To fully leverage the advantages of mechanization and informatization in tunnel boring machine(TBM)operations,the authors aim to promote the advancement of tunnel construction technology toward intelligent development...To fully leverage the advantages of mechanization and informatization in tunnel boring machine(TBM)operations,the authors aim to promote the advancement of tunnel construction technology toward intelligent development.This involved exploring the deep integration of next-generation artificial intelligence technologies,such as sensing technology,automatic control technology,big data technology,deep learning,and machine vision,with key operational processes,including TBM excavation,direction adjustment,step changes,inverted arch block assembly,material transportation,and operation status assurance.The results of this integration are summarized as follows.(1)TBM key excavation parameter prediction algorithm was developed with an accuracy rate exceeding 90%.The TBM intelligent step-change control algorithm,based on machine vision,achieved an image segmentation accuracy rate of 95%and gripper shoe positioning error of±5 mm.(2)An automatic positioning system for inverted arch blocks was developed,enabling real-time perception of the spatial position and deviation during the assembly process.The system maintains an elevation positioning deviation within±3 mm and a horizontal positioning deviation within±10 mm,reducing the number of surveyors in each work team.(3)A TBM intelligent rail transportation system that achieves real-time human-machine positioning,automatic switch opening and closing,automatic obstacle avoidance,intelligent transportation planning,and integrated scheduling and command was designed.Each locomotive formation reduces one shunter and improves comprehensive transportation efficiency by more than 20%.(4)Intelligent analysis and prediction algorithms were developed to monitor and predict the trends of the hydraulic and gear oil parameters in real time,enhancing the proactive maintenance and system reliability.展开更多
The advent of parametric design has resulted in a marked increase in the complexity of building.Unfortunately,traditional construction methods make it difficult to meet the needs.Therefore,construction robots have bec...The advent of parametric design has resulted in a marked increase in the complexity of building.Unfortunately,traditional construction methods make it difficult to meet the needs.Therefore,construction robots have become a pivotal production tool in this context.Since the arm span of a single robot usually does not exceed 3 meters,it is not competent for producing large-scale building components.Accordingly,the extension of the robot,s working range is often achieved by external axes.Nevertheless,the coupling control of external axes and robots and their kinematic solution have become key challenges.The primary technical difficulties include customized construction robots,automatic solutions for external axes,fixed axis joints,and specific motion mode control.This paper proposes solutions to these difficulties,introduces the relevant basic concepts and algorithms in detail,and encapsulates these robotics principles and algorithm processes into the Grasshopper plug-in commonly used by architects to form the FURobot software platform.This platform effectively solves the above problems,lowers the threshold for architects,and improves production efficiency.The effectiveness of the algorithm and software in this paper is verified through simulation experiments.展开更多
Scientific and technological advancements are rapidly transforming underground engineering,shifting from labor-intensive,time-consuming methods to automated,real-time systems.This timely and comprehensive review cover...Scientific and technological advancements are rapidly transforming underground engineering,shifting from labor-intensive,time-consuming methods to automated,real-time systems.This timely and comprehensive review covers in-situ testing,intelligent monitoring,and geophysical testing methods,highlighting fundamental principles,testing apparatuses,data processing techniques,and engineering applications.The state-of-the-art summary emphasizes not only cutting-edge innovations for complex and harsh environments but also the transformative role of artificial intelligence and machine learning in data interpretations.The integration of big data and advanced algorithms is particularly impactful,enabling the identification,prediction,and mitigation of potential risks in underground projects.Key aspects of the discussion include detection capabilities,method integration,and data convergence of intelligent technologies to drive enhanced safety,operational efficiency,and predictive reliability.The review also examines future trends in intelligent technologies,emphasizing unified platforms that combine multiple methods,real-time data,and predictive analytics.These advancements are shaping the evolution of underground construction and maintenance,aiming for risk-free,high-efficiency underground engineering.展开更多
To understand the smoke level and NO_(x)emission characteristics of in-use construction machinery in Beijing,we selected 905 construction machines in Beijing from August 2022 to April 2023 to monitor the emission leve...To understand the smoke level and NO_(x)emission characteristics of in-use construction machinery in Beijing,we selected 905 construction machines in Beijing from August 2022 to April 2023 to monitor the emission level of smoke and NO_(x).The exhaust smoke level and excessive emission situation of different machinery types were identified,and their NO_(x)emission levels were monitored according to the free acceleration method.We investigated the correlation of NO_(x)and smoke emission,and proposed suggestions for controlling pollution discharge from construction machinery in the future.The results show that the exhaust smoke level was 0–2.62 m^(−1),followed a log-normal distribution(μ=-1.73,δ=1.09,R^(2)=0.99),with a 5.64%exceedance rate.Differenceswere observed amongmachinery types,with low-power engine forklifts showing higher smoke levels.The NO_(x)emission range was 71–1516 ppm,followed a normal distribution(μ=565.54,δ=309.51,R^(2)=0.83).Differences among machinery types were relatively small.Engine rated net power had the most significant impact on NO_(x)emissions.Thus,NO_(x)emissions from construction machinery need further attention.Furthermore,we found a weak negative correlation(p<0.05)between the emission level of smoke and NO_(x),that is the synergic emission reduction effect is poor,emphasizing the need for NO_(x)emission limits.In the future,the oversight in Beijing should prioritize phasing out ChinaⅠand ChinaⅡmachinery,and monitor emissions from highpower engine ChinaⅢmachinery.展开更多
