Driving fatigue is one of the important causes of accidents in tunnel(group)sections.In this paper,in order to effectively identify the driving fatigue of tunnel(group)drivers,an eye tracker and other instruments were...Driving fatigue is one of the important causes of accidents in tunnel(group)sections.In this paper,in order to effectively identify the driving fatigue of tunnel(group)drivers,an eye tracker and other instruments were used to conduct real vehicle tests on long tunnel(group)expressways and thus obtain the eye movement,driving duration,and Karolinska sleepiness scale(KSS)data of 30 drivers.The impacts of the tunnel and non-tunnel sections on drivers were compared,and the relationship between blink indexes,such as the blink frequency,blink duration,mean value of blink duration,driving duration,and driving fatigue,was studied.A paired t-test and a Spearman correlation test were performed to select the indexes that can effectively characterize the tunnel driving fatigue.A driving fatigue detection model was then developed based on the XGBoost algorithm.The obtained results show that the blink frequency,total blink duration,and mean value of blink duration gradually increase with the deepening of driving fatigue,and the mean value of blink duration is the most sensitive in the tunnel environment.In addition,a significant correlation exists between the driving duration index and driving fatigue,which can provide a reference for improving the tunnel safety.Using the mean value of blink duration and driving duration as the characteristic indexes,the accuracy of the driving fatigue detection model based on the XGBoost algorithm reaches 98%.The cumulative and continuous tunnel proportion effectively estimates the driving fatigue state in a long tunnel(group)environment.展开更多
The spatial distribution of underground tunnels is significant to the stress redistribution in the surrounding rock masses and blast wave propagation.The field blasting tests were first carried out to study the propag...The spatial distribution of underground tunnels is significant to the stress redistribution in the surrounding rock masses and blast wave propagation.The field blasting tests were first carried out to study the propagation of blast-induced seismic waves through under-ground tunnels of the Xiluodu Hydropower Station in China.The results show that the peak horizontal particle vibration velocity can be used as a safety criterion for underground tunnels.The effects of in situ stresses and spatial distributions of the tunnel group on the vibra-tion velocities distribution is afterward investigated by numerical simulation.The results show that there is a significant amplification of the blasting vibrations in the adjacent tunnels,which depends on their vertical positions during the excavation of a tunnel.The peak vibration velocity decreases as the lateral separation between tunnels increases.When the separation between the tunnels exceeds the width of three tunnels,the impact of the blast waves on each part of the adjacent tunnel tends to be stable on the whole.In terms of the size of the tunnel,the blasting vibration velocity in the upper part of the straight wall on the front-blast side increases as the width increases(and then levels off),while the blasting vibration velocity in the lower part decreases as the width increases(and then levels off).Finally,a generalized formula of blasting vibration velocity considering the spatial distribution is established,which can well predict the vibration velocity of particles in underground tunnels.展开更多
Engineering disasters(e.g.rock slabbing and rockburst)of the tunnel groups induced by the transient excavation of an adjacent tunnel threaten the stability of the existing tunnel,especially for those excavated by usin...Engineering disasters(e.g.rock slabbing and rockburst)of the tunnel groups induced by the transient excavation of an adjacent tunnel threaten the stability of the existing tunnel,especially for those excavated by using the drill and blast tunneling(D&B).However,the dynamic response and failure mechanism of surrounding rocks of the existing tunnel caused by adjacent transient excavation are not clear due to the difficulty in conducting field tests and laboratory experiments.Therefore,a novel transient unloading experimental system for deep tunnel excavation was proposed in this study.The real stress path and the unloading rate can be reproduced by using this proposed system.The experiments were conducted for observing the dynamic response of the existing tunnel induced by adjacent transient excavation under different lateral pressure coefficients l(?0.4,0.6,0.8,1,1.2,1.4,1.6,1.8)with a polymethyl methacrylate(PMMA)specimen.The propagation of the impact wave and unloading surface wave was detected through the digital image correlation(DIC)analysis.The reflection of the unloading surface wave on the incident side of the existing tunnel(tunnel-E)was observed and analyzed.Moreover,the dynamic characteristics of the stress redistribution,the particle displacement and vibration velocity of surrounding rocks of tunnel-E were analyzed and summarized.In addition,the Mohr-Coulomb(MeC)failure criterion with tension cut-off was adopted to evaluate the stability of the existing tunnel under adjacent transient excavation.The results indicate that the incident side of the existing tunnel under the dynamic disturbance of transient excavation of an adjacent tunnel was more prone to fail,followed by the shadow side and the top/bottom side.展开更多
