Subway project involves different links such as preliminary planning, research, design, material procurement, construction, acceptance, production and quality assurance. In the supervision and management, subway engin...Subway project involves different links such as preliminary planning, research, design, material procurement, construction, acceptance, production and quality assurance. In the supervision and management, subway engineering design and construction can better consolidate the construction foundation, and realize the efficiency, coordination and standardization of the overall construction of subway project. In the construction of subway and construction personnel, relevant supervisors and construction personnel should strengthen the deep understanding of the supervision and management of subway projects, improve the management system, accumulate construction experience, improve the quality of subway project management, and achieve the expected economic and social benefits.展开更多
On March 28, 2007, six people were buried by a cave-in at Suzhoujie Station on Line 10 of the Beijing Subway. The fatalities were caused when the unit in charge of construction foiled to implement a timely e-vacuation...On March 28, 2007, six people were buried by a cave-in at Suzhoujie Station on Line 10 of the Beijing Subway. The fatalities were caused when the unit in charge of construction foiled to implement a timely e-vacuation after a construction accident took place. (See Beijing Youth, April 1, 2007) .展开更多
Because subway projects cannot control and protect driving, they mainly rely on the experience of the occupants in the field of maneuvering. Visual cues and t.d. are prone to accidents. To this end, we have developed ...Because subway projects cannot control and protect driving, they mainly rely on the experience of the occupants in the field of maneuvering. Visual cues and t.d. are prone to accidents. To this end, we have developed an intelligent safety monitoring system (ISM) suitable for subway construction machinery. The ISM system consists of four parts: work monitoring subsystem, video subsystem, positioning subsystem and terrestrial radio communication subsystem. Each ISM subsystem of the subway engineering locomotive system, the function of equipment design and operation protection equipment, the relevance and working principle of each ISM subsystem are introduced in detail. The ISM system has the technical characteristics of high integration, high resource utilization, high reliability, knowledge connection and information collaboration. The ISM system is tested on the basis of two vehicles on Shanghai metro line 13, and the system meets the requirements of protection and surveillance.展开更多
With the advancement of the urbanization process, the scale of the city is getting bigger and bigger, and the ground traffic pressure is also increasing, and the underground traffic has been vigorously developed. In t...With the advancement of the urbanization process, the scale of the city is getting bigger and bigger, and the ground traffic pressure is also increasing, and the underground traffic has been vigorously developed. In the construction of subway projects, budget preparation plays an important role in cost control, and effective measures need to be taken to improve the quality of budget preparation. Combined with the characteristics of subway project, this paper analyzes the particularity of subway project budget, analyzes the existing problems, and proposes corresponding optimization strategies to ensure the quality of subway project budget preparation and promote the orderly development of subway project construction.展开更多
文摘Subway project involves different links such as preliminary planning, research, design, material procurement, construction, acceptance, production and quality assurance. In the supervision and management, subway engineering design and construction can better consolidate the construction foundation, and realize the efficiency, coordination and standardization of the overall construction of subway project. In the construction of subway and construction personnel, relevant supervisors and construction personnel should strengthen the deep understanding of the supervision and management of subway projects, improve the management system, accumulate construction experience, improve the quality of subway project management, and achieve the expected economic and social benefits.
文摘On March 28, 2007, six people were buried by a cave-in at Suzhoujie Station on Line 10 of the Beijing Subway. The fatalities were caused when the unit in charge of construction foiled to implement a timely e-vacuation after a construction accident took place. (See Beijing Youth, April 1, 2007) .
文摘Because subway projects cannot control and protect driving, they mainly rely on the experience of the occupants in the field of maneuvering. Visual cues and t.d. are prone to accidents. To this end, we have developed an intelligent safety monitoring system (ISM) suitable for subway construction machinery. The ISM system consists of four parts: work monitoring subsystem, video subsystem, positioning subsystem and terrestrial radio communication subsystem. Each ISM subsystem of the subway engineering locomotive system, the function of equipment design and operation protection equipment, the relevance and working principle of each ISM subsystem are introduced in detail. The ISM system has the technical characteristics of high integration, high resource utilization, high reliability, knowledge connection and information collaboration. The ISM system is tested on the basis of two vehicles on Shanghai metro line 13, and the system meets the requirements of protection and surveillance.
文摘With the advancement of the urbanization process, the scale of the city is getting bigger and bigger, and the ground traffic pressure is also increasing, and the underground traffic has been vigorously developed. In the construction of subway projects, budget preparation plays an important role in cost control, and effective measures need to be taken to improve the quality of budget preparation. Combined with the characteristics of subway project, this paper analyzes the particularity of subway project budget, analyzes the existing problems, and proposes corresponding optimization strategies to ensure the quality of subway project budget preparation and promote the orderly development of subway project construction.