期刊文献+
共找到2,219篇文章
< 1 2 111 >
每页显示 20 50 100
Experimental study and numerical analysis on bearing behaviors of super-long rock-socketed bored pile groups 被引量:3
1
作者 高睿 胡念 朱斌 《Journal of Southeast University(English Edition)》 EI CAS 2010年第4期597-602,共6页
A centrifuge modeling test and a three-dimensional finite element analysis(FEA)of super-long rock-socketed bored pile groups of the Tianxingzhou Bridge are proposed.Based on the similarity theory,different prototypi... A centrifuge modeling test and a three-dimensional finite element analysis(FEA)of super-long rock-socketed bored pile groups of the Tianxingzhou Bridge are proposed.Based on the similarity theory,different prototypical materials are simulated using different indicators in the centrifuge model.The silver sand,the shaft and the pile cap are simulated according to the natural density,the compressive stiffness and the bending stiffness,respectively.The finite element method(FEM)is implemented and analyzed in ANSYS,in which the stress field during the undisturbed soil stage,the boring stage,the concrete-casting stage and the curing stage are discussed in detail.Comparisons in terms of load-settlement,shaft axial force distribution and lateral friction between the numerical results and the test data are carried out to investigate the bearing behaviors of super-long rock-socketed bored pile groups under loading and unloading conditions.Results show that there is a good agreement between the centrifuge modeling tests and the FEM.In addition,the load distribution at the pile top is complicated,which is related to the stiffness of the cap,the corresponding assumptions and the analysis method.The shaft axial force first increases slightly with depth then decreases sharply,and the rate of decrease in rock is greater than that in sand and soil. 展开更多
关键词 super-long rock-socketed pile bored pile groups centrifuge modeling test finite element analysis
在线阅读 下载PDF
Reversible Oxygen-Rich Functional Groups Grafted 3D Honeycomb-Like Carbon Anode for Super-Long Potassium Ion Batteries 被引量:9
2
作者 Na Cheng Wang Zhou +2 位作者 Jilei Liu Zhigang Liu Bingan Lu 《Nano-Micro Letters》 SCIE EI CAS CSCD 2022年第9期132-146,共15页
Studies have found that oxygen-rich-containing functional groups in carbon-based materials can be used as active sites for the storage performance of K^(+),but the basic storage mechanism is still unclear.Herein,we co... Studies have found that oxygen-rich-containing functional groups in carbon-based materials can be used as active sites for the storage performance of K^(+),but the basic storage mechanism is still unclear.Herein,we construct and optimize 3D honeycomb-like carbon grafted with plentiful COOH/C=O functional groups(OFGC)as anodes for potassium ion batteries.The OFGC electrode with steady structure and rich functional groups can effectively contribute to the capacity enhancement and the formation of stable solid electrolyte interphase(SEI)film,achieving a high reversible capacity of 230 mAh g^(-1) at 3000 mA g^(-1) after 10,000 cycles(almost no capacity decay)and an ultra-long cycle time over 18 months at 100 mA g^(-1).The study results revealed the reversible storage mechanism between K^(+)and COOH/C=O functional groups by forming C-O-K compounds.Meanwhile,the in situ electrochemical impedance spectroscopy proved the highly reversible and rapid de/intercalation kinetics of K+in the OFGC electrode,and the growth process of SEI films.In particular,the full cells assembled by Prussian blue cathode exhibit a high energy density of 113 Wh kg^(-1) after 800 cycles(calculated by the total mass of anode and cathode),and get the light-emitting diodes lamp and ear thermometer running. 展开更多
关键词 Honeycomb-like super-long Carbon anode Potassium-ion batteries
在线阅读 下载PDF
Parameter effects on the dynamic characteristics of a super-long-span triple-tower suspension bridge 被引量:15
