期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
DETERMINATION METHOD OF OPTIMAL SUPPORTING TIME IN HEADING FACE
1
作者 杜长龙 曹红波 +1 位作者 王燕宁 张艳 《Journal of Coal Science & Engineering(China)》 1997年第2期41-44,共4页
This paper has put forward a concept of optimal supporting time through analysing the influence of the supporting time in the heading face on the supporting result of surrounding rock.The method Of the optimal Support... This paper has put forward a concept of optimal supporting time through analysing the influence of the supporting time in the heading face on the supporting result of surrounding rock.The method Of the optimal Supporting time determined by graphical method is discussed, and the calculating formula for determining the optimal supporting time through the analysis method is derived. 展开更多
关键词 heading face roadway support optimal supporting time
在线阅读 下载PDF
Long-term stability analysis of large-scale underground plant of Xiangjiaba hydro-power station 被引量:3
2
作者 徐卫亚 聂卫平 +3 位作者 周先齐 石崇 王伟 冯树荣 《Journal of Central South University》 SCIE EI CAS 2011年第2期511-520,共10页
Numerical analysis of the optimal supporting time and long-term stability index of the surrounding rocks in the underground plant of Xiangjiaba hydro-power station was carried out based on the rheological theory. Firs... Numerical analysis of the optimal supporting time and long-term stability index of the surrounding rocks in the underground plant of Xiangjiaba hydro-power station was carried out based on the rheological theory. Firstly,the mechanical parameters of each rock group were identified from the experimental data; secondly,the rheological calculation and analysis for the cavern in stepped excavation without supporting were made; finally,the optimal time for supporting at the characteristic point in a typical section was obtained while the creep rate and displacement after each excavation step has satisfied the criterion of the optimal supporting time. Excavation was repeated when the optimal time for supporting was identified,and the long-term stability creep time and the maximum creep deformation of the characteristic point were determined in accordance with the criterion of long-term stability index. It is shown that the optimal supporting time of the characteristic point in the underground plant of Xiangjiaba hydro-power station is 5-8 d,the long-term stability time of the typical section is 126 d,and the corresponding largest creep deformation is 24.30 mm. While the cavern is supported,the cavern deformation is significantly reduced and the stress states of the surrounding rock masses are remarkably improved. 展开更多
关键词 large-scale underground plant rheological mechanics optimal supporting time maximum creep deformation long-termstability long-term strength
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部