentage error(MAPE) as well as the coefficient of determination(R2) between measured and predicted data as recommended by many researchers.The results showed excellent prediction accuracy and it was suggested that the proposed model can be used to estimate the tunnel convergence and convergence velocity.展开更多
This paper presents the application of a hybrid finite-discrete element method to study blast-induceddamage in circular tunnels. An extensive database of field tests of underground explosions above tunnelsis used for ...This paper presents the application of a hybrid finite-discrete element method to study blast-induceddamage in circular tunnels. An extensive database of field tests of underground explosions above tunnelsis used for calibrating and validating the proposed numerical method; the numerical results areshown to be in good agreement with published data for large-scale physical experiments. The method isthen used to investigate the influence of rock strength properties on tunnel durability to withstand blastloads. The presented analysis considers blast damage in tunnels excavated through relatively weak(sandstone) and strong (granite) rock materials. It was found that higher rock strength will increase thetunnel resistance to the load on one hand, but decrease attenuation on the other hand. Thus, undercertain conditions, results for weak and strong rock masses are similar. 2014 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting byElsevier B.V. All rights reserved.展开更多
Numerous deep underground projects have been designed and constructed in China, which are beyond the current specifications in terms of scale and construction difficulty. The severe failure problems induced by high in...Numerous deep underground projects have been designed and constructed in China, which are beyond the current specifications in terms of scale and construction difficulty. The severe failure problems induced by high in situ stress, such as rockburst, spalling, damage of deep surrounding rocks, and timedependent damage, were observed during construction of these projects. To address these problems, the dynamic design method for deep hard rock tunnels is proposed based on the disintegration process of surrounding rocks using associated dynamic control theories and technologies. Seven steps are basically employed:(i) determination of design objective,(ii) characteristics of site, rock mass and project, and identification of constraint conditions,(iii) selection or development of global design strategy,(iv)determination of modeling method and software,(v) preliminary design,(vi) comprehensive integrated method and dynamic feedback analysis, and(vii) final design. This dynamic method was applied to the construction of the headrace tunnels at Jinping II hydropower station. The key technical issues encountered during the construction of deep hard rock tunnels, such as in situ stress distribution along the tunnels, mechanical properties and constitutive model of deep hard rocks, determination of mechanical parameters of surrounding rocks, stability evaluation of surrounding rocks, and optimization design of rock support and lining, have been adequately addressed. The proposed method and its application can provide guidance for deep underground projects characterized with similar geological conditions.展开更多
This paper focuses on the analytical derivation and the numerical simulation analyses to predict the interaction influences between a landslide and a new tunnel in mountain areas. Based on the slip-line theory, the di...This paper focuses on the analytical derivation and the numerical simulation analyses to predict the interaction influences between a landslide and a new tunnel in mountain areas. Based on the slip-line theory, the disturbance range induced by tunneling and the minimum safe distance between the tunnel vault and the sliding belt are obtained in consideration of the mechanical analyses of relaxed rocks over the tunnel opening. The influence factors for the minimum safe crossing distance are conducted,including the tunnel radius, the friction angle of surrounding rocks, the inclination angle of sliding belt,and the friction coefficient of surrounding rocks. Secondly, taking account of the compressive zone and relaxed rocks caused by tunneling, the Sarma method is employed to calculate the safety factor of landslide. Finally, the analytical solutions for interaction between the tunnel and the landslide are compared with a series of numerical simulations, considering the cases for different perpendicular distances between the tunnel vault and the sliding belt. Resultsshow that the distance between the tunnel vault and the slip zone has significant influence on the rock stress and strain. For the case of the minimum crossing distance, a plastic zone in the landslide traversed by tunneling would be formed with rather large range, which seriously threatens the stability of landslide. This work demonstrates that the minimum safe crossing distance obtained from numerical simulation is in a good agreement with that calculated by the proposed analytical solutions.展开更多
