Determination of Wind Pressure Coefficients for Arc-Shaped Canopy Roof with Numerical Wind Tunnel Method
1
作者 尹越 张天舒 +1 位作者 韩庆华 杨惠东 《Transactions of Tianjin University》 EI CAS 2009年第5期360-365,共6页
In this paper,the wind load on an arc-shaped canopy roof was studied with numerical wind tunnel method(NWTM) .Three-dimensional models were set up for the canopy roof with opened or closed skylights.The air flow aroun... In this paper,the wind load on an arc-shaped canopy roof was studied with numerical wind tunnel method(NWTM) .Three-dimensional models were set up for the canopy roof with opened or closed skylights.The air flow around the roof under wind action from three directions was analysed respectively.Wind pressure coefficients on the canopy roof were determined by NWTM.The results of NWTM agreed well with those of wind tunnel test for the roof with opened skylights,which verified the applicability and rationality of NWTM.The effect of the closure of skylights was then investigated with NWTM.It was concluded that the closure of the skylights may increase the wind suction on the top surface of the roof greatly and should be considered in the structure design of the canopy roof. 展开更多
关键词 arc-shaped canopy roof numerical wind tunnel method wind pressure coefficient wind tunnel test skylights
在线阅读 下载PDF
Evaluation of new Austrian tunnelling method applied to Bolu tunnel’s weak rocks 被引量:6
2
作者 Ebu Bekir Aygar 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2020年第3期541-556,共16页
Since the development of the new Austrian tunnelling method(NATM)in the 1960s,this technique has been applied successfully in many tunnels.However,opinions of NATM principles emerged till 2000,i.e.NATM is not a tunnel... Since the development of the new Austrian tunnelling method(NATM)in the 1960s,this technique has been applied successfully in many tunnels.However,opinions of NATM principles emerged till 2000,i.e.NATM is not a tunnelling method,but an approach covering all general principles of tunnelling.To investigate the general principles of the NATM,this study focused on tunnelling practises in the Bolu tunnel,and evaluated the conditions under which the NATM practises could be effective.The Bolu tunnel project was designed following the NATM principles.It is evident that practises adopted in this tunnel are important with respect to the NATM.In addition,it shows that the solutions to the problems encountered in this tunnel are consistent with the NATM principles.Finally,the study determines the ground types of the NATM principles and proposes associated updates. 展开更多
关键词 Bolu tunnel New Austrian tunnelling method(NATM) Support types
在线阅读 下载PDF