Construction engineering and management(CEM)has become increasingly complicated with the increasing size of engineering projects under different construction environments,motivating the digital transformation of CEM.T...Construction engineering and management(CEM)has become increasingly complicated with the increasing size of engineering projects under different construction environments,motivating the digital transformation of CEM.To contribute to a better understanding of the state of the art of smart techniques for engineering projects,this paper provides a comprehensive review of multi-criteria decision-making(MCDM)techniques,intelligent techniques,and their applications in CEM.First,a comprehensive framework detailing smart technologies for construction projects is developed.Next,the characteristics of CEM are summarized.A bibliometric review is then conducted to investigate the keywords,journals,and clusters related to the application of smart techniques in CEM during 2000-2022.Recent advancements in intelligent techniques are also discussed under the following six topics:①big data technology;②computer vision;③speech recognition;④natural language processing;⑤machine learning;and⑥knowledge representation,understanding,and reasoning.The applications of smart techniques are then illustrated via underground space exploitation.Finally,future research directions for the sustainable development of smart construction are highlighted.展开更多
With the rapid development of globalization and information technology,intellectual property has been one of the key drivers of economic growth,and the construction of intellectual property system has become an import...With the rapid development of globalization and information technology,intellectual property has been one of the key drivers of economic growth,and the construction of intellectual property system has become an important criterion for measuring the quality of business environment.This article is intended to explore the current status of intellectual property system construction in China,the challenges,and its relationship with the business environment,to propose the corresponding countermeasures and suggestions.The study finds that the legal system of intellectual property in China is gradually improving,and judicial and administrative protection are continuously strengthened.However,the challenges still remain such as frequent infringements,rights hard to protect and insufficient international cooperation.These issues not only affect the legitimate rights and interests of innovation entities,but also for the market fairness and the level of the business environment.Therefore,this article proposes that strengthening the perfection of the intellectual property legal system,enhancing intellectual property services and support capabilities,strengthening international cooperation and exchanges,and accelerating the cultivation of composite talents.It aims to provide theoretical references for the construction of intellectual property system and the optimization of the business environment,promote the high-quality development of economy and enhance the global competitiveness of the country.展开更多
Construction work is an important component of social development,and its safety management is crucial for the protection of employees’lives,the efficient development of enterprises,and the social harmony and stabili...Construction work is an important component of social development,and its safety management is crucial for the protection of employees’lives,the efficient development of enterprises,and the social harmony and stability.Therefore,this paper explores the risk identification,risk estimation,risk evaluation,and control strategies of construction sites.It analyzes the research progress,current issues that need optimization,and future development directions,aiming to provide insights for the development of risk evaluation in construction sites.展开更多
Professional and trade skills are required for handling the construction related projects;Construction industries of the present day however lack useful information concerning different practices,patterns and trends i...Professional and trade skills are required for handling the construction related projects;Construction industries of the present day however lack useful information concerning different practices,patterns and trends involved in risk management.Considering this,the present study focuses on the aforementioned variables of risk management by quantitative analysis specifically in the domain of construction industry.This study has used IBM’s SPSS(Statistical Package for Social Sciences)version 25.0 to analyze the results.This study is an initiative to assess the impact of risk management in the construction sector of Jordan.It will assist the construction sector for exploring the limitations with respect to integrate effective risk management.A sense of competition will be developed through a comparison of risk factors of construction projects among the project stakeholders such as contractors should enhance their risk management practices.展开更多