The paper first analyzes the failure mechanism and mode of tunnel according to model experiments and mechanical calculation and then discusses the deficiency of taking the limit value of displacement around the tunnel...The paper first analyzes the failure mechanism and mode of tunnel according to model experiments and mechanical calculation and then discusses the deficiency of taking the limit value of displacement around the tunnel and the size of the plastic zone of surrounding rock as the criterion of stability. So the writers put forward the idea that the safety factor of surrounding rock calculated through strength reduction FEM(finit element method) should be regarded as the criterion of stability,which has strict mechanical basis and unified standard and would not be influenced by other factors. The paper also studies the safety factors of tunnel surrounding rock (safety factors of shear and tension failure) and lining and some methods of designing and calculating tunnels. At last,the writers take the loess tunnel for instance and show the design and calculation results of two-lane railway tunnel.展开更多
In this paper, stress behavior of shallow tunnels under simultaneous non-uniform surface traction and symmetric gravity loading was studied using a direct boundary element method(BEM). The existing fullplane elastos...In this paper, stress behavior of shallow tunnels under simultaneous non-uniform surface traction and symmetric gravity loading was studied using a direct boundary element method(BEM). The existing fullplane elastostatic fundamental solutions to displacement and stress fields were used and implemented in a developed algorithm. The cross-section of the tunnel was considered in circular, square, and horseshoe shapes and the lateral coefficient of the domain was assumed as unit quantity. Double-node procedure of the BEM was applied at the corners to improve the model including sudden traction changes. The results showed that the method used was a powerful tool for modeling underground openings under various external as well as internal loads. Eccentric loads significantly influenced the stress pattern of the surrounding tunnel. The achievements can be practically used in completing and modifying regulations for stability investigation of shallow tunnels.展开更多
Photo-corrosion is one of the major obstacles for CdS application in wet chemical fields, and atomic layer deposition (ALD) has been proposed as an effective way to suppress the corrosion. Here, prior to ALD coating...Photo-corrosion is one of the major obstacles for CdS application in wet chemical fields, and atomic layer deposition (ALD) has been proposed as an effective way to suppress the corrosion. Here, prior to ALD coating, CdS, one facilely corrosive photocatalyst, was synthesized via hydrothermal synthesis to access the fundamental corrosion mechanism and the according corrosive sites. X-ray photoelectron spectros- copy (XPS) and X-ray diffraction (XRD) demonstrated that the failure of catalytic decomposition of methylene blue originated from the formation of soluble CdSO4 by oxidizing S2 of as-prepared CdS. High resolu- tion transmission electron microscopy (HRTEM) further identified the active sites in the V-shaped regions ofCdS nanoparticles, confirmed by the simulated electric field distribution. To rationally coat oxides on CdS, the right candidates and their thicknesses have been considered by our tunneling model with trans- fer matrix method based on quantum mechanism, upon which the thickness of protective layer should be less than 0.5 nm to maintain a high tunneling probability, and thus one cycle of ALD TiO2 or AbO3 was proposed to passivate the CdS powder to balance the carrier transportation and corrosion suppres- sion. Based on HRTEM results, we found that the active V-shaped region was covered by ALD oxides (TiO2 or AbO3). For each case, no soluble CdSO4 has been found before and after photocatalytic reactions based XPS measurements. Importantly, we noticed that with the passivation of one cycle of ALD, the catalyst's lifetime was elongated up to 〉14 times higher than that of the as-prepared CdS.展开更多
The shallow tunnelling method(STM)often uses temporary supports to divide large section tunnels into several closed or semiclosed sections so as to share the upper load.The complex support system composed of primary a...The shallow tunnelling method(STM)often uses temporary supports to divide large section tunnels into several closed or semiclosed sections so as to share the upper load.The complex support system composed of primary and temporary supports can ensure safety during tunnel construction.Based on the large section tunnel of Beijing Subway Line 12,the mechanical characteristics of support system by the double-side-drift method(DSDM)during excavation and demolition were analyzed through numerical simulation and monitoring.The study showed that the middle cave excavation was the most critical stage of the DSDM,during which the load on the supporting structure increased significantly.The temporary vertical support bore most of the new load during middle cave excavation.During the demolition stage,the load was redistributed,which caused arch settlement and section convergence.The removal of the temporary vertical support exerted the greatest impact in this process.The lateral temporary inverted arch changed from axial compression to axial tension after the middle and lower caves were excavated.Based on the mechanical characteristics of the support system,some engineering suggestions were proposed for large section tunnel construction.These research results can provide reference for the design and construction of similar large section tunnels.展开更多