3
作者 Hao WANG Ke-guan ZOU Ai-qun LI Chang-ke JIAO 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2010年第5期305-316,共12页
A 3D finite element model for the Taizhou Yangtze River Bridge,the first triple-tower long-span suspension bridge in China,is established based on the nonlinear finite element software ABAQUS,and the dynamic character... A 3D finite element model for the Taizhou Yangtze River Bridge,the first triple-tower long-span suspension bridge in China,is established based on the nonlinear finite element software ABAQUS,and the dynamic characteristics of the bridge are analyzed using the LANCZOS eigenvalue solution method. The study focuses on the effects of the vertical,lateral and torsional stiffness of the steel box girder,the rigid central buckle and the elastic restraints connecting the towers and the steel box girder on the dynamic characteristics of the triple-tower suspension bridge. Our results show that,in general,the dynamic characteristics of the triple-tower suspension bridge are similar to those of two-tower suspension bridges. The vertical,lateral and torsional stiffness of the steel box girder have different effects on the dynamic characteristics of triple-tower suspension bridges. The elastic re-straints have a more significant effect on the dynamic characteristics than the central buckle,and decreasing the stiffness of the elastic restraints results in the appearance of a longitudinal floating vibration mode of the bridge. Also,rigid central buckles have a greater influence on the dynamic characteristics of triple-tower suspension bridges than on those of two-tower suspension bridges. The results obtained could serve as a valuable numerical reference for analyzing and designing super-long-span triple-tower suspension bridges. 展开更多
关键词 Suspension bridge Taizhou Bridge Triple-tower Dynamic characteristics super-long-span
原文传递
Axial bearing behavior of super-long piles in deep soft clay over stiff layers 被引量:5
4
作者 邹新军 赵明华 《Journal of Central South University》 SCIE EI CAS 2013年第7期2008-2016,共9页
In order to find out the bearing behavior of super-long piles located in deep soft clay over stiff layers around Dongting Lake, China, a test pile was first designed with the field loading test finished afterward. Bas... In order to find out the bearing behavior of super-long piles located in deep soft clay over stiff layers around Dongting Lake, China, a test pile was first designed with the field loading test finished afterward. Based on the measured test results, load transfer mechanism and bearing behavior of the pile shaft were discussed in detail. Then, by introducing a bi-linear model for shaft friction and the tri-linear model for pile tip resistance, respectively, the governing differential equation of pile soil system was set up by the load transfer method with the analytical solutions derived as well, taking into account the effect by stratified feature and various bearing conditions of subsoil, material nonlinearity, and the sediment under pile tip. Furthermore, formulas to determine the axial capacity of super-long piles by the pile top settlement were advised and applied to analyze the test pile. Good agreement between the predicted load settlement variations and the measured data is obtained to verify the validity of the present method. The results also show that, the axial bearing capacity of super-long piles should be controlled by the allowable pile top settlement, and buckling stability of the pile shaft should be paid attention as well. 展开更多
关键词 super-long pile SETTLEMENT load transfer model axial load capacity field test
在线阅读 下载PDF
Realizing super-long Cu_2O nanowires arrays for high-efficient water splitting applications with a convenient approach 被引量:2
5