The cost and strict input format requirements of GraphRAG make it less efficient for processing large documents. This paper proposes an alternative approach for constructing a knowledge graph (KG) from a PDF document ...The cost and strict input format requirements of GraphRAG make it less efficient for processing large documents. This paper proposes an alternative approach for constructing a knowledge graph (KG) from a PDF document with a focus on simplicity and cost-effectiveness. The process involves splitting the document into chunks, extracting concepts within each chunk using a large language model (LLM), and building relationships based on the proximity of concepts in the same chunk. Unlike traditional named entity recognition (NER), which identifies entities like “Shanghai”, the proposed method identifies concepts, such as “Convenient transportation in Shanghai” which is found to be more meaningful for KG construction. Each edge in the KG represents a relationship between concepts occurring in the same text chunk. The process is computationally inexpensive, leveraging locally set up tools like Mistral 7B openorca instruct and Ollama for model inference, ensuring the entire graph generation process is cost-free. A method of assigning weights to relationships, grouping similar pairs, and summarizing multiple relationships into a single edge with associated weight and relation details is introduced. Additionally, node degrees and communities are calculated for node sizing and coloring. This approach offers a scalable, cost-effective solution for generating meaningful knowledge graphs from large documents, achieving results comparable to GraphRAG while maintaining accessibility for personal machines.展开更多
Taking modern indoor building construction as an example,this study analyzes the path planning and navigation of a smart plastering robot.It includes a basic introduction to smart plastering robots,an analysis of mult...Taking modern indoor building construction as an example,this study analyzes the path planning and navigation of a smart plastering robot.It includes a basic introduction to smart plastering robots,an analysis of multi-sensor fusion localization algorithms for smart plastering robots,and an analysis of path planning and navigation functions for smart plastering robots.It is hoped that through this analysis,a reference is provided for the path planning and navigation design of such robots to meet their practical application needs.展开更多
In the process of cultural and tourism project construction,intelligent construction technology has gradually shown strong advantages.The effective application of this technology not only greatly improves the construc...In the process of cultural and tourism project construction,intelligent construction technology has gradually shown strong advantages.The effective application of this technology not only greatly improves the construction efficiency and quality of cultural and tourism projects,but also effectively controls construction costs,laying a solid foundation for the green,low-carbon,and sustainable development of the cultural and tourism industry.The article analyzes the current situation of cultural and tourism project construction,proposes the advantages of intelligent construction and its application in the construction mode of cultural and tourism projects,aiming to provide reliable guidance for the sustainable development of cultural and tourism projects.展开更多
The basement was located at the bottom of the building,which not only affected the quality of the whole construction project but also had special requirements for construction technology and construction requirements....The basement was located at the bottom of the building,which not only affected the quality of the whole construction project but also had special requirements for construction technology and construction requirements.In modern times,with the increasing height of the building,the pressure on the ground has grown,and the demands for basements in construction projects have also steadily increased.With the development of modern technology,various construction techniques for basements emerged within the construction industry.Thus,this paper analyses the type of basement floor construction technologies,highlighting the application of these methods,and points out critical issues to consider.By examining frequent basement leakage problems,the paper proposed several measures to improve the quality if basement construction,aiming to better protect the service life of the building and further improve overall quality,and offering valuable insights for future projects.展开更多
The increasing cost of infrastructure development risks stifling national investment plans.Many projects in Uganda have suffered because of the frequency and magnitude of claims made by parties involved especially the...The increasing cost of infrastructure development risks stifling national investment plans.Many projects in Uganda have suffered because of the frequency and magnitude of claims made by parties involved especially the contractors.As a result,the construction industry is plagued with claims which quite often lead to adversarial relationships.The major grounds for claims were identified through studying the contract documents where claims had been made.Increase in scope;change orders;errors in contract documents;inclement weather;inflation;delay in possessing the site;and change in the tax policy were the most prevalent grounds for making claims.Problems identified in claiming process include delays in getting approval;information on claims not reliable;hostility from the parties involved;pricing of claims;delays in effecting payment when approved;and overzealous contract interpretation leading to misunderstanding and delays Using a survey on project managers for 64 contractors and their corresponding clients or their representatives,the major ways in which it can be reduced were identified as being thoroughness during the design phase;providing for inflation;proper planning of works;using prequalified contractors;and proper documentation of records.Clients have a big role to play in reducing claims.展开更多
