Analysis on the Construction Technology of Metro Shield Method
1
作者 DONG Zhicheng LYU Hewei +1 位作者 CHEN Tongxu SUN Qiang 《外文科技期刊数据库(文摘版)工程技术》 2021年第12期1205-1209,共8页
With the development of economy, the construction of subway project has also speeded up. Because the subway transportation mode has the advantages of large load and less pollution, it has become the main way to solve ... With the development of economy, the construction of subway project has also speeded up. Because the subway transportation mode has the advantages of large load and less pollution, it has become the main way to solve the transportation problem in large and medium-sized cities. The risk management of urban rail transit project is very important because of its huge investment. Compared with the traditional construction method, the shield construction of metro section tunnels has many advantages, but there are also some disadvantages in the shield construction, such as large investment in equipment and so on, which often lead to various risks due to uncertain factors. Based on this, the paper discusses the construction technology of metro shield method. 展开更多
关键词 subway construction shield method construction technique
原文传递
Risk identification and risk mitigation during metro station construction by enlarging shield tunnel combined with cut-and-cover method 被引量:3
2
作者 Zhang, Xinjin Liu, Weining Lu, Meili 《Journal of Southeast University(English Edition)》 EI CAS 2008年第S1期142-146,共5页
Constructing a metro station by enlarging shield tunnels combined with a mining/cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a n... Constructing a metro station by enlarging shield tunnels combined with a mining/cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a new-style construction method, there are several specific risks involved in the construction process. Based on the test section of Sanyuanqiao station on Beijing metro line 10, and combined with the existing methods of risk identification at present, including a review of world-wide operational experience of similar projects, the study of generic guidance on hazards associated with the type of work being undertaken, and discussions with qualified and experienced staff from the project team, etc., the specific risks during the construction process of the metro station constructed by enlarging shield tunnels combined with the cut-and-cover method are identified. The results show that the specific risks mainly come from three construction processes which include constructing upper enclosure structures, excavating the soil between shield tunnels and demolishing shield segments. Then relevant risk mitigation measures are put forward. The results can provide references for scheme improvement and a comprehensive risk assessment of the new-style construction method. 展开更多
