期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Scheduling a three-machine no-wait flowshop with separated setup time 被引量:1
1
作者 常俊林 邵惠鹤 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2006年第2期206-210,共5页
In many practical flowshop production environments, there is no intermediate storage space available to keep partially completed jobs between any two machines. The workflow has to be continuous, implying that the no-w... In many practical flowshop production environments, there is no intermediate storage space available to keep partially completed jobs between any two machines. The workflow has to be continuous, implying that the no-wait conditions must be abided, which is typical in steel and plastic production. We discuss the three-machine no-wait flowshop scheduling problem where the setup times are considered as separated from processing times and sequence independent. The scheduling goal is to minimize the total flowtime. An optimal property and two heuristic algorithms for this problem are proposed. Evaluated over a large number of problems, the proposed heuristics are found that they can yield good solutions effectively with low computational complexity, and have more obvious advantage for the large size problem compared with the existing one. 展开更多
关键词 three-machine flowshop setup time NO-WAIT total flow time
在线阅读 下载PDF
Key technologies and engineering practices for soft-rock protective seam mining 被引量:9
2
作者 Xiang Cheng Guangming Zhao +2 位作者 Yingming Li Xiangrui Meng Qingyi Tu 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2020年第6期889-899,共11页
Severe gas disasters in deep mining areas are increasing,and traditional protective coal seam mining is facing significant challenges.This paper proposes an innovative technology using soft rock as the protective seam... Severe gas disasters in deep mining areas are increasing,and traditional protective coal seam mining is facing significant challenges.This paper proposes an innovative technology using soft rock as the protective seam in the absence of an appropriate coal seam.Based on the geological engineering conditions of the new horizontal first mining area of Luling Coal Mine in Huaibei,China,the impacts of different mining parameters of the soft-rock protective seam on the pressure-relief effect of the protected coal seam were analyzed through numerical simulation.The unit stress of the protected coal seam,which was less than half of the primary rock stress,was used as the mining stress pressure-relief index.The optimized interlayer space was found to be 59 m for the first soft-rock working face,with a 2 m mining thickness and 105 m face length.The physicochemical characteristics of the orebody were analyzed,and a device selection framework for the soft-rock protective seam was developed.Optimal equipment for the working face was selected,including the fully-mechanized hydraulic support and coal cutter.A production technology that combined fully-mechanized and blasting-assisted soft-rock mining was developed.Engineering practices demonstrated that normal circulation operation can be achieved on the working face of the soft-rock protective seam,with an average advancement rate of 1.64 m/d.The maximum residual gas pressure and content,which were measured at the cut hole position of the protected coal seams(Nos.8 and 9),decreased to 0.35 MPa and 4.87 m^3/t,respectively.The results suggested that soft-rock protective seam mining can produce a significant gas-control effect. 展开更多
关键词 Gas outburst hazard Soft-rock protective seam Pressure-relief three-machine optimization Blasting-assisted mining Gas extraction
在线阅读 下载PDF
A HEURISTIC FOR F3/bi= b/C_(max) AND ITSWORST-CASE ANALYSIS
3
作者 HOU Sixiang (China Marine Development and Research Cented Box 1303-17, Beijing 100073, China) DU Donglei (Institute of Applied Mathematics, Academia Sinica, Beijing 100080, China) 《Systems Science and Mathematical Sciences》 SCIE EI CSCD 1997年第2期141-151,共11页
This paper describes a heuristic for solving F3/bi = b/Cmax scheduling problem. This algorithm first uses the Johnson’s algorithm solving F2Cmax, then, presents revised algorithm to solve F3/bi = b/Cmax. Lastly, an O... This paper describes a heuristic for solving F3/bi = b/Cmax scheduling problem. This algorithm first uses the Johnson’s algorithm solving F2Cmax, then, presents revised algorithm to solve F3/bi = b/Cmax. Lastly, an O(n log n) time heuristic is presented which generates a schedule with length at most 3/2 times that of an optimal schedule, for even number n 4, and 3/2 + 1/(2n) times that of an optimal schedule, for odd number n 4. These bounds are tight. 展开更多
关键词 Two-machine FLOW SHOP three-machine FLOW SHOP worst-case analysis automated manufacturing system heuristic.
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部