Since novel optoelectronic devices based on the peculiar behaviors of the tunneling probability, e.g., resonant tunneling devices (RTD) and band-pass filter, are steadily proposed, the analytic transfer matrix (ATM) m...Since novel optoelectronic devices based on the peculiar behaviors of the tunneling probability, e.g., resonant tunneling devices (RTD) and band-pass filter, are steadily proposed, the analytic transfer matrix (ATM) method is extended to study these devices. For several examples, we explore the effect of the scattered subwaves on tunneling; it is shown that the resonant or band-pass structures in tunneling probability are determined by the phase shift results from the scattered subwaves.展开更多
文摘In the present study,a comparison between the new shallow tunneling method(STM)and the traditional pile and rib method(PRM)was conducted to excavate and construct subway stations in the geological conditions of Tehran.First,by selecting Station Z6 located in the Tehran Subway Line 6 as a case study,the construction process was analyzed by PRM.The maximum ground settlement of 29.84 mm obtained from this method was related to the station axis,and it was within the allowable settlement limit of 30 mm.The acceptable agreement between the results of numerical modeling and instrumentation data indicated the confirmation and accuracy of the excavation and construction process of Station Z6 by PRM.In the next stage,based on the numerical model validated by instrumentation data,the value of the ground surface settlement was investigated during the station excavation and construction by STM.The results obtained from STM showed a significant reduction in the ground surface settlement compared to PRM.The maximum settlement obtained from STM was 6.09 mm as related to the front of the excavation face.Also,the sensitivity analysis results denoted that in addition to controlling the surface settlement by STM,it is possible to optimize some critical geometric parameters of the support system during the station excavation and construction.
基金The project supported by National Natural Science Foundation of China under Grant No. 90403014.Acknowledgments The author would like to thank X.H. Meng for discussions.
文摘Hawking radiation of black ring solutions to 5-dimensional Einstein-Maxwell-dilaton theory is analyzed by use of the Parikh-Wilczek tunneling method. To get the correct tunneling amplitude and emission rate, we adopt and develop the Angheben-Nadalini-Vanzo Zerbini covariant approach to cover the effects of rotation and electronic discharge all at once, and the effect of back reaction is also taken into account. This constitutes a unified approach to the tunneling problem. Provided the first law of thermodynamics for black rings holds, the emission rate is proportional to the exponential of the change of Bekenstein-Hawking entropy. Explicit calculation for black ring temperatures agrees exactly with the results obtained via the classical surface gravity method and the quasi-local formalism.
基金Project supported by the Natural Science Foundation of Hebei Province,China(Grant No.A2011202129)
文摘The original formula to calculate the tunneling rate through event horizons is apparently dependent on the type of coordinates used. In this paper, we propose an invariant expression under canonical transformations to study the tunneling effect. Moreover, the problem of factor 2 is solved naturally. As an application of this expression, we obtain the same tunneling rate both in the Schwarzschild and the Painlev6 coordinates. It is shown that once the suitable formula to calculate tunneling rate is correctly identified, the tunneling method is manifestly covariant.
基金General Directorate of Highways(KGM)for their supports。
文摘Since the development of the new Austrian tunnelling method(NATM)in the 1960s,this technique has been applied successfully in many tunnels.However,opinions of NATM principles emerged till 2000,i.e.NATM is not a tunnelling method,but an approach covering all general principles of tunnelling.To investigate the general principles of the NATM,this study focused on tunnelling practises in the Bolu tunnel,and evaluated the conditions under which the NATM practises could be effective.The Bolu tunnel project was designed following the NATM principles.It is evident that practises adopted in this tunnel are important with respect to the NATM.In addition,it shows that the solutions to the problems encountered in this tunnel are consistent with the NATM principles.Finally,the study determines the ground types of the NATM principles and proposes associated updates.
