期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
BESⅢ ETOF upgrade readout electronics commissioning
1
作者 王小状 代洪亮 +8 位作者 吴智 衡月昆 张杰 曹平 季筱璐 李澄 孙维佳 王思宇 汪昀 《Chinese Physics C》 SCIE CAS CSCD 2017年第1期156-161,共6页
It is proposed to upgrade the endcap time-of-flight(ETOF) of the Beijing Spectrometer Ⅲ(BESⅢ) with a multi-gap resistive plate chamber(MRPC), aiming at an overall time resolution of about 80 ps. After completi... It is proposed to upgrade the endcap time-of-flight(ETOF) of the Beijing Spectrometer Ⅲ(BESⅢ) with a multi-gap resistive plate chamber(MRPC), aiming at an overall time resolution of about 80 ps. After completing the entire readout electronics system, some experiments, such as heat radiation, radiation hardness and large-current beam tests, have been carried out to confirm the reliability and stability of the readout electronics. An on-detector test of the readout electronics has also been performed with the beam at the BEPCⅡ E3 line. The test results indicate that the readout electronics system fulfills its design requirements. 展开更多
关键词 BESⅢ upgrade of endcap TOF FEE the readout electronics system MRPC
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部