期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Risk calculation method for complex engineering system 被引量:2
1
作者 Li-ping WANG Yan-ke ZHANG Chang-ming JI Ji-qing LI 《Water Science and Engineering》 EI CAS 2011年第3期345-355,共11页
This paper presents a rapid and simple risk calculation method for large and complex engineering systems, the simulated maximum entropy method (SMEM), which is based on integration of the advantages of the Monte Car... This paper presents a rapid and simple risk calculation method for large and complex engineering systems, the simulated maximum entropy method (SMEM), which is based on integration of the advantages of the Monte Carlo and maximum entropy methods, thus avoiding the shortcoming of the slow convergence rate of the Monte Carlo method in risk calculation. Application of SMEM in the calculation of reservoir flood discharge risk shows that this method can make full use of the known information under the same conditions and obtain the corresponding probability distribution and the risk value. It not only greatly improves the speed, compared with the Monte Carlo method, but also provides a new approach for the risk calculation in large and complex engineering systems. 展开更多
关键词 simulated maximum entropy method risk calculation Monte Carlo method complex engineering system
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部