关键词 shield tunnel cut-and-cover method metro station risk identification risk mitigation
在线阅读 下载PDF
General analytical method of designing shielded coils for arbitrary axial magnetic field
3
作者 Yi Zhang Yu-Jiao Li +3 位作者 Qi-Yuan Jiang Zhi-Guo Wang Tao Xia and Hui Luo 《Chinese Physics B》 SCIE EI CAS CSCD 2019年第11期134-139,共6页
Magnetic coils for specific requirements are widely used in modern quantum physics. In this study, a general analytical method of designing the shielded coils for generating an arbitrary axial magnetic field is propos... Magnetic coils for specific requirements are widely used in modern quantum physics. In this study, a general analytical method of designing the shielded coils for generating an arbitrary axial magnetic field is proposed. The theoretical formula for an axial magnetic field generated by a single shielded coil is obtained and used to construct specific coils. The structural parameters of these coils are determined by fitting the theoretical formula with their specific requirements. The feasibility of this method is proved by realizing four concrete kinds of coils: uniform magnetic field generating coils, gradient magnetic field generating coils, asymmetrical uniform magnetic field generating coils, and parabolic magnetic field generating coils. The correctness of these theoretical results is demonstrated by both the finite element simulations and the relevant experimental results. Furthermore, the application of this method is of great significance for developing the quantum physics and quantum devices in future. 展开更多
关键词 MAGNETIC coils ANALYTICAL method shieldING QUANTUM DEVICE
原文传递
机械法联络通道施工参数全局敏感性影响分析 被引量:1
4
作者 马永政 郑义 +3 位作者 朱瑶宏 周汪 牛富生 黄强 《隧道建设(中英文)》 北大核心 2025年第1期98-108,共11页
为研究机械法联络通道多种施工参数对隧道结构及周围地层环境的影响效应,采用基于Sobol理论的全局敏感性分析方法,建立精细化表达隧道结构及施工辅助设施设计特征的有限元数值模型,结合全施工过程数值模拟试验及监测分析验证,开展施工... 为研究机械法联络通道多种施工参数对隧道结构及周围地层环境的影响效应,采用基于Sobol理论的全局敏感性分析方法,建立精细化表达隧道结构及施工辅助设施设计特征的有限元数值模型,结合全施工过程数值模拟试验及监测分析验证,开展施工参数全局敏感性影响分析。结果表明:1)破洞施工使得主隧道最大变形位移相比施工前增加约34%,最大应力水平增加15.5%,接触界面膜应力增加5%~8%,内支撑体系应力水平为-12~40 MPa,施工完成后有一定程度的回弹或减少;2)被切削环开洞口附近应力变形变化较明显,管环横截面内外边缘主应力Ⅲ分布曲线呈纺锤形等几何特征;3)地表位移和隧道变形的计算结果与相应监测值的平均值曲线及变化趋势接近,验证了数值模型结果的合理性;4)针对应力变形相关的不同施工响应目标指标,各施工参数如土舱压力、顶推力、刀盘转矩以及内支撑预应力等的敏感度大小排序各异,通过探讨敏感度最大的土舱压力参数对螺栓组轴力的影响规律特征,得出其影响安全可控。 展开更多
关键词 盾构法 联络通道 数值模拟 位移监测 施工参数 全局敏感性分析
在线阅读 下载PDF
地铁盾构区间机械法联络通道施工全过程正线隧道力学响应分析 被引量:2
