期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Recovery of zinc and lead by simultaneously leaching from lead slag fuming dust with ammonium chloride solution
1
作者 Zhen-biao LI Zhi-mei XIA +3 位作者 Shu-fen LIU Long-gang YE Jing-hao QI Xiong-mei LI 《Transactions of Nonferrous Metals Society of China》 SCIE EI CAS CSCD 2024年第12期4075-4084,共10页
The effects of leaching temperature(60−105°C),NH4Cl concentration(3−7 mol/L),liquid/solid ratio(4:1−12:1 mL/g),stirring speed(150−750 r/min),and leaching time(5−90 min)on the leaching rates of Zn and Pb were inve... The effects of leaching temperature(60−105°C),NH4Cl concentration(3−7 mol/L),liquid/solid ratio(4:1−12:1 mL/g),stirring speed(150−750 r/min),and leaching time(5−90 min)on the leaching rates of Zn and Pb were investigated.The leaching kinetics of Zn-and Pb-rich fuming dust with a NH4Cl solution was also studied.The leaching rates of Zn and Pb respectively reached 98.2%and 75.6%at leaching temperature of 100°C,an NH4Cl concentration of 7.0 mol/L,a liquid/solid ratio of 10:1 mL/g,a stirring speed of 450 r/min and leaching time of 60 min.The kinetics results indicate that the leaching of Zn and Pb conforms to the shrinking unreacted core model and is controlled by the internal diffusion of NH4Cl through the reacted fuming dust layer and external diffusion of NH4Cl through the leaching solution boundary layer,respectively.The apparent activation energies of Zn and Pb are 23.922 and 19.139 kJ/mol,respectively.This study demonstrates that the use of NH4Cl solution,without ammonia,is an environmentally friendly method for simultaneous extracting Zn and Pb from the fuming dust of lead blast furnace slag. 展开更多
关键词 lead blast furnace slag fuming dust ammonium chloride simultaneous leaching kinetics shrinking unreacted core model
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部