Road construction plays a vital role in the social and economic development of developing countries.However,it is often constrained by financial limitations,maintenance challenges,and environmental concerns.Building I...Road construction plays a vital role in the social and economic development of developing countries.However,it is often constrained by financial limitations,maintenance challenges,and environmental concerns.Building Information Modelling(BIM)presents a transformative opportunity to improve road construction efficiency,cost-effectiveness,and sustainability by enabling digital collaboration,lifecycle management,and data-driven decision making.This paper examines the current state of BIM application in the road construction sector of developing countries,focusing on lifecycle integration,economic and operational benefits,and key barriers to adoption.Findings indicate that BIM can enhance project outcomes in whole project life.However,challenges such as high initial costs,lack of skilled personnel,and insufficient policy support hinder widespread adoption.Moreover,the underutilization of BIM in the operational phase leads to unsatisfied returns on investment.The study highlights the critical role of government policies in driving BIM implementation,particularly in public-sector road projects.Recommendations include fostering BIM standards,investing in workforce training,and developing localized BIM solutions to maximize long-term benefits for developing nations.展开更多
Road construction plays a vital role in the social and economic development of developing countries.However,it is often constrained by financial limitations,maintenance challenges,and environmental concerns.Building I...Road construction plays a vital role in the social and economic development of developing countries.However,it is often constrained by financial limitations,maintenance challenges,and environmental concerns.Building Information Modelling(BIM)presents a transformative opportunity to improve road construction efficiency,cost-effectiveness,and sustainability by enabling digital collaboration,lifecycle management,and data-driven decision-making.This paper examines the current state of BIM application in the road construction sector of developing countries,focusing on lifecycle integration,economic and operational benefits,and key barriers to adoption.Findings indicate that BIM can enhance project outcomes in whole project life.However,challenges such as high initial costs,lack of skilled personnel,and insufficient policy support hinder widespread adoption.Moreover,the underutilization of BIM in the operational phase leads to unsatisfied returns on investment.The study highlights the critical role of government policies in driving BIM implementation,particularly in public-sector road projects.Recommendations include fostering BIM standards,investing in workforce training,and developing localized BIM solutions to maximize long-term benefits for developing nations.展开更多
Zeolite-loaded noble metal catalysts have demonstrated excellent performance in addressing cold-start automotive exhaust NOx emissions and catalytic oxidation of VOCs applications.Pd and Pt are the most commonly used ...Zeolite-loaded noble metal catalysts have demonstrated excellent performance in addressing cold-start automotive exhaust NOx emissions and catalytic oxidation of VOCs applications.Pd and Pt are the most commonly used active metals in PNA and VOC catalysts,respectively.However,despite the same metal/zeolite composition,the efficient active sites for PNA and VOC catalysts have been viewed as mainly Pd^(2+) and Pt^(0),respectively,both of which are different from each other.As a result,various methods need to be applied to dope Pd and Pt in zeolitic support respectively for different usages.No matter which type of metal species is needed,the common requirement for both PNA and VOC catalysts is that the metal species should be highly dispersed in zeolite support and stay stable.The purpose of this paper is to review the progress of synthetic means of zeolite-coated noble metals(Pd,Pt,etc.)as effective PNA or VOC catalysts.To give a better understanding of the relationship between efficient metal species and the introduced methods,the species that contributed to the NOx adsorption(PNA)and VOCs deep catalytic oxidation were first summarized and compared.Then,based on the above discussion,the detailed construction strategies for different active sites in PNA and VOC catalysts,respectively,were elaborated in terms of synthetic routes,precursor selection,and zeolite carrier requirements.It is hoped that this will contribute to a better understanding of noble metal adsorption/catalysis in zeolites and provide promising strategies for the design of adsorption/catalysts with high activity,selectivity and stability.展开更多
This study examines the “V + Dào” construction as a state change event through the lens of the Event Integration Hypothesis. It focuses on how these constructions represent state changes, exploring distinctions...This study examines the “V + Dào” construction as a state change event through the lens of the Event Integration Hypothesis. It focuses on how these constructions represent state changes, exploring distinctions between “change” and “stasis”. Using a corpus-based approach, the analysis covers the semantic and syntactic features of “V + Dào” constructions and their event integration patterns. The findings highlight the distribution of agency, animacy, and support relations in state change events, emphasizing the complex interaction of internal and external event integrations and their correlation with the conceptual primitives of change and transition. This study offers insights into the lexicalization and grammaticalization processes of the “V + Dào” construction, and potentially the broader verb-complement constructions in Mandarin.展开更多