Risk identification and risk mitigation during metro station construction by enlarging shield tunnel combined with cut-and-cover method 被引量:4
3
作者 Zhang, Xinjin Liu, Weining Lu, Meili 《Journal of Southeast University(English Edition)》 EI CAS 2008年第S1期142-146,共5页
Constructing a metro station by enlarging shield tunnels combined with a mining/cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a n... Constructing a metro station by enlarging shield tunnels combined with a mining/cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a new-style construction method, there are several specific risks involved in the construction process. Based on the test section of Sanyuanqiao station on Beijing metro line 10, and combined with the existing methods of risk identification at present, including a review of world-wide operational experience of similar projects, the study of generic guidance on hazards associated with the type of work being undertaken, and discussions with qualified and experienced staff from the project team, etc., the specific risks during the construction process of the metro station constructed by enlarging shield tunnels combined with the cut-and-cover method are identified. The results show that the specific risks mainly come from three construction processes which include constructing upper enclosure structures, excavating the soil between shield tunnels and demolishing shield segments. Then relevant risk mitigation measures are put forward. The results can provide references for scheme improvement and a comprehensive risk assessment of the new-style construction method. 展开更多
关键词 shield tunnel cut-and-cover method metro station risk identification risk mitigation
在线阅读 下载PDF
Assessment of strain bursting in deep tunnelling by using the finite-discrete element method 被引量:11
4
作者 Ioannis Vazaios Mark S.Diederichs Nicholas Vlachopoulos 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2019年第1期12-37,共26页
Rockbursting in deep tunnelling is a complex phenomenon posing significant challenges both at the design and construction stages of an underground excavation within hard rock masses and under high in situ stresses. Wh... Rockbursting in deep tunnelling is a complex phenomenon posing significant challenges both at the design and construction stages of an underground excavation within hard rock masses and under high in situ stresses. While local experience, field monitoring, and informed data-rich analysis are some of the tools commonly used to manage the hazards and the associated risks, advanced numerical techniques based on discontinuum modelling have also shown potential in assisting in the assessment of rockbursting. In this study, the hybrid finite-discrete element method(FDEM) is employed to investigate the failure and fracturing processes, and