The project of Xiaoxihu Yellow River Bridge in Lanzhou is chosen as partial cable-stayed bridge. To get the shear lag effect and anti-earthquake performance of the actual bridge under various loading conditions, organ...The project of Xiaoxihu Yellow River Bridge in Lanzhou is chosen as partial cable-stayed bridge. To get the shear lag effect and anti-earthquake performance of the actual bridge under various loading conditions, organic glass scaled model was adopted to have an experiment and a theory research at one time. The experiment result is the basically same as the theory calculation which proves the FEA method can well calculate shear lag effect and dynamical performance. As a result, because the bridge is located in a seismic area of 8 degree, an elasto-plastic seismic checking is performed by customized FEA program in this paper.展开更多
In order to determine the reasonable completed dead load state in earth-anchored cable-stayed bridges,a practical method is proposed. The method is based on the rigidly supported continuous beam method and the feasibl...In order to determine the reasonable completed dead load state in earth-anchored cable-stayed bridges,a practical method is proposed. The method is based on the rigidly supported continuous beam method and the feasible zone method,emphasizing on the mutual effect between the self-anchored structural parts and the earth-anchored ones. Three cable-stayed bridge models are designed with the main spans of 1 400 m,including a partially earth-anchored cable-stayed bridge,a cable-stayed-suspension bridge and a fully selfanchored cable-stayed bridge,in which the C50 concrete and Q345 steel are adopted. The partially earthanchored cable-stayed bridge and the cable-stayed-suspension bridge secure lower compressive force in the girder than the fully self-anchored cable-stayed bridge by 25 percent at least. The same is for the material consumption of the whole bridge. Furthermore,the anchor volume is more than 20% lower in the partially earthanchored cable-stayed bridge than that in the cable-stayed-suspension bridge. Consequently,the practical span of cable-stayed bridges can be accordingly extended.展开更多
Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge de...Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge.展开更多
The preliminary design and parametric study of 1400 m partially earth-anchored cable-stayed bridge are described. Static per-formance of this new type of bridge is discussed. Compared with fully self-anchored cable-st...The preliminary design and parametric study of 1400 m partially earth-anchored cable-stayed bridge are described. Static per-formance of this new type of bridge is discussed. Compared with fully self-anchored cable-stayed bridge, its advantages in fin-ished state are summarized. Based on numerical calculation, effects of several structural parameters on static performance are presented.展开更多
The Dongshuimen Bridge over the Yangtze River and the Qiansimen Bridge over the Jialing River in Chongqing,China are located at the tip of the Yuzhong Peninsula.Together,they are called the Twin River Bridges.Both are...The Dongshuimen Bridge over the Yangtze River and the Qiansimen Bridge over the Jialing River in Chongqing,China are located at the tip of the Yuzhong Peninsula.Together,they are called the Twin River Bridges.Both are double deck structures carrying four lanes of traffic on their upper decks and two transit tracks on their lower decks.The girders are steel truss structures with orthotropic plates and the towers are made of concrete.Aesthetics were carefully considered for the design of these bridges because of their visibility in the city and their neighboring landmarks.展开更多
文摘The project of Xiaoxihu Yellow River Bridge in Lanzhou is chosen as partial cable-stayed bridge. To get the shear lag effect and anti-earthquake performance of the actual bridge under various loading conditions, organic glass scaled model was adopted to have an experiment and a theory research at one time. The experiment result is the basically same as the theory calculation which proves the FEA method can well calculate shear lag effect and dynamical performance. As a result, because the bridge is located in a seismic area of 8 degree, an elasto-plastic seismic checking is performed by customized FEA program in this paper.
基金Sponsored by the National Basic Research Program of China(Grant No.2013CB036303)the National Natural Science Foundation of China(Grant No.51008223)
文摘In order to determine the reasonable completed dead load state in earth-anchored cable-stayed bridges,a practical method is proposed. The method is based on the rigidly supported continuous beam method and the feasible zone method,emphasizing on the mutual effect between the self-anchored structural parts and the earth-anchored ones. Three cable-stayed bridge models are designed with the main spans of 1 400 m,including a partially earth-anchored cable-stayed bridge,a cable-stayed-suspension bridge and a fully selfanchored cable-stayed bridge,in which the C50 concrete and Q345 steel are adopted. The partially earthanchored cable-stayed bridge and the cable-stayed-suspension bridge secure lower compressive force in the girder than the fully self-anchored cable-stayed bridge by 25 percent at least. The same is for the material consumption of the whole bridge. Furthermore,the anchor volume is more than 20% lower in the partially earthanchored cable-stayed bridge than that in the cable-stayed-suspension bridge. Consequently,the practical span of cable-stayed bridges can be accordingly extended.
文摘Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge.
基金supported by the National Hi-Tech Research and Develop-ment Program of China ("863" Project) (Grant No. 2006AA11Z120)
文摘The preliminary design and parametric study of 1400 m partially earth-anchored cable-stayed bridge are described. Static per-formance of this new type of bridge is discussed. Compared with fully self-anchored cable-stayed bridge, its advantages in fin-ished state are summarized. Based on numerical calculation, effects of several structural parameters on static performance are presented.
文摘The Dongshuimen Bridge over the Yangtze River and the Qiansimen Bridge over the Jialing River in Chongqing,China are located at the tip of the Yuzhong Peninsula.Together,they are called the Twin River Bridges.Both are double deck structures carrying four lanes of traffic on their upper decks and two transit tracks on their lower decks.The girders are steel truss structures with orthotropic plates and the towers are made of concrete.Aesthetics were carefully considered for the design of these bridges because of their visibility in the city and their neighboring landmarks.