5
作者 杜明芳 赵洁 +4 位作者 易领兵 张鹏 王宗勇 任方毅 朱行通 《城市轨道交通研究》 北大核心 2025年第3期6-13,共8页
[目的]机械法联络通道施工对地铁正线隧道管片结构内力的影响较大,需要探明正线隧道结构在施工过程中的受力变化规律、受力薄弱点等情况,以保证正线隧道结构安全。[方法]以郑州某地铁盾构区间联络通道机械法顶管施工工程为背景,采用ABA... [目的]机械法联络通道施工对地铁正线隧道管片结构内力的影响较大,需要探明正线隧道结构在施工过程中的受力变化规律、受力薄弱点等情况,以保证正线隧道结构安全。[方法]以郑州某地铁盾构区间联络通道机械法顶管施工工程为背景,采用ABAQUS有限元软件建立了数值计算模型,对联络通道顶管施工全过程进行了仿真分析,研究施工过程中正线隧道结构变形及内力变化规律。通过比较仿真值与实测值的变化趋势及发生位置,验证了该数值模型的可靠性。[结果及结论]实测值与仿真值的变化趋势、发生位置基本一致,有限元模型具有准确性。施工过程中,切削环最大变形值呈逐渐增大趋势,始发端切削环弯矩最大值呈先增加后减小趋势,接收端切削环弯矩最大值呈先缓慢减小后增加趋势,切削环轴力最大值呈缓慢增加趋势。施工完成时的最大变形值和内力值均在设计允许范围内。 展开更多
关键词 地铁 盾构区间 机械法联络通道施工 力学响应
在线阅读 下载PDF
盾构接收涌水涌砂隧道受损冻结法加固修复与实测分析 被引量:1
6
作者 杨平 吴朝阳 +2 位作者 杨琼鹏 李卫 丁宇浩 《隧道建设(中英文)》 北大核心 2025年第4期804-815,共12页
为修复因盾构接收突发涌水涌砂导致的双线隧道受损工程,采取双线隧道分离式布孔、同期冻结的修复方案,即一期垂直冻结明挖+二期水平冻结暗挖。针对2期工程中垂直钻孔、暗挖对接隧道等施工重难点,提出关键工艺:1)垂直钻孔时采取先隧道外... 为修复因盾构接收突发涌水涌砂导致的双线隧道受损工程,采取双线隧道分离式布孔、同期冻结的修复方案,即一期垂直冻结明挖+二期水平冻结暗挖。针对2期工程中垂直钻孔、暗挖对接隧道等施工重难点,提出关键工艺:1)垂直钻孔时采取先隧道外加固再钻孔施工,先金刚石钻头钻孔取芯再改为回转式钻进泥浆护壁的方法;2)暗挖时破损管片区和完好管片区采用2种开挖方式,对破损管片区采取全断面开挖,对完好管片区采取先开挖至封堵墙再拆除管片的方法。然后,对2期冻结全过程进行温度、变形监测,分析冻结温度场发展规律以及地表和建筑物沉降变化规律,并与常规洞门冻结工程对比。结果表明:1)冻土区与渗漏处热交换对测点冻结效果的影响大于冻结孔偏斜的影响;2)在扰动地层左右线同期水平冻结时,左右线相邻冻结管处易发生冻结管断裂现象;3)地层扰动大的修复工程中,水平冻结积极冻结期较长;4)因回填土松散且有空洞,水平冻结钻孔施工阶段的地表沉降大于暗挖阶段。 展开更多
关键词 盾构隧道 人工冻结法 加固及修复
在线阅读 下载PDF
高准确度电流比较仪研制及校验方法研究 被引量:1
7
作者 王维 刘夏 +1 位作者 黄璐 杨雁 《计量学报》 北大核心 2025年第1期112-118,共7页
介绍一种新型高准确度电流比较仪的结构及工作原理,提出了“屏蔽定向引流”线路结构。该结构可基本消除二次绕组容性泄漏误差,并可消除二次绕组各段组合使用时引入的附加误差,提高了电流比较仪的准确度。在电流比率5 A/5 A~5000 A/5 A... 介绍一种新型高准确度电流比较仪的结构及工作原理,提出了“屏蔽定向引流”线路结构。该结构可基本消除二次绕组容性泄漏误差,并可消除二次绕组各段组合使用时引入的附加误差,提高了电流比较仪的准确度。在电流比率5 A/5 A~5000 A/5 A范围内,达到的技术指标优于1×10-6。结合“屏蔽定向引流”线路结构的特点,进一步提出了多比率电流比较仪自校准方法,其校准不确定度优于2×10^(-7)。该校准方法准确度高,稳定性好,操作简单,耗时短,可有效解决过去长期困扰的互感器长途运输送检问题。 展开更多
关键词 电学计量 电流比例 电流比较仪 屏蔽定向引流 自校准方法
在线阅读 下载PDF
超大直径盾构隧道联络通道冻结法施工交界面温度场研究——以北京东六环改造工程冻结联络通道为例 被引量:3
8
作者 李明 王磊 +3 位作者 崔灏 陈红蕾 孙长松 杨哲 《隧道建设(中英文)》 北大核心 2025年第2期352-360,共9页
为研究超大直径盾构隧道联络通道冻结法施工中的交界面温度场,以及冻结管非循环段长度等因素对土体与管片交界面冻结壁厚度的影响,以北京东六环超大直径盾构隧道盾构段联络通道冻结施工为背景,采用现场实测和数值模拟的方法,对土体与管... 为研究超大直径盾构隧道联络通道冻结法施工中的交界面温度场,以及冻结管非循环段长度等因素对土体与管片交界面冻结壁厚度的影响,以北京东六环超大直径盾构隧道盾构段联络通道冻结施工为背景,采用现场实测和数值模拟的方法,对土体与管片交界面温度场及交界面冻结壁厚度等进行分析。结果表明:1)冻结过程中冻结管前部的非循环段长度会显著影响交界面处的冻结效果,交界面冻结壁厚度随非循环段长度增加而减小;在北京东六环工况下,冻结管间距为1 m时,非循环段长度达到450 mm冻结壁无法在56 d内闭合。2)单排管叠加冻结能显著提高交界面的冻结壁厚度及冻结管容许最大非循环段长度,而等管距的环形单圈冻结同直线单排管冻结无明显差距。3)冻结交界面为弧形时,交界面冻结壁厚度较管片为平面时有显著增加;非循环段长度为300 mm时,上壁厚度比平面管片增加了15%,下壁和侧壁则增加了35%,可以认为管片弧度对交界面冻结有利。4)冻结壁与隧道管片交界面是冻结壁的薄弱位置,在冻结施工中应尽量减小非循环段长度,并重点关注交界面处的温度变化,积极冻结及开挖过程中应对交界面位置做好保温,防止施工过程中交界面位置化冻引起地下水击穿冻结壁,造成涌水涌砂事故。 展开更多
关键词 冻结法 超大直径盾构隧道 界面温度场 联络通道 数值模拟
在线阅读 下载PDF
硬质岩层盾构掘进引起国保单位白塔振动预测与控制技术 被引量:2
9