the mechanisms of energy storage and rapid release resulting in bursting, as well as to assess its utility as part of the design process of underground excavations.Following the calibration of the numerical model to simulate a deep excavation in a hard, massive rock mass, discrete fracture network(DFN) geometries are integrated into the model in order to examine the impact of rock structure on rockbursting under high in situ stresses. The obtained analysis results not only highlight the importance of explicitly simulating pre-existing joints within the model, as they affect the mobilised failure mechanisms and the intensity of strain bursting phenomena, but also show how the employed joint network geometry, the field stress conditions, and their interaction influence the extent and depth of the excavation induced damage. Furthermore, a rigorous analysis of the mass and velocity of the ejected rock blocks and comparison of the obtained data with well-established semi-empirical approaches demonstrate the potential of the method to provide realistic estimates of the kinetic energy released during bursting for determining the energy support demand. 展开更多
关键词 ROCKBURST Finite-discrete element method(FDEM) Deep tunnelLING Hard rock EXCAVATIONS Brittle fracturing DISCRETE fracture network(DFN)
在线阅读 下载PDF
Hyperstatic reaction method for calculations of tunnels with horseshoe-shaped cross-section under the impact of earthquakes 被引量:1
5
作者 Thanh Nguyen Chi Gospodarikov Alexandr 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2020年第1期179-188,共10页
Tunnels are now an integral part of the infrastructure in major cities around the world. For many reasons, these tunnels have horseshoe-shaped cross-sections with round top and flat bottom. This paper presents some im... Tunnels are now an integral part of the infrastructure in major cities around the world. For many reasons, these tunnels have horseshoe-shaped cross-sections with round top and flat bottom. This paper presents some improvements to the use of the Hyperstatic Reaction Method-HRM for analysing tunnels with horseshoe-shaped cross-sections when these tunnels operate under the influence of earthquakes, particularly in cases when the tunnel lining is a continuous lining. The analysis used parameters of a tunnel from the Hanoi metro system, as well as parameters of the strongest earthquake that may occur in the central Hanoi area in the improved HRM and 2 D numerical methods using the ABAQUS software. On the basis of the results obtained, the paper gives conclusions about the HRM methodology when it is used to calculate tunnels that have horseshoe cross-sections operating under the influence of earthquakes. 展开更多