作者 Nasori Nasori Tianyi Dai +6 位作者 Xiaohao Jia Agus Rubiyanto Dawei Cao Shengchun Qu Zhanguo Wang Zhijie Wang Yong Lei 《Journal of Semiconductors》 EI CAS CSCD 2019年第5期55-60,共6页
Nanowire(NW) structures is an alternative candidate for constructing the next generation photoelectrochemical water splitting system, due to the outstanding optical and electrical properties. NW photoelectrodes compar... Nanowire(NW) structures is an alternative candidate for constructing the next generation photoelectrochemical water splitting system, due to the outstanding optical and electrical properties. NW photoelectrodes comparing to traditional semiconductor photoelectrodes shows the comparatively shorter transfer distance of photo-induced carriers and the increase amount of the surface reaction sites, which is beneficial for lowering the recombination probability of charge carriers and improving their photoelectrochemical(PEC) performances. Here, we demonstrate for the first time that super-long Cu_2O NWs, more than 4.5 μm,with highly efficient water splitting performance, were synthesized using a cost-effective anodic alumina oxide(AAO) template method. In comparison with the photocathode with planar Cu_2O films, the photocathode with Cu_2O NWs demonstrates a significant enhancement in photocurrent, from –1.00 to –2.75 mA/cm^2 at –0.8 V versus Ag/AgCl. After optimization of the photoelectrochemical electrode through depositing Pt NPs with atomic layer deposition(ALD) technology on the Cu_2O NWs, the plateau of photocurrent has been enlarged to –7 mA/cm^2 with the external quantum yield up to 34% at 410 nm. This study suggests that the photoelectrode based on Cu_2O NWs is a hopeful system for establishing high-efficiency water splitting system under visible light. 展开更多
关键词 super-long nanowires P-TYPE CU2O AAO template PHOTOELECTROCHEMICAL water splitting
在线阅读 下载PDF
Revised Super-long Down-regulation Protocol Improves the Outcome of Infertile Patients with Repeated Implantation Failure in IVF/ICSI-ET 被引量:2
6
作者 Min-feng SHI Tie ZHOU +10 位作者 Ying WANG Guang-hua CHEN Ming ZHU Jun OU Hui DU Tao-fei YAN Di SONG Ju-fen ZHENG Hui-qin ZHANG Ning HUI Ying-hao SUN 《Journal of Reproduction and Contraception》 CAS 2014年第2期89-96,共8页
Objective To investigate the outcome of revised super-long down-regulation protocol (RSDP) for in vitro fertilization / intracytoplasmic sperm injection-embryo transfer (1VF/1CS1-ET) in the special infertile pat... Objective To investigate the outcome of revised super-long down-regulation protocol (RSDP) for in vitro fertilization / intracytoplasmic sperm injection-embryo transfer (1VF/1CS1-ET) in the special infertile patients with repeated implantation failure (RIF). Methods Patients with RIF were divided into RSDP group and routine long downregulation protocol (RLDP) group. In RSDP group, gonadotropin releasing hormone agonist (GnRHa) was injected intramuscularly by 2.5 mg in mid-luteal phase for the ftrst time and 1.25 mg after 28 d; gonadotropin (Gn) was started 14 d later after the second GnRHa dose. IVF/ICSI-ET was performed according to the routine procedure. The clinical outcomes of RSDP group were compared with those of RLDP group. Results In RSDP group, the number of retrieved oocytes and valid embryos was significantly lower (P〈0.05); there were no significant differences about fertilization rate (P〉0. 05); both good-quality embryo rate and implantation rate were significantly increased (P〈0. 005); clinical pregnancy rate was obviously improved (P〈0. 05), as compared with RLDP group.Conclusion RSDP can improve the IVF outcomes significantly in RIF patients. 展开更多
关键词 implantation failure revised super-long down-regulation protocol (RSDP) routine long protocol in vitro fertilization (IVF)
原文传递
Buckling analysis of super-long rock-socketed filling piles in soft soil area by element free Galerkin method 被引量:2
7
