期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Support failure of a high-stress soft-rock roadway in deep coal mine and the equalized yielding support technology: a case study 被引量:34
1
作者 Lihui Sun 《International Journal of Coal Science & Technology》 EI 2015年第4期279-286,共8页
Abstract There are many soft-rock roadway coal mines in China. The surrounding rocks of the high-stress soft-rock roadways in deep mine are especially difficult to be supported using the traditional supporting way. In... Abstract There are many soft-rock roadway coal mines in China. The surrounding rocks of the high-stress soft-rock roadways in deep mine are especially difficult to be supported using the traditional supporting way. In this study, the south wing rail roadway on the second level of Yunjialing coal mine in China was used as an example to analyze the deformation and failure characteristics and influencing factors of roadway. On this basis, this study proposed the equalized yielding support idea which employs the yielding rings to realize the pressure equalization on the bolts and cables in the section. To achieve this purpose, the first bolt-mesh-cable equalizing pressure yielding support was integrated with the second grouting reinforcement. The results proved that the yield rings of the bolts and cables on the spandrel of the arched roadway firstly developed yielding deformation; then the deformation extended to the vault of the roadway; the bolts and cables achieved a yielding extreme value of 15 and 18 tonnes, respectively. The roadway surrounding rock tended to be stable at the 26th day after the maintenance. The equalizing pressure yielding supporting technology plays a moderate pressure-releasing and actively controlling role on the surrounding rocks in the soft-rock roadway with large deformation. 展开更多
关键词 Deep-well high-stress Soft-rock roadway Equalized yielding support Grouting reinforcement
在线阅读 下载PDF
Mechanism and practice of rock control in deep large span cut holes 被引量:2
2
作者 Li Chong Xu Jinhai +2 位作者 Fu Chunsheng Wu Rui Ma Qianqian 《Mining Science and Technology》 EI CAS 2011年第6期891-896,共6页
Deep large span cut holes are difficult to stabilize. The 7801 cut hole in the Lu'an Wuyang Mine was used as this project's background. The main factors affecting large span cut hole stability are analyzed. Pr... Deep large span cut holes are difficult to stabilize. The 7801 cut hole in the Lu'an Wuyang Mine was used as this project's background. The main factors affecting large span cut hole stability are analyzed. Pre- stressed bolting theory was used to design a roof control method for a large span roadway. By reducing the span and applying equal strength coordinated supports the rock could be stabilized. The control prin- ciples and methods are given herein along with the analysis. A double micro arch cross section roadway is defined and its use in solving the current problem is described. Beam arch theory was used to build a model of the double micro arch cross section roadway. A support reverse force model for the arch foot intersection was also derived. A support method based upon reducing the width of the large span in the cut hole is presented. These results show that the reduced span of the roadway roof plus the use of cable anchors and single supports gives an effective way to control the large span cut hole. On site monitoring showed that the reduced span support from the double micro arch cross section roadway design had a significant effect. The roadway surface displacement was small and harmful deformation of the cut hole was effectively controlled. This will ensure its long term stability. 展开更多
关键词 Deep large span cut hole Double micro arch cross-section roadway Roof control by cross cut Equal strength coordinated support
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部