关键词 hyperstatic reaction method earthquake horseshoe cross-section impact tunnel
在线阅读 下载PDF
The Types of Tunnels Maintenance in Umbrella Arch Method
6
作者 Arash Rostami Parham Kamali Dehkordi +2 位作者 Morteza Askari Ziarati Saman Jahani Kamran Lotfi 《Open Journal of Civil Engineering》 2016年第2期156-162,共7页
During tunneling in loose grounds, the ground deformation caused by drillings around the tunnel, leads to land subsidence and the adjacent tunnel which would affect tunnel structure and surrounding structures. In such... During tunneling in loose grounds, the ground deformation caused by drillings around the tunnel, leads to land subsidence and the adjacent tunnel which would affect tunnel structure and surrounding structures. In such situations it is necessary to improve the properties of the ground prior to drilling operations. In order to acquire tunnel face stability during excavation operations in areas with loose soil fault or areas with lack of adhesion, there are various methods such as split cross drilling, frame holder or auxiliary pre-holding methods such as umbrella arch method;pre-holding methods must provide safety when drilling and must be affordable, economically. In this study, we assessed the previous studies on methods and behaviors of umbrella arch strategy in reinforcing the concrete tunnels, reached the purpose with experimental and numerical methods and offered the latest design achievements, implementation progresses and analysis in relation with this method. 展开更多
关键词 tunnel DRILLING Umbrella Arch method Forepole ARMING
在线阅读 下载PDF
囊袋注浆法抬升盾构隧道试验
7
作者 黄大维 施良晨 +3 位作者 罗文俊 闫江 樊潇宇 曾小涛 《隧道建设(中英文)》 北大核心 2026年第1期80-89,共10页
为解决注浆抬升技术整治地铁盾构隧道不均匀沉降效果不佳的问题,采用囊袋注浆方法进行盾构隧道抬升效果试验研究。先将浆液注入至隧道底部正下方的囊袋中,再对所抬升的隧道周围附加土压力与隧道变形进行量测。试验结果表明:1)采用新式... 为解决注浆抬升技术整治地铁盾构隧道不均匀沉降效果不佳的问题,采用囊袋注浆方法进行盾构隧道抬升效果试验研究。先将浆液注入至隧道底部正下方的囊袋中,再对所抬升的隧道周围附加土压力与隧道变形进行量测。试验结果表明:1)采用新式囊袋注浆法进行隧道底部注浆抬升,浆液不发生扩散,且在囊袋的约束下能够均匀分布,形状可控,可有效避免发生跑浆,隧道注浆抬升效果明显,隧道变形更稳定。2)相对单点注浆,多点囊袋注浆法对隧道周围土体产生的附加土压力变化更大,分布更加均匀。3)在囊袋注浆产生的附加土压力作用下,模型盾构隧道的竖向直径减小,水平直径增大,发生明显的横椭圆变形;与单点注浆相比,平均单个囊袋的注浆量变小时,采用多点同时注浆,盾构隧道变形更明显、更缓和。4)相对单点注浆,多点同时注浆对隧道的抬升量更显著,且降低管片错台、局部应力集中风险。因此,实际工程中建议考虑囊袋注浆法并采用多点注浆。 展开更多
关键词 盾构隧道 囊袋注浆法 注浆抬升 模型试验 附加土压力
在线阅读 下载PDF
Structural mechanism and construction method of mud and water inrush in Xiangyun tunnel of Guangtong-Dali railway
8
作者 WANG Yawei 《Global Geology》 2019年第3期167-178,共12页