作者 邹新军 赵明华 刘光栋 《Journal of Central South University of Technology》 EI 2007年第6期858-863,共6页
In order to discuss the buckling stability of super-long rock-socketed filling piles widely used in bridge engineering in soft soil area such as Dongting Lake, the second stability type was adopted instead of traditio... In order to discuss the buckling stability of super-long rock-socketed filling piles widely used in bridge engineering in soft soil area such as Dongting Lake, the second stability type was adopted instead of traditional first type, and a newly invented numerical analysis method, i.e. the element-free Galerkin method (EFGM), was introduced to consider the non-concordant deformation and nonlinearity of the pile-soil interface. Then, based on the nonlinear elastic-ideal plastic pile-soil interface model, a nonlinear iterative algorithm was given to analyze the pile-soil interaction, and a program for buckling analysis of piles by the EFGM (PBAP-EFGM) and arc length method was worked out as well. The application results in an engineering example show that, the shape of pile top load-settlement curve obtained by the program agrees well with the measured one, of which the difference may be caused mainly by those uncertain factors such as possible initial defects of pile shaft and the eccentric loading during the test process. However, the calculated critical load is very close with the measured ultimate load of the test pile, and the corresponding relative error is only 5.6%, far better than the calculated values by linear and nonlinear incremental buckling analysis (with a greater relative error of 37.0% and 15.4% respectively), which also verifies the rationality and feasibility of the present method. 展开更多
关键词 super-long rock-socketed filling pile buckling analysis element free Galerkin method critical load
在线阅读 下载PDF
Structure properties and Noether symmetries for super-long elastic slender rod 被引量:1
8
作者 傅景礼 赵维加 翁玉权 《Chinese Physics B》 SCIE EI CAS CSCD 2008年第7期2361-2365,共5页
DNA is a nucleic acid molecule with double-helical structures that are special symmetrical structures attracting great attention of numerous researchers. The super-long elastic slender rod, an important structural mod... DNA is a nucleic acid molecule with double-helical structures that are special symmetrical structures attracting great attention of numerous researchers. The super-long elastic slender rod, an important structural model of DNA and other long-train molecules, is a useful tool in analysing the symmetrical properties and the stabilities of DNA. This paper studies the structural properties of a super-long elastic slender rod as a structural model of DNA by using Kirchhoff's analogue technique and presents the Noether symmetries of the model by using the method of infinitesimal transformation. Baaed on Kirchhoff's analogue it analyses the generalized Hamilton canonical equations. The infinitesimal transfornaationa with rcspect to the radial coordinnte, the gonarnlizod coordinates, and the Cluasi-momenta of 5he model are introduced. The Noether gymmetries and conserved qugntities of the model are obtained. 展开更多
关键词 super-long elastic slender rod Kirchhoff's analogue Noether symmetry conserved quantity
原文传递
Challenges and Thoughts on Risk Management and Control for the Group Construction of a Super-Long Tunnel by TBM 被引量:18
9
作者 Mingjiang Deng 《Engineering》 2018年第1期112-122,共11页
