Experimental Study on Shear Lag Effect of Partial Cable-Stayed Bridge and Elasto-Plastic Seismic Analysis
1
作者 吴高峰 徐鸿 陈兴冲 《Journal of Shanghai Jiaotong university(Science)》 EI 2005年第2期170-174,共5页
The project of Xiaoxihu Yellow River Bridge in Lanzhou is chosen as partial cable-stayed bridge. To get the shear lag effect and anti-earthquake performance of the actual bridge under various loading conditions, organ... The project of Xiaoxihu Yellow River Bridge in Lanzhou is chosen as partial cable-stayed bridge. To get the shear lag effect and anti-earthquake performance of the actual bridge under various loading conditions, organic glass scaled model was adopted to have an experiment and a theory research at one time. The experiment result is the basically same as the theory calculation which proves the FEA method can well calculate shear lag effect and dynamical performance. As a result, because the bridge is located in a seismic area of 8 degree, an elasto-plastic seismic checking is performed by customized FEA program in this paper. 展开更多
关键词 partial cable-stayed bridge EXPERIMENT shear lag effect elasto-plastic seismic analysis
在线阅读 下载PDF
Optimization of Dead Load State in Earth-Anchored Cable-Stayed Bridges 被引量:5
2
作者 Bin Sun Rucheng Xiao 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2015年第3期87-94,共8页
In order to determine the reasonable completed dead load state in earth-anchored cable-stayed bridges,a practical method is proposed. The method is based on the rigidly supported continuous beam method and the feasibl... In order to determine the reasonable completed dead load state in earth-anchored cable-stayed bridges,a practical method is proposed. The method is based on the rigidly supported continuous beam method and the feasible zone method,emphasizing on the mutual effect between the self-anchored structural parts and the earth-anchored ones. Three cable-stayed bridge models are designed with the main spans of 1 400 m,including a partially earth-anchored cable-stayed bridge,a cable-stayed-suspension bridge and a fully selfanchored cable-stayed bridge,in which the C50 concrete and Q345 steel are adopted. The partially earthanchored cable-stayed bridge and the cable-stayed-suspension bridge secure lower compressive force in the girder than the fully self-anchored cable-stayed bridge by 25 percent at least. The same is for the material consumption of the whole bridge. Furthermore,the anchor volume is more than 20% lower in the partially earthanchored cable-stayed bridge than that in the cable-stayed-suspension bridge. Consequently,the practical span of cable-stayed bridges can be accordingly extended. 展开更多
关键词 cable-stayed bridge partially earth-anchored cable-stayed bridge cable-stayed-suspension bridge REASONABLE completed dead load STATE
在线阅读 下载PDF
Key Technologies for Design of Changqing Yellow River Super-long Bridge of Zhengzhou Ji'nan HSR
3
作者 ZUO Jiaqiang ZHANG Shang +3 位作者 MA Chenlong WANG Zongfeng ZHANG Hai ZHENG Mingda(Translated) 《Chinese Railways》 2023年第2期3-11,共9页
Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge de... Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge. 展开更多
关键词 Zhengzhou-Ji'nan HSR Changqing Yellow River Super-long bridge partial cable stayed bridge multi-tower cable-stayed bridge multiple span and long connection bridge design
原文传递
Preliminary design and parametric study of 1400 m partially earth-anchored cable-stayed bridge 被引量:19
4
作者 SUN Bin, CHENG Jin & XIAO RuCheng Department of Bridge Engineering, Tongji University, Shanghai 200092, China 《Science China(Technological Sciences)》 SCIE EI CAS 2010年第2期502-511,共10页
The preliminary design and parametric study of 1400 m partially earth-anchored cable-stayed bridge are described. Static per-formance of this new type of bridge is discussed. Compared with fully self-anchored cable-st... The preliminary design and parametric study of 1400 m partially earth-anchored cable-stayed bridge are described. Static per-formance of this new type of bridge is discussed. Compared with fully self-anchored cable-stayed bridge, its advantages in fin-ished state are summarized. Based on numerical calculation, effects of several structural parameters on static performance are presented. 展开更多
关键词 partialLY earth-anchored cable-stayed bridge preliminary design PARAMETRIC study
原文传递
Design concept of the Twin River Bridges in Chongqing,China
5
作者 Man-Chung TANG 《Frontiers of Structural and Civil Engineering》 SCIE EI 2011年第4期427-431,共5页
The Dongshuimen Bridge over the Yangtze River and the Qiansimen Bridge over the Jialing River in Chongqing,China are located at the tip of the Yuzhong Peninsula.Together,they are called the Twin River Bridges.Both are... The Dongshuimen Bridge over the Yangtze River and the Qiansimen Bridge over the Jialing River in Chongqing,China are located at the tip of the Yuzhong Peninsula.Together,they are called the Twin River Bridges.Both are double deck structures carrying four lanes of traffic on their upper decks and two transit tracks on their lower decks.The girders are steel truss structures with orthotropic plates and the towers are made of concrete.Aesthetics were carefully considered for the design of these bridges because of their visibility in the city and their neighboring landmarks. 展开更多
关键词 long span bridges partially cable-supported girder bridge cable-stayed bridge extradosed steel truss bridge aesthetics CHONGQING China