Mud and water inrush in tunnel is a common problem in the construction process. Nowadays, the research and classification on this are mostly focused on karst situations. According to the characteristics of the surroun... Mud and water inrush in tunnel is a common problem in the construction process. Nowadays, the research and classification on this are mostly focused on karst situations. According to the characteristics of the surrounding rock and damage forms of the tunnel in the studied area, the author analyzed the geological and structural characteristics of mud and water inrush in tunnel and obtained their construction type. Meanwhile, the advanced water detection under the complex geological conditions was studied by using induced polarization method, transient electromagnetic method and three-dimensional seismic method, it can be concluded that the water-rich fracture zone exists within the detection range with a risk of large mud and water inrush disaster. The concrete construction treatment measures are put forward:①cement-water glass binary slurry is selected as the material for ground and hole grouting, its advantage is that the gel time can be controlled, and it has certain grout ability in the strata with large permeability coeffcient, which is conducive to excavate construction immediately after grouting.②applying the mature retrograde grouting construction can reduce grouting time and improve the excavation efficiency. 展开更多
关键词 MUD and water inrush geological model Xiangyun tunnel Guangtong-Dali RAILWAY STRUCTURAL mechanism construction method
在线阅读 下载PDF
基于随机场理论的黄土隧道开挖地表变形分析
9
作者 欧尔峰 张旭旭 管性钰 《地下空间与工程学报》 北大核心 2026年第1期347-357,366,共12页
场地土体力学参数空间变异性给工程建设带来困难。为探讨土体力学参数空间变异性对盾构隧道施工引起地表变形的影响,依据西安市某地铁区间盾构隧道工程,考虑黄土力学参数弹性模量E、黏聚力c、内摩擦角φ空间变异性,利用协方差矩阵分解... 场地土体力学参数空间变异性给工程建设带来困难。为探讨土体力学参数空间变异性对盾构隧道施工引起地表变形的影响,依据西安市某地铁区间盾构隧道工程,考虑黄土力学参数弹性模量E、黏聚力c、内摩擦角φ空间变异性,利用协方差矩阵分解法建立土体力学参数的随机场模型,结合Monte-Carlo策略,采用有限元分析土体力学参数变异对地表变形的影响。结果表明:考虑土体力学参数空间变异性,可以避免传统分析中采用确定值为监测控制值的风险;土体力学参数空间变异性对地表变形曲线的离散程度和包络范围有较大影响,但并不会改变变形的趋势和规律;内摩擦角φ变异性对地表变形的影响较大,弹性模量E和黏聚力c影响次之,且两者影响程度相近;相关距离、变异系数与地表变形呈现正相关,相关距离越大、变异系数越大、地表变形的结果越离散,地表变形最大值与超越概率随之越大;建议在勘查阶段尽可能确定场地土体力学参数空间变异特征,施工时应该重视场地条件核查,积极采取工程措施,保证地表变形在控制范围之内。 展开更多
关键词 黄土 随机场理论 盾构隧道 协方差矩阵法
原文传递
复杂几何断面输水隧洞明满交替流水动力模拟
10
作者 崔巍 丁志楠 +5 位作者 胡宏昌 李晓晨 穆祥鹏 陈文学 牛子厚 雷毓灵 《南水北调与水利科技(中英文)》 北大核心 2026年第1期11-19,共9页
为解决在无压隧洞输水系统中因水流调控不当引发明满交替流,进而影响工程运行安全的问题,精确模拟复杂几何断面下的明满交替流现象,基于Godunov格式有限体积法、耦合Preissmann窄缝法,建立水力瞬变数学模型。采用HLLC近似Riemann求解器... 为解决在无压隧洞输水系统中因水流调控不当引发明满交替流,进而影响工程运行安全的问题,精确模拟复杂几何断面下的明满交替流现象,基于Godunov格式有限体积法、耦合Preissmann窄缝法,建立水力瞬变数学模型。采用HLLC近似Riemann求解器计算通量,以过水断面面积为重构变量,并将地形信息嵌入重构过程;结合虚拟边界法与特征线法处理闸门启闭边界。结果表明:模型精度高、计算稳定性好,可准确捕捉明满交替流动态过程,有效模拟复杂断面隧洞水力瞬变现象。工程案例仿真分析揭示:隧洞末端闸门关闭速率决定明满交替流态转换的发生;上游闸门快速关闭及退水操作可抑制压力水头波动。研究成果为明满交替流机理研究及输水系统安全运行策略制定提供了理论依据。 展开更多
关键词 复杂几何断面 长距离输水隧洞 有限体积法 Preissmann窄缝法 明满交替流
在线阅读 下载PDF
近走滑断层山岭隧道全过程地震响应研究
11
作者 刘中宪 刘佳乔 +1 位作者 张海 黄振恩 《东南大学学报(自然科学版)》 北大核心 2026年第1期61-69,共9页