The total length of the second stage of the water supply project in the northern areas of the Xinjiang Uygur Autonomous Region is 540 km, of which the total length of the tunnels is 516 km. The total tun- neling milea... The total length of the second stage of the water supply project in the northern areas of the Xinjiang Uygur Autonomous Region is 540 km, of which the total length of the tunnels is 516 km. The total tun- neling mileage is 569 km, which includes 49 slow-inclined shafts and vertical shafts. Among the tunnels constructed in the project, the Ka-Shuang tunnel, which is a single tunnel with a length of 283 kin, is cur- rently the longest water-conveyance tunnel in the world. The main tunnel of the Ka-Shuang tunnel is divided into 18 tunnel-boring machine (TBM) sections, and 34 drilling-and-blasting sections, with 91 tunnel faces. The construction of the Ka-Shuang tunnel has been regarded as an unprecedented challenge for project construction management, risk control, and safe and efficient construction; it has also pre- sented higher requirements for the design, manufacture, operation, and maintenance of the TBMs and their supporting equipment. Based on the engineering characteristics and adverse geological conditions, it is necessary to analyze the major problems confronted by the construction and systematically locate disaster sources. In addition, the risk level should be reasonably ranked, responsibility should be clearly identified, and a hierarchical-control mechanism should be established. Several techniques are put for- ward in this paper to achieve the objectives mentioned above; these include advanced geological prospecting techniques, intelligent tunneling techniques combined with the sensing and fusion of infor- mation about rock parameters and mechanical parameters, monitoring and early-warning techniques, and modern information technologies. The application of these techniques offers scientific guidance for risk control and puts forward technical ideas about improving the efficiency of safe tunneling. These techniques and ideas have great significance for the development of modern tunneling technolo- gies and research into major construction equipment. 展开更多
关键词 super-long tunnelsGroup construction by TBMRisk management and controlTechnical measures
在线阅读 下载PDF
Perturbation of symmetries for super-long elastic slender rods
10
作者 丁宁 方建会 《Chinese Physics B》 SCIE EI CAS CSCD 2011年第12期8-16,共9页
This paper analyses perturbations of Noether symmetry, Lie symmetry, and form invariance for super-long elastic slender rod systems. Criterion and structure equations of the symmetries after disturbance are proposed. ... This paper analyses perturbations of Noether symmetry, Lie symmetry, and form invariance for super-long elastic slender rod systems. Criterion and structure equations of the symmetries after disturbance are proposed. Considering perturbation of all infinitesimal generators, three types of adiabatic invariants induced by perturbation of symmetries for the system are obtained. 展开更多
关键词 super-long elastic slender rod SYMMETRY PERTURBATION adiabatic invariant
原文传递
Electrochemical Introduction of Active Sites into Super-long Carbon Nanotubes for Enhanced Capacitance
11
作者 HU Yue ZHAO Yang +4 位作者 LI Yan XIE Xue-jun LI Hui DAI Li-ming QU Liang-ti 《Chemical Research in Chinese Universities》 SCIE CAS CSCD 2012年第2期302-307,共6页
Electrochemical cyclic voltammetric(CV) scan was applied to inducing the partial oxidation and defects of carbon nanotubes(CNTs).The electrochemically induced functional groups and physical defects were demonstrat... Electrochemical cyclic voltammetric(CV) scan was applied to inducing the partial oxidation and defects of carbon nanotubes(CNTs).The electrochemically induced functional groups and physical defects were demonstrated to show positive effects on the nanotube capacitance,as exemplified by super-long CNT arrays as model for the easy fabrication of CNT electrodes.Specifically,the initial hydrophobic nanotube surface becomes hydrophilic and a ten-time enhancement in capacitance is observed with respect to the pristine CNT sample.Thus,the electrochemical CV pretreatment can be used as an effective approach to activate the CNT surface for an enhanced electrochemical performance in capacitors,and many other advanced devices beyond capacitors,such as electrochemical sensors and batteries. 展开更多