This paper introduces the relevant content of construction quality inspection standards for office buildings,including their differences and special requirements of general buildings.It elaborates on the application o...This paper introduces the relevant content of construction quality inspection standards for office buildings,including their differences and special requirements of general buildings.It elaborates on the application of BIM technology and the PDCA cycle model in each stage of construction,emphasizes the importance of technical management system construction,and also discusses the influence and optimization path of prefabricated buildings and LEED certification on the standards.展开更多
This paper explores the collaborative management model of construction technology and plant beautification strategies in landscape architecture site management.It analyzes the key aspects of construction technology an...This paper explores the collaborative management model of construction technology and plant beautification strategies in landscape architecture site management.It analyzes the key aspects of construction technology and the implementation points of plant beautification strategies,constructs a synergy mechanism between technology and strategy,and proposes a dynamic adjustment and multi-professional collaboration model.The effectiveness of this model is verified through practical case studies,providing theoretical support and practical references for the refined construction of landscape architecture.展开更多
文摘To fully leverage the advantages of mechanization and informatization in tunnel boring machine(TBM)operations,the authors aim to promote the advancement of tunnel construction technology toward intelligent development.This involved exploring the deep integration of next-generation artificial intelligence technologies,such as sensing technology,automatic control technology,big data technology,deep learning,and machine vision,with key operational processes,including TBM excavation,direction adjustment,step changes,inverted arch block assembly,material transportation,and operation status assurance.The results of this integration are summarized as follows.(1)TBM key excavation parameter prediction algorithm was developed with an accuracy rate exceeding 90%.The TBM intelligent step-change control algorithm,based on machine vision,achieved an image segmentation accuracy rate of 95%and gripper shoe positioning error of±5 mm.(2)An automatic positioning system for inverted arch blocks was developed,enabling real-time perception of the spatial position and deviation during the assembly process.The system maintains an elevation positioning deviation within±3 mm and a horizontal positioning deviation within±10 mm,reducing the number of surveyors in each work team.(3)A TBM intelligent rail transportation system that achieves real-time human-machine positioning,automatic switch opening and closing,automatic obstacle avoidance,intelligent transportation planning,and integrated scheduling and command was designed.Each locomotive formation reduces one shunter and improves comprehensive transportation efficiency by more than 20%.(4)Intelligent analysis and prediction algorithms were developed to monitor and predict the trends of the hydraulic and gear oil parameters in real time,enhancing the proactive maintenance and system reliability.
基金National Key R&D Program of China(Nos.2023YFC3806900,2022YFE0141400)。
文摘The advent of parametric design has resulted in a marked increase in the complexity of building.Unfortunately,traditional construction methods make it difficult to meet the needs.Therefore,construction robots have become a pivotal production tool in this context.Since the arm span of a single robot usually does not exceed 3 meters,it is not competent for producing large-scale building components.Accordingly,the extension of the robot,s working range is often achieved by external axes.Nevertheless,the coupling control of external axes and robots and their kinematic solution have become key challenges.The primary technical difficulties include customized construction robots,automatic solutions for external axes,fixed axis joints,and specific motion mode control.This paper proposes solutions to these difficulties,introduces the relevant basic concepts and algorithms in detail,and encapsulates these robotics principles and algorithm processes into the Grasshopper plug-in commonly used by architects to form the FURobot software platform.This platform effectively solves the above problems,lowers the threshold for architects,and improves production efficiency.The effectiveness of the algorithm and software in this paper is verified through simulation experiments.
基金supported by Ministry of Education of Singapore,under Academic Research Fund Tier 1(Grant Number RG143/23).
文摘Scientific and technological advancements are rapidly transforming underground engineering,shifting from labor-intensive,time-consuming methods to automated,real-time systems.This timely and comprehensive review covers in-situ testing,intelligent monitoring,and geophysical testing methods,highlighting fundamental principles,testing apparatuses,data processing techniques,and engineering applications.The state-of-the-art summary emphasizes not only cutting-edge innovations for complex and harsh environments but also the transformative role of artificial intelligence and machine learning in data interpretations.The integration of big data and advanced algorithms is particularly impactful,enabling the identification,prediction,and mitigation of potential risks in underground projects.Key aspects of the discussion include detection capabilities,method integration,and data convergence of intelligent technologies to drive enhanced safety,operational efficiency,and predictive reliability.The review also examines future trends in intelligent technologies,emphasizing unified platforms that combine multiple methods,real-time data,and predictive analytics.These advancements are shaping the evolution of underground construction and maintenance,aiming for risk-free,high-efficiency underground engineering.
基金supported by the Energy Foundation(No.G-2203-33693).