基金supported by the National Natural Science Foundation of China(52362050,52472347)Science and Technology Project of Shandong Transportation Department(2022KJ-044)+1 种基金“Hongliu Excellent Young”Talents Support Program of Lanzhou University of Technologythe Fundamental Research Funds for the Cornell University,CHD University(300102223505)。
文摘Driving fatigue is one of the important causes of accidents in tunnel(group)sections.In this paper,in order to effectively identify the driving fatigue of tunnel(group)drivers,an eye tracker and other instruments were used to conduct real vehicle tests on long tunnel(group)expressways and thus obtain the eye movement,driving duration,and Karolinska sleepiness scale(KSS)data of 30 drivers.The impacts of the tunnel and non-tunnel sections on drivers were compared,and the relationship between blink indexes,such as the blink frequency,blink duration,mean value of blink duration,driving duration,and driving fatigue,was studied.A paired t-test and a Spearman correlation test were performed to select the indexes that can effectively characterize the tunnel driving fatigue.A driving fatigue detection model was then developed based on the XGBoost algorithm.The obtained results show that the blink frequency,total blink duration,and mean value of blink duration gradually increase with the deepening of driving fatigue,and the mean value of blink duration is the most sensitive in the tunnel environment.In addition,a significant correlation exists between the driving duration index and driving fatigue,which can provide a reference for improving the tunnel safety.Using the mean value of blink duration and driving duration as the characteristic indexes,the accuracy of the driving fatigue detection model based on the XGBoost algorithm reaches 98%.The cumulative and continuous tunnel proportion effectively estimates the driving fatigue state in a long tunnel(group)environment.
基金supported by the National Natural Science Foundation of China(Grant Nos.52079102,52279108)the Major Science and Technology Projects of Sanya Yazhou Bay Science and Technology City Administration,China(Grant No.SKJC-KJ-2019KY02).
文摘The spatial distribution of underground tunnels is significant to the stress redistribution in the surrounding rock masses and blast wave propagation.The field blasting tests were first carried out to study the propagation of blast-induced seismic waves through under-ground tunnels of the Xiluodu Hydropower Station in China.The results show that the peak horizontal particle vibration velocity can be used as a safety criterion for underground tunnels.The effects of in situ stresses and spatial distributions of the tunnel group on the vibra-tion velocities distribution is afterward investigated by numerical simulation.The results show that there is a significant amplification of the blasting vibrations in the adjacent tunnels,which depends on their vertical positions during the excavation of a tunnel.The peak vibration velocity decreases as the lateral separation between tunnels increases.When the separation between the tunnels exceeds the width of three tunnels,the impact of the blast waves on each part of the adjacent tunnel tends to be stable on the whole.In terms of the size of the tunnel,the blasting vibration velocity in the upper part of the straight wall on the front-blast side increases as the width increases(and then levels off),while the blasting vibration velocity in the lower part decreases as the width increases(and then levels off).Finally,a generalized formula of blasting vibration velocity considering the spatial distribution is established,which can well predict the vibration velocity of particles in underground tunnels.
基金supported by the National Natural Science Foundation of China(Grant Nos.42141010,51879184 and 12172253).
文摘Engineering disasters(e.g.rock slabbing and rockburst)of the tunnel groups induced by the transient excavation of an adjacent tunnel threaten the stability of the existing tunnel,especially for those excavated by using the drill and blast tunneling(D&B).However,the dynamic response and failure mechanism of surrounding rocks of the existing tunnel caused by adjacent transient excavation are not clear due to the difficulty in conducting field tests and laboratory experiments.Therefore,a novel transient unloading experimental system for deep tunnel excavation was proposed in this study.The real stress path and the unloading rate can be reproduced by using this proposed system.The experiments were conducted for observing the dynamic response of the existing tunnel induced by adjacent transient excavation under different lateral pressure coefficients l(?0.4,0.6,0.8,1,1.2,1.4,1.6,1.8)with a polymethyl methacrylate(PMMA)specimen.The propagation of the impact wave and unloading surface wave was detected through the digital image correlation(DIC)analysis.The reflection of the unloading surface wave on the incident side of the existing tunnel(tunnel-E)was observed and analyzed.Moreover,the dynamic characteristics of the stress redistribution,the particle displacement and vibration velocity of surrounding rocks of tunnel-E were analyzed and summarized.In addition,the Mohr-Coulomb(MeC)failure criterion with tension cut-off was adopted to evaluate the stability of the existing tunnel under adjacent transient excavation.The results indicate that the incident side of the existing tunnel under the dynamic disturbance of transient excavation of an adjacent tunnel was more prone to fail,followed by the shadow side and the top/bottom side.