文摘In this paper,the wind load on an arc-shaped canopy roof was studied with numerical wind tunnel method(NWTM) .Three-dimensional models were set up for the canopy roof with opened or closed skylights.The air flow around the roof under wind action from three directions was analysed respectively.Wind pressure coefficients on the canopy roof were determined by NWTM.The results of NWTM agreed well with those of wind tunnel test for the roof with opened skylights,which verified the applicability and rationality of NWTM.The effect of the closure of skylights was then investigated with NWTM.It was concluded that the closure of the skylights may increase the wind suction on the top surface of the roof greatly and should be considered in the structure design of the canopy roof.
文摘Mass movements are very common problems in the eastern Black Sea region of Turkey due to its climate conditions, geological, and geomorphological characteristics. High slope angle, weathering, dense rainfalls, and anthropogenic impacts are generally reported as the most important triggering factors in the region. Following the portal slope excavations in the entrance section of Cankurtaran tunnel, located in the region, where the highly weathered andesitic tuff crops out, a circular toe failure occurred. The main target of the present study is to investigate the causes and occurrence mechanism of this failure and to determine the feasible remedial measures against it using finite element method(FEM) in four stages. These stages are slope stability analyses for pre-and postexcavation cases, and remediation design assessments for slope and tunnel. The results of the FEM-SSR analyses indicated that the insufficient initial support design and weathering of the andesitic tuffs are the main factors that caused the portal failure. After installing a rock retaining wall with jet grout columns and reinforced slope benching applications, the factor of safety increased from 0.83 to 2.80. In addition toslope stability evaluation, the Rock Mass Rating(RMR), Rock Mass Quality(Q) and New Austrian Tunneling Method(NATM) systems were also utilized as empirical methods to characterize the tunnel ground and to determine the tunnel support design. The performance of the suggested empirical support design, induced stress distributions and deformations were analyzed by means of numerical modelling. Finally, it was concluded that the recommended stabilization technique was essential for the dynamic long-term stability and prevents the effects of failure. Additionally, the FEM method gives useful and reasonably reliable results in evaluating the stability of cut slopes and tunnels excavated both in continuous and discontinuous rock masses.
基金support of China University of Geosciences (Wuhan)
文摘Estimation of tunnel diameter convergence is a very important issue for tunneling construction,especially when the new Austrian tunneling method(NATM) is adopted.For this purpose,a systematic convergence measurement is usually implemented to adjust the design during the whole construction,and consequently deadly hazards can be prevented.In this study,a new fuzzy model capable of predicting the diameter convergences of a high-speed railway tunnel was developed on the basis of adaptive neuro-fuzzy inference system(ANFIS) approach.The proposed model used more than 1 000 datasets collected from two different tunnels,i.e.Daguan tunnel No.2 and Yaojia tunnel No.1,which are part of a tunnel located in Hunan Province,China.Six Takagi-Sugeno fuzzy inference systems were constructed by using subtractive clustering method.The data obtained from Daguan tunnel No.2 were used for model training,while the data from Yaojia tunnel No.1 were employed to evaluate the performance of the model.The input parameters include surrounding rock masses(SRM) rating index,ground engineering conditions(GEC) rating index,tunnel overburden(H),rock density(?),distance between monitoring station and working face(D),and elapsed time(T).The model’s performance was assessed by the variance account for(VAF),root mean square error(RMSE),mean absolute percentage error(MAPE) as well as the coefficient of determination(R2) between measured and predicted data as recommended by many researchers.The results showed excellent prediction accuracy and it was suggested that the proposed model can be used to estimate the tunnel convergence and convergence velocity.
文摘This paper presents the application of a hybrid finite-discrete element method to study blast-induceddamage in circular tunnels. An extensive database of field tests of underground explosions above tunnelsis used for calibrating and validating the proposed numerical method; the numerical results areshown to be in good agreement with published data for large-scale physical experiments. The method isthen used to investigate the influence of rock strength properties on tunnel durability to withstand blastloads. The presented analysis considers blast damage in tunnels excavated through relatively weak(sandstone) and strong (granite) rock materials. It was found that higher rock strength will increase thetunnel resistance to the load on one hand, but decrease attenuation on the other hand. Thus, undercertain conditions, results for weak and strong rock masses are similar. 2014 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting byElsevier B.V. All rights reserved.