文摘To understand the smoke level and NO_(x)emission characteristics of in-use construction machinery in Beijing,we selected 905 construction machines in Beijing from August 2022 to April 2023 to monitor the emission level of smoke and NO_(x).The exhaust smoke level and excessive emission situation of different machinery types were identified,and their NO_(x)emission levels were monitored according to the free acceleration method.We investigated the correlation of NO_(x)and smoke emission,and proposed suggestions for controlling pollution discharge from construction machinery in the future.The results show that the exhaust smoke level was 0–2.62 m^(−1),followed a log-normal distribution(μ=-1.73,δ=1.09,R^(2)=0.99),with a 5.64%exceedance rate.Differenceswere observed amongmachinery types,with low-power engine forklifts showing higher smoke levels.The NO_(x)emission range was 71–1516 ppm,followed a normal distribution(μ=565.54,δ=309.51,R^(2)=0.83).Differences among machinery types were relatively small.Engine rated net power had the most significant impact on NO_(x)emissions.Thus,NO_(x)emissions from construction machinery need further attention.Furthermore,we found a weak negative correlation(p<0.05)between the emission level of smoke and NO_(x),that is the synergic emission reduction effect is poor,emphasizing the need for NO_(x)emission limits.In the future,the oversight in Beijing should prioritize phasing out ChinaⅠand ChinaⅡmachinery,and monitor emissions from highpower engine ChinaⅢmachinery.
基金funded by the project of Guangdong Provincial Basic and Applied Basic Research Fund Committee(2022A1515240073)the Pearl River Talent Recruitment Program(2019CX01G338),Guangdong Province.
文摘Construction engineering and management(CEM)has become increasingly complicated with the increasing size of engineering projects under different construction environments,motivating the digital transformation of CEM.To contribute to a better understanding of the state of the art of smart techniques for engineering projects,this paper provides a comprehensive review of multi-criteria decision-making(MCDM)techniques,intelligent techniques,and their applications in CEM.First,a comprehensive framework detailing smart technologies for construction projects is developed.Next,the characteristics of CEM are summarized.A bibliometric review is then conducted to investigate the keywords,journals,and clusters related to the application of smart techniques in CEM during 2000-2022.Recent advancements in intelligent techniques are also discussed under the following six topics:①big data technology;②computer vision;③speech recognition;④natural language processing;⑤machine learning;and⑥knowledge representation,understanding,and reasoning.The applications of smart techniques are then illustrated via underground space exploitation.Finally,future research directions for the sustainable development of smart construction are highlighted.
基金Guizhou Provincial University Humanities and Social Sciences Research Project in 2024"Enhancing the Development of New Productive Forces through University Technological Innovation and Intellectual Property Management"(2024RW256)Guizhou University of Commerce Research Project in 2022"Study on the Ideas and Pathways to Drive Agricultural Powerhouse through Digital Economy"(2022XJZX315)。
文摘With the rapid development of globalization and information technology,intellectual property has been one of the key drivers of economic growth,and the construction of intellectual property system has become an important criterion for measuring the quality of business environment.This article is intended to explore the current status of intellectual property system construction in China,the challenges,and its relationship with the business environment,to propose the corresponding countermeasures and suggestions.The study finds that the legal system of intellectual property in China is gradually improving,and judicial and administrative protection are continuously strengthened.However,the challenges still remain such as frequent infringements,rights hard to protect and insufficient international cooperation.These issues not only affect the legitimate rights and interests of innovation entities,but also for the market fairness and the level of the business environment.Therefore,this article proposes that strengthening the perfection of the intellectual property legal system,enhancing intellectual property services and support capabilities,strengthening international cooperation and exchanges,and accelerating the cultivation of composite talents.It aims to provide theoretical references for the construction of intellectual property system and the optimization of the business environment,promote the high-quality development of economy and enhance the global competitiveness of the country.
文摘Construction work is an important component of social development,and its safety management is crucial for the protection of employees’lives,the efficient development of enterprises,and the social harmony and stability.Therefore,this paper explores the risk identification,risk estimation,risk evaluation,and control strategies of construction sites.It analyzes the research progress,current issues that need optimization,and future development directions,aiming to provide insights for the development of risk evaluation in construction sites.
文摘Professional and trade skills are required for handling the construction related projects;Construction industries of the present day however lack useful information concerning different practices,patterns and trends involved in risk management.Considering this,the present study focuses on the aforementioned variables of risk management by quantitative analysis specifically in the domain of construction industry.This study has used IBM’s SPSS(Statistical Package for Social Sciences)version 25.0 to analyze the results.This study is an initiative to assess the impact of risk management in the construction sector of Jordan.It will assist the construction sector for exploring the limitations with respect to integrate effective risk management.A sense of competition will be developed through a comparison of risk factors of construction projects among the project stakeholders such as contractors should enhance their risk management practices.
