For the test of rotation speed of high spinning projectile, the general formula of the motional electromotive force (MEMF) of planar magnetic induction coil (PMIC) is derived in case of 3D rotation in a stable mag...For the test of rotation speed of high spinning projectile, the general formula of the motional electromotive force (MEMF) of planar magnetic induction coil (PMIC) is derived in case of 3D rotation in a stable magnetic field. Under a reasona-ble assumption, the MEMF of PMIC is simplified after the aforementioned general formula is used to calculate high spinning PMIC in the geomagnetic field environment. The determination approach of half-cycle is discussed and the method of rotation speed test is studied, and a test is conducted in the paper. The rotation speed curve obtained by the approach in this paper is consistent with the curve by telemetry.展开更多
This paper presents the design of software and hardware of Power Test without Disassembling System.The main system is based on the MSP4301232 of TI.Instant Rotational Speed is measured in the test system,Instantaneous...This paper presents the design of software and hardware of Power Test without Disassembling System.The main system is based on the MSP4301232 of TI.Instant Rotational Speed is measured in the test system,Instantaneous Acceleration and Instantaneous Power is calculated by using the feature of the MCU with the Least Square Method.At last,Testing Data and Error Analysis are measured.展开更多
近年来,我国风能资源开发增长迅速,甘肃省风能资源储量在全国名列前茅。为降低风电企业投资的风险,需要对当地多年的风速状况进行评估。文中选用甘肃省79个台站1976年至2010年35年的风速资料,30个台站的历史沿革资料,采用T检验法、SNHT(...近年来,我国风能资源开发增长迅速,甘肃省风能资源储量在全国名列前茅。为降低风电企业投资的风险,需要对当地多年的风速状况进行评估。文中选用甘肃省79个台站1976年至2010年35年的风速资料,30个台站的历史沿革资料,采用T检验法、SNHT(Standard Normal Homogeneity Test)方法及经验正交分解方法(EOF)对甘肃省风速资料进行分析。T检验表明,甘肃省79个站35年的风速资料有3.98%的存在非均一性;资料分析结果表明,甘肃各地风速除陇中及定西部分地区略有上升外,大部分地区风速呈下降趋势,包括风能资源丰富的地区,且下降趋势较明显,其中河西祁连山区风速下降在0.13m/s.10a~0.26m/s.10a之间,河西东部地形平坦区域风速下降在0.13m/s.10a以下;陇南及陇东大部分地区风速下降在0.13m/s.10a以下。甘肃台站风速每十年变化量与本站1976~2010年平均风速比较结果显示:除陇中及定西部分地区风速略有上升,每十年上升在5%~10%之间外,河西祁连山区风速每十年下降在5%~15%之间,河西东部地形平坦区域风速每十年下降在5%以下;陇南及陇东大部分地区风速每十年下降在5%~10%之间。这是今后风电场投资必须要考虑与防范的风险因素之一。展开更多
基金National Key Lab for Electronic Measurement and Technology,North University of China(No.9140C120401080C12)
文摘For the test of rotation speed of high spinning projectile, the general formula of the motional electromotive force (MEMF) of planar magnetic induction coil (PMIC) is derived in case of 3D rotation in a stable magnetic field. Under a reasona-ble assumption, the MEMF of PMIC is simplified after the aforementioned general formula is used to calculate high spinning PMIC in the geomagnetic field environment. The determination approach of half-cycle is discussed and the method of rotation speed test is studied, and a test is conducted in the paper. The rotation speed curve obtained by the approach in this paper is consistent with the curve by telemetry.
文摘This paper presents the design of software and hardware of Power Test without Disassembling System.The main system is based on the MSP4301232 of TI.Instant Rotational Speed is measured in the test system,Instantaneous Acceleration and Instantaneous Power is calculated by using the feature of the MCU with the Least Square Method.At last,Testing Data and Error Analysis are measured.
文摘近年来,我国风能资源开发增长迅速,甘肃省风能资源储量在全国名列前茅。为降低风电企业投资的风险,需要对当地多年的风速状况进行评估。文中选用甘肃省79个台站1976年至2010年35年的风速资料,30个台站的历史沿革资料,采用T检验法、SNHT(Standard Normal Homogeneity Test)方法及经验正交分解方法(EOF)对甘肃省风速资料进行分析。T检验表明,甘肃省79个站35年的风速资料有3.98%的存在非均一性;资料分析结果表明,甘肃各地风速除陇中及定西部分地区略有上升外,大部分地区风速呈下降趋势,包括风能资源丰富的地区,且下降趋势较明显,其中河西祁连山区风速下降在0.13m/s.10a~0.26m/s.10a之间,河西东部地形平坦区域风速下降在0.13m/s.10a以下;陇南及陇东大部分地区风速下降在0.13m/s.10a以下。甘肃台站风速每十年变化量与本站1976~2010年平均风速比较结果显示:除陇中及定西部分地区风速略有上升,每十年上升在5%~10%之间外,河西祁连山区风速每十年下降在5%~15%之间,河西东部地形平坦区域风速每十年下降在5%以下;陇南及陇东大部分地区风速每十年下降在5%~10%之间。这是今后风电场投资必须要考虑与防范的风险因素之一。