First Engineering Commissioning of EAST Tokamak 被引量:11
1
作者 万元熙 李建刚 翁佩德 《Plasma Science and Technology》 SCIE EI CAS CSCD 2006年第3期253-254,共2页
Experimental Advanced Superconducting Tokamak (EAST) is the first fully superconducting tokamak. The first commissioning started on Feb. 1st of 2006 and finished on March 30TM of 2006 at the Institute of Plasma Phys... Experimental Advanced Superconducting Tokamak (EAST) is the first fully superconducting tokamak. The first commissioning started on Feb. 1st of 2006 and finished on March 30TM of 2006 at the Institute of Plasma Physics, Chinese Academy of Sciences. It consists of leakage testing at both room temperature and low temperature, pumping down, cooling down all coils, current leads, bus bar and the thermal shielding, exciting all the coils, measuring magnetic configuration and warming up the magnets. The electromagnetic, thermal hydraulic and mechanical performance of EAST Toroidal Field (TF) and Poloidal Field (PF) magnets have also been tested. All sub-systems, including pumping system, cryogenic system, PF& TF power supply systems, magnet instrumentation system, quench detection and protection system, water cooling system, data acquisition system, main control system, plasma control system (PCS), interlock and safety system have been successfully tested. 展开更多
关键词 TOKAMAK supercoducting magnet TEST
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部