充分结合间接边界元法(IBEM)在处理断层-大尺度复杂场地问题中的独特优势,以及有限元法(FEM)在模拟工程结构非线性地震响应方面的灵活性,提出了一种用于模拟断层破裂—场地放大—结构破坏全过程地震响应的IBEM-FEM耦合方法。通过模型试... 充分结合间接边界元法(IBEM)在处理断层-大尺度复杂场地问题中的独特优势,以及有限元法(FEM)在模拟工程结构非线性地震响应方面的灵活性,提出了一种用于模拟断层破裂—场地放大—结构破坏全过程地震响应的IBEM-FEM耦合方法。通过模型试算,并与IBEM模拟结果进行对比,验证了该耦合方法的准确性。进一步以近走滑断层山岭隧道模型为例,基于该耦合方法,研究了在设定震级Mw6.7下,不同断层破裂速度对山岭隧道结构地震响应的影响。结果表明,随着断层破裂速度的增加,隧道等效塑性应变以及损伤范围和程度均显著加剧。尤其在超剪切破裂条件下,隧道空间分布呈现出更强的不均匀性。因此,在近断层区域,山岭隧道的抗震设计应特别关注并加强对超剪切破裂的防范,提升其在极端地震条件下的适应性与抗震韧性。 展开更多
关键词 山岭隧道 三维IBEM-FEM耦合法 走滑断层 全过程地震响应 超剪切破裂
在线阅读 下载PDF
考虑轴力与刚度突变的盾构隧道纵向地震响应解析
12
作者 关振长 杨泽龙 +2 位作者 任璐瑶 陈思明 罗嵩 《岩土工程学报》 北大核心 2026年第3期632-641,654,共11页
为合理估算盾构隧道纵向地震响应,将隧道简化为Pasternak弹性地基上的Timoshenko梁,考虑轴力与刚度突变的影响,推导出纵向与横向地层位移作用下的微分控制方程,并通过有限差分理论进行求解。进一步地,将理论计算结果与有限元模拟结果对... 为合理估算盾构隧道纵向地震响应,将隧道简化为Pasternak弹性地基上的Timoshenko梁,考虑轴力与刚度突变的影响,推导出纵向与横向地层位移作用下的微分控制方程,并通过有限差分理论进行求解。进一步地,将理论计算结果与有限元模拟结果对比,验证了理论方法的有效性和可靠性,并探讨了盾构隧道加强段与常规段的纵向刚度比、地基反力系数、残余轴力等关键参数对隧道纵向地震响应的影响规律。结果表明:盾构隧道刚度的提升能够有效提高隧道的抗震性能,但在刚度突变处附近,隧道刚度相对较小的区段(常规段或劣化段)在地震作用下可能发生较大的环间局部非连续变形(张开、错台);降低隧道纵向刚度比以及缩短加强段的长度,可以显著减少刚度突变对隧道纵向地震响应的不利影响。盾构隧道的环间局部变形与地基反力系数呈正相关,且局部变形随着地震波波长的增大先增后减;当地基反力系数较大时,且地震波波长在20~120 m范围内,隧道刚度突变处可能发生较大的张开和错台。隧道残余轴力能够在一定程度上提升盾构隧道抗震性能,且入射角和隧道刚度相对较小时,提升效果更为显著。 展开更多
关键词 盾构隧道 纵向地震响应 反应位移法 纵向刚度突变
原文传递
Needle-Tunneling法膜系自动设计 被引量:4
13
作者 林永昌 张诚 李芳 《光学仪器》 1999年第4期5-11,共7页
综述了Needle和Tunneling 法膜系自动设计的基本原理,举出它们的应用实例,并且指出一个优秀的光学膜系自动设计程序应该包括Needle 法、Tunneling 法和传统的优化方法。它们的结合和交叉使用,使我们... 综述了Needle和Tunneling 法膜系自动设计的基本原理,举出它们的应用实例,并且指出一个优秀的光学膜系自动设计程序应该包括Needle 法、Tunneling 法和传统的优化方法。它们的结合和交叉使用,使我们有可能从单层膜开始设计任意光学性能的多层膜。 展开更多
关键词 Needle法 tunneling法 自动设计 光学膜系
在线阅读 下载PDF
格构法在铁路隧道缺陷病害整治中的应用与实践
14
作者 王立川 梁明 +4 位作者 龚伦 刘志强 张学民 周宗青 李文广 《铁道标准设计》 北大核心 2026年第2期122-128,153,共8页
运营铁路隧道缺陷病害存在开裂、掉块风险,不同程度地威胁运营安全,应彻底整治、不留隐患,但实际工程整治过程中存在许多过度整治问题。针对实际工程中的过度整治,通过前期理论研究,经10余年探索与应用,依托实际工程开展实用性研究,基... 运营铁路隧道缺陷病害存在开裂、掉块风险,不同程度地威胁运营安全,应彻底整治、不留隐患,但实际工程整治过程中存在许多过度整治问题。针对实际工程中的过度整治,通过前期理论研究,经10余年探索与应用,依托实际工程开展实用性研究,基于充分利用既有衬砌承载能力、微创修缮的理念,提出一种适用性、操作性、经济性更高的运营隧道缺陷病害整治方法。格构法遵循“重视既有结构、现场调查、整治措施,工程耐久性、后期观测,区别对待、分级处理,施工迅捷、少扰动、一次到位”整治原则,基于隧道各类缺陷病害具有的层次分明、“网格式”处理框架特点,设计体现格构法内涵的局部拆换补强和全环网格式加固方案,提出重构部位开裂掉块防控及耐久性保障措施,形成补强衬砌质量检测标准方法;依托工程实例及效果的统计和对比分析,格构法相比钢筋混凝土套衬整治时间减少89%、整治成本节约71%和碳排放量降低96%,验证了格构法在整治时间、整治成本和安全风险等方面的优势,突破了常规大拆大换整治方法的锢桎,具广阔的应用前景。 展开更多
关键词 运营铁路 铁路隧道 隧道缺陷病害 格构法 病害整治 工程应用
在线阅读 下载PDF
软土富水地层地铁盾构隧道联络通道冻结法+预应力支撑施工方案
15
作者 何晟亚 王志杰 《城市轨道交通研究》 北大核心 2026年第1期67-74,共8页
[目的]软弱富水地层施工条件差,地铁盾构隧道的联络通道施工会对原结构的完整性及周边地层的稳定性造成较大影响。为提高施工安全性,有必要研究联络通道冻结法+预应力支撑施工方案。[方法]以深圳城市轨道交通3号线坪西站—低碳城站区间... [目的]软弱富水地层施工条件差,地铁盾构隧道的联络通道施工会对原结构的完整性及周边地层的稳定性造成较大影响。为提高施工安全性,有必要研究联络通道冻结法+预应力支撑施工方案。[方法]以深圳城市轨道交通3号线坪西站—低碳城站区间联络通道及泵站工程为依托,提出了冻结法+预应力支撑施工方案,阐述了冻结参数及施工步骤。通过有限元模拟计算,系统性地分析了冻结壁和预应力支撑的承载性能;通过现场监测,分析了施工扰动控制效果。[结果及结论]根据有限元模拟计算结果,冻结壁的最大弯拉应力、压应力和切应力分别为0.07 MPa、1.31 MPa和0.50 MPa,满足2.0的安全系数要求。联络通道正常段冻结壁的最大变形量为21.0 mm,约为泵站冻结壁最大变形量的3.9倍。按均匀工况和不均匀工况,在500 kN的节点预应力作用下,支撑的强度计算应力比及稳定应力比均不超过0.7,具有良好的空间稳定性和承载性能。现场监测结果表明,采用冻结法+预应力支撑施工方案能有效控制联络通道施工对地面建筑及原管片衬砌的扰动。 展开更多