文摘The cost and strict input format requirements of GraphRAG make it less efficient for processing large documents. This paper proposes an alternative approach for constructing a knowledge graph (KG) from a PDF document with a focus on simplicity and cost-effectiveness. The process involves splitting the document into chunks, extracting concepts within each chunk using a large language model (LLM), and building relationships based on the proximity of concepts in the same chunk. Unlike traditional named entity recognition (NER), which identifies entities like “Shanghai”, the proposed method identifies concepts, such as “Convenient transportation in Shanghai” which is found to be more meaningful for KG construction. Each edge in the KG represents a relationship between concepts occurring in the same text chunk. The process is computationally inexpensive, leveraging locally set up tools like Mistral 7B openorca instruct and Ollama for model inference, ensuring the entire graph generation process is cost-free. A method of assigning weights to relationships, grouping similar pairs, and summarizing multiple relationships into a single edge with associated weight and relation details is introduced. Additionally, node degrees and communities are calculated for node sizing and coloring. This approach offers a scalable, cost-effective solution for generating meaningful knowledge graphs from large documents, achieving results comparable to GraphRAG while maintaining accessibility for personal machines.
基金Science and Technology Research Project of Chongqing Education Commission(Project No.:KJQN202401902)Chongqing Construction Science and Technology Plan Project(Project No.:Chinese Society For Urban Studies,2024:3-24)+1 种基金cientific Research Fund Project of Chongqing Institute of Engineering(Project No.:2022gcky01)College Student Innovation and Entrepreneurship Training Program Project of Chongqing Institute of Engineering(Project No.:CXCY2024018)。
文摘Taking modern indoor building construction as an example,this study analyzes the path planning and navigation of a smart plastering robot.It includes a basic introduction to smart plastering robots,an analysis of multi-sensor fusion localization algorithms for smart plastering robots,and an analysis of path planning and navigation functions for smart plastering robots.It is hoped that through this analysis,a reference is provided for the path planning and navigation design of such robots to meet their practical application needs.
文摘In the process of cultural and tourism project construction,intelligent construction technology has gradually shown strong advantages.The effective application of this technology not only greatly improves the construction efficiency and quality of cultural and tourism projects,but also effectively controls construction costs,laying a solid foundation for the green,low-carbon,and sustainable development of the cultural and tourism industry.The article analyzes the current situation of cultural and tourism project construction,proposes the advantages of intelligent construction and its application in the construction mode of cultural and tourism projects,aiming to provide reliable guidance for the sustainable development of cultural and tourism projects.
文摘The basement was located at the bottom of the building,which not only affected the quality of the whole construction project but also had special requirements for construction technology and construction requirements.In modern times,with the increasing height of the building,the pressure on the ground has grown,and the demands for basements in construction projects have also steadily increased.With the development of modern technology,various construction techniques for basements emerged within the construction industry.Thus,this paper analyses the type of basement floor construction technologies,highlighting the application of these methods,and points out critical issues to consider.By examining frequent basement leakage problems,the paper proposed several measures to improve the quality if basement construction,aiming to better protect the service life of the building and further improve overall quality,and offering valuable insights for future projects.
文摘The increasing cost of infrastructure development risks stifling national investment plans.Many projects in Uganda have suffered because of the frequency and magnitude of claims made by parties involved especially the contractors.As a result,the construction industry is plagued with claims which quite often lead to adversarial relationships.The major grounds for claims were identified through studying the contract documents where claims had been made.Increase in scope;change orders;errors in contract documents;inclement weather;inflation;delay in possessing the site;and change in the tax policy were the most prevalent grounds for making claims.Problems identified in claiming process include delays in getting approval;information on claims not reliable;hostility from the parties involved;pricing of claims;delays in effecting payment when approved;and overzealous contract interpretation leading to misunderstanding and delays Using a survey on project managers for 64 contractors and their corresponding clients or their representatives,the major ways in which it can be reduced were identified as being thoroughness during the design phase;providing for inflation;proper planning of works;using prequalified contractors;and proper documentation of records.Clients have a big role to play in reducing claims.