关键词 Energy storage Electrochemical capacitor super-long carbon nanotube ELECTROCHEMISTRY DEFECT
在线阅读 下载PDF
Seismic performance evaluation for super-long span cable-stayed bridges
12
作者 Ye Aijun Wu Shouchang 《Engineering Sciences》 EI 2009年第1期23-29,共7页
Based on the capacity/demand(C/D)analysis of bridge components,and life cycle and performance based seismic design principles,a practical approach is developed for the seismic performance evaluation of super-long span... Based on the capacity/demand(C/D)analysis of bridge components,and life cycle and performance based seismic design principles,a practical approach is developed for the seismic performance evaluation of super-long span cable-stayed bridges.According to the approach,the seismic performance evaluation of the Sutong Bridge,which is a cable-stayed bridge with a main span of 1 088 m,is completed,and the practicality of the approach is validated.The earthquake resistance level for super-long span cable-stayed bridges is discussed,including the earthquake level,its corresponding structural performance and check indices.And a set of formula for capacity/demand ratio calculation of bridge components is proposed. 展开更多
关键词 super-long span cable-stayed bridges seismic performance capacity/demand analysis
在线阅读 下载PDF
Migration law of respirable dust on a super-long fully mechanized double-shearer working face
13
作者 Jia Min Fu Yingpeng +3 位作者 Yuan Yong Wei Hongmin Sun Song Li Jie 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第6期1109-1115,共7页
In order to understand the migration law of respirable dust and gain reasonable design parameters for dust control on a super-long double-shearer fully mechanized working face, this paper describes research carried ou... In order to understand the migration law of respirable dust and gain reasonable design parameters for dust control on a super-long double-shearer fully mechanized working face, this paper describes research carried out using a numerical simulation package(Fluent) based on gas-solid coupling dispersed multiphase flow model and field measurement to research different technology modes, dust distribution law at different intervals where shearers work in opposite directions on the lower 9303 face, No. 2 Jining Mine,Yankuang Coal Mining Co. Results show that the concentration of dust 3–6 m away from the shearers working in the same directions was large, while the impact area of respirable dust near the shearer increased significantly to 5–6 m with the distance between two shearers working in opposite directions.The concentration of dust on a double-shearer face was considerably higher than that of a face with one shear under the combined effect of wind speed on the face and disturbed wind around the shearer, while the dust concentration near the shearer on the return side was considerably higher than that on the inlet side. The concentration of dust on a double-shearer face along the airflow declined slowly so that dust was hard to control. Simulation results confirmed the results of field measurement, which could provide reference for dust prevention design. 展开更多
关键词 super-long working face Double-shearer Respirable dust Migration law Numerical simulation
在线阅读 下载PDF
Predictive analysis of stress regime and possible squeezing deformation for super-long water conveyance tunnels in Pakistan
14
作者 Wang Chenghu Bao Linhai 《International Journal of Mining Science and Technology》 SCIE EI 2014年第6期825-831,共7页