基金Financial supports from the National Natural Science Foundation of China(Grant Nos.51579188 and 51409198)the National Basic Research Program of China(Grant No.2011CB013503)
文摘Numerous deep underground projects have been designed and constructed in China, which are beyond the current specifications in terms of scale and construction difficulty. The severe failure problems induced by high in situ stress, such as rockburst, spalling, damage of deep surrounding rocks, and timedependent damage, were observed during construction of these projects. To address these problems, the dynamic design method for deep hard rock tunnels is proposed based on the disintegration process of surrounding rocks using associated dynamic control theories and technologies. Seven steps are basically employed:(i) determination of design objective,(ii) characteristics of site, rock mass and project, and identification of constraint conditions,(iii) selection or development of global design strategy,(iv)determination of modeling method and software,(v) preliminary design,(vi) comprehensive integrated method and dynamic feedback analysis, and(vii) final design. This dynamic method was applied to the construction of the headrace tunnels at Jinping II hydropower station. The key technical issues encountered during the construction of deep hard rock tunnels, such as in situ stress distribution along the tunnels, mechanical properties and constitutive model of deep hard rocks, determination of mechanical parameters of surrounding rocks, stability evaluation of surrounding rocks, and optimization design of rock support and lining, have been adequately addressed. The proposed method and its application can provide guidance for deep underground projects characterized with similar geological conditions.
基金financial support provided by Natural Science Foundation of China (Grant No. 51008188)by Shanghai Natural Science Foundation (Grant No. 15ZR1429400)+2 种基金by Open Project Program of State Key Laboratory Breeding Base of Mountain Bridge and Tunnel Engineering (Grant No. CQSLBF-Y15-1)by Open Project Program of State Key Laboratory of Geohazard Prevention and Geoenvironment Protection (Grant No. SKLGP2015K015)by the Open Project Program of Key Laboratory of Geohazard Prevention of Hilly Mountains, Ministry of Land and Resources (Grant No. 2015k005)
文摘This paper focuses on the analytical derivation and the numerical simulation analyses to predict the interaction influences between a landslide and a new tunnel in mountain areas. Based on the slip-line theory, the disturbance range induced by tunneling and the minimum safe distance between the tunnel vault and the sliding belt are obtained in consideration of the mechanical analyses of relaxed rocks over the tunnel opening. The influence factors for the minimum safe crossing distance are conducted,including the tunnel radius, the friction angle of surrounding rocks, the inclination angle of sliding belt,and the friction coefficient of surrounding rocks. Secondly, taking account of the compressive zone and relaxed rocks caused by tunneling, the Sarma method is employed to calculate the safety factor of landslide. Finally, the analytical solutions for interaction between the tunnel and the landslide are compared with a series of numerical simulations, considering the cases for different perpendicular distances between the tunnel vault and the sliding belt. Resultsshow that the distance between the tunnel vault and the slip zone has significant influence on the rock stress and strain. For the case of the minimum crossing distance, a plastic zone in the landslide traversed by tunneling would be formed with rather large range, which seriously threatens the stability of landslide. This work demonstrates that the minimum safe crossing distance obtained from numerical simulation is in a good agreement with that calculated by the proposed analytical solutions.
基金This research was funded by the National Project"973"(GrantNo. 2010CB732100)NSF of Chongqing (Grant No. CSTC2009BC0002)
文摘The paper first analyzes the failure mechanism and mode of tunnel according to model experiments and mechanical calculation and then discusses the deficiency of taking the limit value of displacement around the tunnel and the size of the plastic zone of surrounding rock as the criterion of stability. So the writers put forward the idea that the safety factor of surrounding rock calculated through strength reduction FEM(finit element method) should be regarded as the criterion of stability,which has strict mechanical basis and unified standard and would not be influenced by other factors. The paper also studies the safety factors of tunnel surrounding rock (safety factors of shear and tension failure) and lining and some methods of designing and calculating tunnels. At last,the writers take the loess tunnel for instance and show the design and calculation results of two-lane railway tunnel.