文摘Road construction plays a vital role in the social and economic development of developing countries.However,it is often constrained by financial limitations,maintenance challenges,and environmental concerns.Building Information Modelling(BIM)presents a transformative opportunity to improve road construction efficiency,cost-effectiveness,and sustainability by enabling digital collaboration,lifecycle management,and data-driven decision making.This paper examines the current state of BIM application in the road construction sector of developing countries,focusing on lifecycle integration,economic and operational benefits,and key barriers to adoption.Findings indicate that BIM can enhance project outcomes in whole project life.However,challenges such as high initial costs,lack of skilled personnel,and insufficient policy support hinder widespread adoption.Moreover,the underutilization of BIM in the operational phase leads to unsatisfied returns on investment.The study highlights the critical role of government policies in driving BIM implementation,particularly in public-sector road projects.Recommendations include fostering BIM standards,investing in workforce training,and developing localized BIM solutions to maximize long-term benefits for developing nations.
文摘Road construction plays a vital role in the social and economic development of developing countries.However,it is often constrained by financial limitations,maintenance challenges,and environmental concerns.Building Information Modelling(BIM)presents a transformative opportunity to improve road construction efficiency,cost-effectiveness,and sustainability by enabling digital collaboration,lifecycle management,and data-driven decision-making.This paper examines the current state of BIM application in the road construction sector of developing countries,focusing on lifecycle integration,economic and operational benefits,and key barriers to adoption.Findings indicate that BIM can enhance project outcomes in whole project life.However,challenges such as high initial costs,lack of skilled personnel,and insufficient policy support hinder widespread adoption.Moreover,the underutilization of BIM in the operational phase leads to unsatisfied returns on investment.The study highlights the critical role of government policies in driving BIM implementation,particularly in public-sector road projects.Recommendations include fostering BIM standards,investing in workforce training,and developing localized BIM solutions to maximize long-term benefits for developing nations.
基金supported by Zhongtian Iron and Steel-University of Science and Technology Beijing Youth Science and Technology Innovation Fund(No.FZTNTC2024050005)National Engineering Laboratory for Mobile Source Emission Control Technology,China(No.NELMS2020A07)The Fundamental Research Funds for the Central Universities,China(No.FRF-AT-20-12)。
文摘Zeolite-loaded noble metal catalysts have demonstrated excellent performance in addressing cold-start automotive exhaust NOx emissions and catalytic oxidation of VOCs applications.Pd and Pt are the most commonly used active metals in PNA and VOC catalysts,respectively.However,despite the same metal/zeolite composition,the efficient active sites for PNA and VOC catalysts have been viewed as mainly Pd^(2+) and Pt^(0),respectively,both of which are different from each other.As a result,various methods need to be applied to dope Pd and Pt in zeolitic support respectively for different usages.No matter which type of metal species is needed,the common requirement for both PNA and VOC catalysts is that the metal species should be highly dispersed in zeolite support and stay stable.The purpose of this paper is to review the progress of synthetic means of zeolite-coated noble metals(Pd,Pt,etc.)as effective PNA or VOC catalysts.To give a better understanding of the relationship between efficient metal species and the introduced methods,the species that contributed to the NOx adsorption(PNA)and VOCs deep catalytic oxidation were first summarized and compared.Then,based on the above discussion,the detailed construction strategies for different active sites in PNA and VOC catalysts,respectively,were elaborated in terms of synthetic routes,precursor selection,and zeolite carrier requirements.It is hoped that this will contribute to a better understanding of noble metal adsorption/catalysis in zeolites and provide promising strategies for the design of adsorption/catalysts with high activity,selectivity and stability.
文摘This study examines the “V + Dào” construction as a state change event through the lens of the Event Integration Hypothesis. It focuses on how these constructions represent state changes, exploring distinctions between “change” and “stasis”. Using a corpus-based approach, the analysis covers the semantic and syntactic features of “V + Dào” constructions and their event integration patterns. The findings highlight the distribution of agency, animacy, and support relations in state change events, emphasizing the complex interaction of internal and external event integrations and their correlation with the conceptual primitives of change and transition. This study offers insights into the lexicalization and grammaticalization processes of the “V + Dào” construction, and potentially the broader verb-complement constructions in Mandarin.
文摘This paper introduces the relevant content of construction quality inspection standards for office buildings,including their differences and special requirements of general buildings.It elaborates on the application of BIM technology and the PDCA cycle model in each stage of construction,emphasizes the importance of technical management system construction,and also discusses the influence and optimization path of prefabricated buildings and LEED certification on the standards.
文摘This paper explores the collaborative management model of construction technology and plant beautification strategies in landscape architecture site management.It analyzes the key aspects of construction technology and the implementation points of plant beautification strategies,constructs a synergy mechanism between technology and strategy,and proposes a dynamic adjustment and multi-professional collaboration model.The effectiveness of this model is verified through practical case studies,providing theoretical support and practical references for the refined construction of landscape architecture.