The prediction of the stress field of deep-buried tunnels is a fundamental problem for scientists and engineers. In this study, the authors put forward a systematic solution for this problem. Databases from the World ... The prediction of the stress field of deep-buried tunnels is a fundamental problem for scientists and engineers. In this study, the authors put forward a systematic solution for this problem. Databases from the World Stress Map and the Crustal Stress of China, and previous research findings can offer prediction of stress orientations in an engineering area. At the same time, the Andersonian theory can be used to analyze the possible stress orientation of a region. With limited in-situ stress measurements, the Hock-Brown Criterion can be used to estimate the strength of rock mass in an area of interest by utilizing the geotechnical investigation data, and the modified Sheorey's model can subsequently be employed to predict the areas' stress profile, without stress data, by taking the existing in-situ stress measurements as input parameters. In this paper, a case study was used to demonstrate the application of this systematic solution. The planned Kohala hydropower plant is located on the western edge of Qinghai-Tibet Plateau. Three hydro-fracturing stress measurement campaigns indicated that the stress state of the area is SH - Sh 〉 Sv or SH 〉Sv 〉 Sh. The measured orientation of Sn is NEE (N70.3°-89°E), and the regional orientation of SH from WSM is NE, which implies that the stress orientation of shallow crust may be affected by landforms. The modified Sheorey model was utilized to predict the stress profile along the water sewage tunnel for the plant. Prediction results show that the maximum and minimum horizontal principal stres- ses of the points with the greatest burial depth were up to 56.70 and 40.14 MPa, respectively, and the stresses of areas with a burial depth of greater than 500 m were higher. Based on the predicted stress data, large deformations of the rock mass surrounding water conveyance tunnels were analyzed. Results showed that the large deformations will occur when the burial depth exceeds 300 m. When the burial depth is beyond 800 m, serious squeezing deformations will occur in the surrounding rock masses, thus requiring more attention in the design and construction. Based on the application efficiency in this case study, this prediction method proposed in this paper functions accurately. 展开更多
关键词 super-long water conveyance tunnel In-situ stress state Squeezing deformation Prediction analysis Kohala hydropower plant
在线阅读 下载PDF
Key Technologies for Design of Changqing Yellow River Super-long Bridge of Zhengzhou Ji'nan HSR
15
作者 ZUO Jiaqiang ZHANG Shang +3 位作者 MA Chenlong WANG Zongfeng ZHANG Hai ZHENG Mingda(Translated) 《Chinese Railways》 2023年第2期3-11,共9页
Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge de... Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge. 展开更多
关键词 Zhengzhou-Ji'nan HSR Changqing Yellow River super-long Bridge partial cable stayed bridge multi-tower cable-stayed bridge multiple span and long connection bridge design
原文传递
R■D Base of Super-long Afterglow Phosphors Established in Linxi
16
《China Rare Earth Information》 2005年第9期3-3,共1页
关键词 D Base of super-long Afterglow Phosphors Established in Linxi BASE
在线阅读 下载PDF
旨在提质增效的城市轨道交通超长线路规划设计创新与实践
17
作者 周勇 张倩璐 《现代城市轨道交通》 2026年第2期1-6,共6页
随着城市化进程的推进及都市圈、城市群的加速形成,为适应日益增长的交通出行需求,我国城市轨道交通线网规模持续扩大,部分线路不断延伸,形成运营里程超过60 km的超长线路。此类线路在提升外围组团可达性、缓解换乘压力、缩短出行时间... 随着城市化进程的推进及都市圈、城市群的加速形成,为适应日益增长的交通出行需求,我国城市轨道交通线网规模持续扩大,部分线路不断延伸,形成运营里程超过60 km的超长线路。此类线路在提升外围组团可达性、缓解换乘压力、缩短出行时间等方面作用显著,但也因客流时空分布不均、功能复合多样等特点,面临工程建设经济性、运营效率、可持续性等多重挑战。为此,文章在概述我国城市轨道交通超长线路发展现状及所面临挑战的基础上,以深圳地铁第五期建设规划中的32号线一期工程为例,系统总结该线路与既有地铁2号线、8号线一期和二期以及在建的8号线三期组合为1条超长线路的过程中,通过运营组织统筹优化与工程设计创新实现提质增效的成果及实践经验,以期为类似项目提供参考和借鉴。 展开更多
关键词 城市轨道交通 超长线路 多线组合运营 规划设计 提质增效
在线阅读 下载PDF
软土地基超长桩静载试验新方法及应用研究
18
作者 史钦华 杜志祥 +3 位作者 杨奇 邓煜晨 冷伍明 吴亚飞 《铁道学报》 北大核心 2026年第2期173-181,共9页
