期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Seismic hazard analysis for central-western Argentina 被引量:2
1
作者 Salvador Daniel Gregori Rodolfo Christiansen 《Geodesy and Geodynamics》 2018年第1期25-33,共9页
In this study, we present a PSHA(Probabilistic Seismic Hazard Analysis) for the city of San Juan, which is located in the central-western region of Argentina(30°S-35.5°S; 66.5°W-71°W). In addit... In this study, we present a PSHA(Probabilistic Seismic Hazard Analysis) for the city of San Juan, which is located in the central-western region of Argentina(30°S-35.5°S; 66.5°W-71°W). In addition to crustal earthquakes provided by catalogues, recent paleoseismological and neotectonic investigations have permitted to consider events which occurred during the last 400 years.Four seismogenic sources that could cause damages to the studied site corresponding to Precordillera,Western Sierras Pampeanas, Basement of the Cuyana Basin and Cordillera Principal were identified.Based on the evaluation of the contribution of these sources,maximum moment magnitudes above 7.5(Mw) are expected.High values of SA(spectral acceleration)(0.2 and 1 s periods) and PGA(peak ground acceleration) were found in the city of San Juan, which suggests that it is located in a zone of high seismic hazard.Finally, the obtained SA spectra were compared with the seismic-resistant construction standards of Argentina INPRES-CIRSOC 103 [1]. Results suggest that for the city of San Juan and for a return period of475 years, it covers the seismic requirements of the structures. 展开更多
关键词 Probabilistic seismic hazard analysis Seismic-resistant construction standards Seismic sources Visual cumulative method
原文传递
POWER SUPPLY AND DEMAND WILL ASSUME A VERY VIGOROUS SITUTION IN THE LATTER THREE YEARS OF THE 10TH FIVE-YEAR PLAN PERIOD 被引量:1
2
作者 Wu Jingru 《Electricity》 2003年第1期34-38,共5页
The paper analyzes the present situation of power supply and demand based on full and accurate data.Although the electricity generation in 2003 will reach the target of the 10"Five-year Plan,but the scale of powe... The paper analyzes the present situation of power supply and demand based on full and accurate data.Although the electricity generation in 2003 will reach the target of the 10"Five-year Plan,but the scale of power sources construction is severely insufficient.The situation of supply and demand will be very pressing in the latter three years of the 10"Five-year Plan.Therefore,an urgent task is to speedily start constructing a batch of medium and large generation projects. 展开更多
关键词 Load forecast power sources construction power supply and demand
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部