文摘In this paper, stress behavior of shallow tunnels under simultaneous non-uniform surface traction and symmetric gravity loading was studied using a direct boundary element method(BEM). The existing fullplane elastostatic fundamental solutions to displacement and stress fields were used and implemented in a developed algorithm. The cross-section of the tunnel was considered in circular, square, and horseshoe shapes and the lateral coefficient of the domain was assumed as unit quantity. Double-node procedure of the BEM was applied at the corners to improve the model including sudden traction changes. The results showed that the method used was a powerful tool for modeling underground openings under various external as well as internal loads. Eccentric loads significantly influenced the stress pattern of the surrounding tunnel. The achievements can be practically used in completing and modifying regulations for stability investigation of shallow tunnels.
基金supported by the National Natural Science Foundation of China(Nos.11304161,11104148,21573117,51171082,11404172 and 61322508)the 1000 Youth Talents Plan+2 种基金the Tianjin Natural Science Foundation(Nos.13JCYBJC41100 and 14JCZDJC37700)the National Basic Research Program of China(973 Program,Nos.2014CB931703 and 2013CB328701)the Fundamental Research Funds for the Central Universities
文摘Photo-corrosion is one of the major obstacles for CdS application in wet chemical fields, and atomic layer deposition (ALD) has been proposed as an effective way to suppress the corrosion. Here, prior to ALD coating, CdS, one facilely corrosive photocatalyst, was synthesized via hydrothermal synthesis to access the fundamental corrosion mechanism and the according corrosive sites. X-ray photoelectron spectros- copy (XPS) and X-ray diffraction (XRD) demonstrated that the failure of catalytic decomposition of methylene blue originated from the formation of soluble CdSO4 by oxidizing S2 of as-prepared CdS. High resolu- tion transmission electron microscopy (HRTEM) further identified the active sites in the V-shaped regions ofCdS nanoparticles, confirmed by the simulated electric field distribution. To rationally coat oxides on CdS, the right candidates and their thicknesses have been considered by our tunneling model with trans- fer matrix method based on quantum mechanism, upon which the thickness of protective layer should be less than 0.5 nm to maintain a high tunneling probability, and thus one cycle of ALD TiO2 or AbO3 was proposed to passivate the CdS powder to balance the carrier transportation and corrosion suppres- sion. Based on HRTEM results, we found that the active V-shaped region was covered by ALD oxides (TiO2 or AbO3). For each case, no soluble CdSO4 has been found before and after photocatalytic reactions based XPS measurements. Importantly, we noticed that with the passivation of one cycle of ALD, the catalyst's lifetime was elongated up to 〉14 times higher than that of the as-prepared CdS.
基金Beijing Science and Technology Planning Project(CN),Grant/Award Number:Z201100008120013Fundamental Research Funds for the Central Universities,Grant/Award Number:2022YQLJ01Major Achievements Transformation and Industrialization Projects of Central Universities in Beijing,Grant/Award Number:ZDZH20141141301。
文摘The shallow tunnelling method(STM)often uses temporary supports to divide large section tunnels into several closed or semiclosed sections so as to share the upper load.The complex support system composed of primary and temporary supports can ensure safety during tunnel construction.Based on the large section tunnel of Beijing Subway Line 12,the mechanical characteristics of support system by the double-side-drift method(DSDM)during excavation and demolition were analyzed through numerical simulation and monitoring.The study showed that the middle cave excavation was the most critical stage of the DSDM,during which the load on the supporting structure increased significantly.The temporary vertical support bore most of the new load during middle cave excavation.During the demolition stage,the load was redistributed,which caused arch settlement and section convergence.The removal of the temporary vertical support exerted the greatest impact in this process.The lateral temporary inverted arch changed from axial compression to axial tension after the middle and lower caves were excavated.Based on the mechanical characteristics of the support system,some engineering suggestions were proposed for large section tunnel construction.These research results can provide reference for the design and construction of similar large section tunnels.
基金supported by the State Key Laboratory of Advanced Optical Communication Systems and Networks (Grant No. 2008SH05)
文摘Since novel optoelectronic devices based on the peculiar behaviors of the tunneling probability, e.g., resonant tunneling devices (RTD) and band-pass filter, are steadily proposed, the analytic transfer matrix (ATM) method is extended to study these devices. For several examples, we explore the effect of the scattered subwaves on tunneling; it is shown that the resonant or band-pass structures in tunneling probability are determined by the phase shift results from the scattered subwaves.