针对传统竖向抗压静载试验方法在软弱地基与超长桩大吨位加载中的技术瓶颈,提出利用既有承台和工程桩联合提供反力的静载试验新方法,将其应用于甬金铁路深厚软土区桥梁超长桩的大吨位静载试验,揭示超长桩的承载特性及荷载传递机制。研... 针对传统竖向抗压静载试验方法在软弱地基与超长桩大吨位加载中的技术瓶颈,提出利用既有承台和工程桩联合提供反力的静载试验新方法,将其应用于甬金铁路深厚软土区桥梁超长桩的大吨位静载试验,揭示超长桩的承载特性及荷载传递机制。研究表明:新方法具有承载机理明确、安全经济和适应性强的优点,尤其适用于深厚软土地区超长桩承载力检测;深厚软土区超长桩的荷载-沉降曲线呈缓变型,属于渐进式破坏;容许承载力为6120 kN(超过设计值29%),安全可靠;在设计、容许和极限荷载作用下,桩身压缩占比分别为100%、99.5%和34.3%,表明超长桩沉降需考虑桩身的压缩量;设计荷载作用下超长桩表现近似为纯摩擦桩,极限荷载时表现为端承摩擦桩工作状态;桩端阻力与位移关系呈加工硬化型。浅、深层的淤泥质黏土的桩侧阻力-相对位移关系曲线呈软化型,其余土层的桩侧阻力表现为硬化型;软土层最大桩侧阻力平均值是规范推荐值的1.11~2.89倍。 展开更多
关键词 现场静载试验 超长桩 软土地基 极限承载力 荷载传递特性
在线阅读 下载PDF
Modified super-long down-regulation protocol improves fertilization and pregnancy in patients with poor ovarian responses 被引量:3
19
作者 ZHANG Hui-juan SONG Xue-ru +1 位作者 LU Rui XUE Feng-xia 《Chinese Medical Journal》 SCIE CAS CSCD 2012年第16期2837-2840,共4页
Background The successful end-point of in vitro fertilization (IVF) treatment is for a woman to give live birth. This outcome is based on various factors including adequate number of retrieved eggs. Failure to recru... Background The successful end-point of in vitro fertilization (IVF) treatment is for a woman to give live birth. This outcome is based on various factors including adequate number of retrieved eggs. Failure to recruit adequate follicles, from which the eggs are retrieved, is called a "poor response". How to improve the clinical pregnancy rates of poor responders was one of the tough problems for IVF. Methods The study involved 51 patients who responded poorly to high dose gonadotropin treatment in their previous cycles at our reproductive center, between April 2010 and February 2012. The previous cycle (group A) received routine long protocol; the subsequent cycle (group B) received modified super-long down-regulation protocol. The primary outcome of the study was the number of oocytes fertilized. The increase in the pregnancy rate was the secondary outcome. Differences between the groups were assessed by using Student's t test and Z2 test where appropriate. Results The patients' average age was (36.64±3.85) years. The mean duration of ovarian stimulation cycles of the group A patients was longer than those of the group B patients. The total dose of follicle-stimulating hormone (FSH) was significantly lower in the subsequent cycle. The peak value of serum estradiol on human chorionic gonadotrophin (hCG) day was lower in group A as compared with group B. The number of metaphase II oocytes recovered was significantly higher in group B. The cleavage rate in group A was significantly lower than in group B, 49 patients in group B reached embryo transfer stage, while 46 patients in group A reached this stage. Patients in group B received significantly more embryos per transfer as compared with group A. More pregnancies and more clinical pregnancies with fetal heart activity were achieved in group B. Conclusions This comparative trial shows that poor responder women undergoing repeated assisted reproduction treatment using modified super-long down-regulation protocol achieve more oocytes, leading to higher fertilization rate, compared to women receiving routine long protocol. Our study also showed that clinical pregnancy rate was significantly improved. 展开更多
关键词 poor responder controlled ovarian hyperstimulation routine longprotocol modified super-long down-regulation protocol in vitro fertilization
原文传递
贵阳某大型商业复杂结构设计
20
作者 魏丰登 吴强 +1 位作者 贾丽娜 郑康 《建筑结构》 北大核心 2026年第4期107-113,共7页
贵阳某大型商业建筑为平面和竖向均不规则的复杂超限高层建筑,结构平面尺寸约为235m×159m,同时存在扭转不规则、楼板不连续、竖向构件不连续等超限项。结合项目特点介绍了结构基础选型;针对抗震不规则,从概念设计、计算分析、抗震... 贵阳某大型商业建筑为平面和竖向均不规则的复杂超限高层建筑,结构平面尺寸约为235m×159m,同时存在扭转不规则、楼板不连续、竖向构件不连续等超限项。结合项目特点介绍了结构基础选型;针对抗震不规则,从概念设计、计算分析、抗震构造等几个方面采取了优化结构布置、加强计算校核、提高抗震等级等措施,采用性能化设计以确保结构达到预定的抗震性能目标。对工程中重难点如结构超长、大跨人行连桥、室内110m长悬挂螺旋天梯、V形巨柱等进行了深入分析研究,提出了合理的解决方案,包括连桥设置调谐质量阻尼器有效改善舒适度、采用多道支撑结构保证螺旋天梯的整体稳定、通过防倒塌分析确保V形巨柱的结构安全等,并通过工程实践验证了设计的可行性和可靠性。 展开更多
关键词 复杂结构 超限高层建筑 超长结构 大跨结构 超长螺旋天梯 V形巨柱 调谐质量阻尼器 舒适度
在线阅读 下载PDF
上一页 1 2 111 下一页 到第
使用帮助 返回顶部