关键词 地铁隧道 联络通道 冻结法 预应力支撑
在线阅读 下载PDF
基于MODFLOW-CFP模型的岩溶隧道涌水量预测
16
作者 潘毅 王思琪 +4 位作者 谭家华 赵恒 林宇航 童紫茹 万军伟 《地质科技通报》 北大核心 2026年第1期247-257,共11页
隧道工程穿越岩溶地区时往往面临着高危害性的突涌水灾害,尤其当隧道穿越地下暗河系统时,施工和运营安全有巨大风险,因此准确预测隧道涌水量不仅是工程建设关注的焦点,同时也是隧道涌水量预测方法的难点。以鄂西后湾暗河系统为例,开展基... 隧道工程穿越岩溶地区时往往面临着高危害性的突涌水灾害,尤其当隧道穿越地下暗河系统时,施工和运营安全有巨大风险,因此准确预测隧道涌水量不仅是工程建设关注的焦点,同时也是隧道涌水量预测方法的难点。以鄂西后湾暗河系统为例,开展基于MODFLOW-CFP模型的隧道涌水量预测模拟方法研究,尤其是数值模型构建、模型识别过程中容易被忽视的岩溶水文地质调查、降雨与暗河流量响应过程监测以及地下水示踪试验等基础工作方法的研究,在此基础上构建岩溶地区隧道涌水量预测的MODFLOW-CFP模型,开展不同隧道设计方案的涌水量预测和对比分析,为隧道工程设计优化提供依据。研究查明了后湾岩溶水系统的范围、边界条件、地下水循环特征和降雨与水文响应规律,准确识别了后湾暗河地下管道的特征参数,为MODFLOW-CFP数值模拟方法的准确应用提供了基础,最终模型的线性相关系数R2为0.831,纳什效率系数NSE为0.71,能够良好地反映系统的水文过程。涌水量预测结果显示:极端强降雨(日降雨量P=325 mm)情景下,不同的隧道设计标高(1350,1330,1318,1270 m),涌水量峰值差异极大,分别为0,0.52,8.17,14.88 m3/s。研究表明抬高隧道设计标高能够有效减小隧道突涌水量,降低隧道突涌水风险。本研究采用的岩溶地下水系统调查、监测、试验和数值模拟方法可以为类似地区提供借鉴。 展开更多
关键词 管道型岩溶水系统 调查方法 隧道涌水量预测 数值模拟 MODFLOW-CFP
在线阅读 下载PDF
盾构管廊隔板设置方式对结构力学性能影响分析
17
作者 裴行凯 伊欣 +1 位作者 周思超 李洪波 《地下空间与工程学报》 北大核心 2026年第1期270-278,共9页
为了探明不同的分舱隔板设置方式与连接节点形式对管廊结构的影响,采用有限元方法建立管廊结构模型,分析在地层荷载、地面超载以及设备荷载作用下分舱隔板简支和刚接时的管片结构内力,并通过室内试验与数值计算讨论了3种连接方式下边梁... 为了探明不同的分舱隔板设置方式与连接节点形式对管廊结构的影响,采用有限元方法建立管廊结构模型,分析在地层荷载、地面超载以及设备荷载作用下分舱隔板简支和刚接时的管片结构内力,并通过室内试验与数值计算讨论了3种连接方式下边梁中钢牛腿的力学性能及其对管片损伤的影响。结果表明:分舱隔板的施加将减小管片结构上半环的弯矩和轴力,同时增大下半环的弯矩与轴力,但隔板与边梁连接方式对管片结构力学特征的影响较小;边梁与管片采用钢牛腿+扩底锚栓的连接方式时管片表面开裂主要集中在最上排锚孔下侧,增加锚栓数量能有效控制管片开裂以及减小钢牛腿的最大位移,采用9根锚栓相较于6根锚栓牛腿最大位移最多减小了54.2%;在锚栓数量相同的情况下,增加锚栓列数能更好地减小管片内部混凝土损伤,以及控制牛腿变形。 展开更多
关键词 盾构隧道 综合管廊 分舱隔板 连接方式 力学性能
原文传递
洞桩法地铁车站先隧后站施工时序交互影响与变形控制
18
作者 冯冀蒙 李艺飞 +3 位作者 姚仕钰 王圣涛 张俊儒 孙宁 《隧道建设(中英文)》 北大核心 2026年第1期183-193,共11页
针对城市核心区地铁建设普遍存在的盾构穿越未完工暗挖车站引发的施工交互影响难题,以广州地铁13号线纪念堂站为工程依托,该站地处典型的上软下硬复合地层,采用洞桩法施工,且受制于狭小场地被迫实施先隧后站。为定量揭示盾构过站时机对... 针对城市核心区地铁建设普遍存在的盾构穿越未完工暗挖车站引发的施工交互影响难题,以广州地铁13号线纪念堂站为工程依托,该站地处典型的上软下硬复合地层,采用洞桩法施工,且受制于狭小场地被迫实施先隧后站。为定量揭示盾构过站时机对围岩-结构体系力学行为的作用机制,建立扣拱形成并回填后过站与扣拱形成前过站的对比工况,综合采用模型试验与数值模拟手段,对比分析先隧后站不同盾构过站时机的围岩变形以及各结构的应力演化特征。结果表明:1)洞桩法暗挖车站施工地表沉降曲线呈单峰状,上方扣拱形成后盾构过站对围岩扰动较小,地表沉降值减少5.9%;地层荷载得到了较大的释放,盾构管片应力集中程度较小,应力最大值减小24%。2)正洞上方扣拱应力最大,盾构过站对扣拱的应力影响较小。3)在此类工程中,采用暗挖车站上方扣拱形成并回填后过站是较优的施工方案。 展开更多
关键词 先隧后站 洞桩法 暗挖车站 交互影响 数值模拟 模型试验 力学行为
在线阅读 下载PDF
复合地层重叠盾构隧道施工土体变形理论研究
19
作者 魏纲 朱德涵 +2 位作者 王哲 张治国 石钰锋 《地下空间与工程学报》 北大核心 2026年第1期38-46,共9页
针对复合地层条件下的先下后上重叠隧道施工工况引起的土体变形进行了理论推导,在类随机介质理论和三维统一解的基础上,建立了可以考虑开挖面上存在多种土层情况的计算模型,并考虑了下线隧道对上线隧道变形的遮拦效应,推导得出土体变形... 针对复合地层条件下的先下后上重叠隧道施工工况引起的土体变形进行了理论推导,在类随机介质理论和三维统一解的基础上,建立了可以考虑开挖面上存在多种土层情况的计算模型,并考虑了下线隧道对上线隧道变形的遮拦效应,推导得出土体变形的计算公式。将本文理论方法代入多组实测案例进行验算,研究表明:计算结果有较好的拟合度,证明了该方法的可行性;通过单因素分析发现,在重叠隧道中上线隧道附近的土质条件对地表土体变形的影响较大;相较于单线施工,先下后上重叠隧道中的上线隧道引起的土体变形由于受到下线遮拦效应的影响,变形曲线会更浅更窄,而本文提出的遮拦效应系数能较好地体现下线隧道对上线隧道土体变形的影响,遮拦效应系数的大小与隧道轴线间距离成反比例关系,隧道间距越小,遮拦效应系数越大。 展开更多
关键词 重叠盾构 土体变形 遮拦效应 解析解法
原文传递
上一页 1 2 250 下一页 到第