作者 蔡袁强 谢况琴 +5 位作者 袁宗浩 孙宏磊 黄勇 曹秒凤 曹志刚 梁旭 《岩土工程学报》 北大核心 2025年第5期1064-1072,共9页
硬质岩层盾构掘进施工引起的环境振动会对邻近文物建筑产生不利影响。针对硬质岩层盾构掘进振源特性复杂和文物保护单位容许振动指标严苛的难题,基于之江路输水管廊隧道近距离侧穿白塔工程,系统介绍了一种基于实测与模拟相结合的振动反... 硬质岩层盾构掘进施工引起的环境振动会对邻近文物建筑产生不利影响。针对硬质岩层盾构掘进振源特性复杂和文物保护单位容许振动指标严苛的难题,基于之江路输水管廊隧道近距离侧穿白塔工程,系统介绍了一种基于实测与模拟相结合的振动反分析法,在此基础上开展了硬岩地层盾构掘进引起白塔振动响应预测分析,并分别从盾构施工参数和PVC空心减振屏障两方面进行白塔减隔振技术研究。结论如下:硬质岩层盾构掘进振源主要由盾构掘进过程中的刀盘转动、滚刀切削坚硬岩体诱发;盾构施工参数中掘进速度与振动响应表现出较好的相关性,降低盾构机掘进速度,振动响应全频段显著下降;PVC空心桩对中高频段具有较好的减振效果,在白塔范围内平均减振率可达50%。 展开更多
关键词 硬质岩层 盾构掘进 振动反分析 白塔 放大效应 PVC空心桩
原文传递
An Improved Method for Correction of Air Temperature Measured Using Different Radiation Shields
10
作者 CHENG Xinghong SU Debin +6 位作者 LI Deping CHEN Lu XU Wenjing YANG Meilin LI Yongcheng YUE Zhizhong WANG Zijing 《Advances in Atmospheric Sciences》 SCIE CAS CSCD 2014年第6期1460-1468,共9页
The variation of air temperature measurement errors using two different radiation shields (DTR502B Vaisala,Finland,and HYTFZ01,Huayun Tongda Satcom,China) was studied.Datasets were collected in the field at the Daxi... The variation of air temperature measurement errors using two different radiation shields (DTR502B Vaisala,Finland,and HYTFZ01,Huayun Tongda Satcom,China) was studied.Datasets were collected in the field at the Daxing weather station in Beijing from June 2011 to May 2012.Most air temperature values obtained with these two commonly used radiation shields were lower than the reference records obtained with the new Fiber Reinforced Polymers (FRP) Stevenson screen.In most cases,the air temperature errors when using the two devices were smaller on overcast and rainy days than on sunny days; and smaller when using the imported rather than the Chinese shield.The measured errors changed sharply at sunrise and sunset,and reached maxima at noon.Their diurnal variation characteristics were,naturally,related to changes in solar radiation.The relationships between the record errors,global radiation,and wind speed were nonlinear.An improved correction method was proposed based on the approach described by Nakamura and Mahrt (2005) (NM05),in which the impact of the solar zenith angle (SZA) on the temperature error is considered and extreme errors due to changes in SZA can be corrected effectively.Measurement errors were reduced significantly after correction by either method for both shields.The error reduction rate using the improved correction method for the Chinese and imported shields were 3.3% and 40.4% higher than those using the NM05 method,respectively. 展开更多
关键词 radiation shield measurement error impacts of solar zenith angle improved correction method
在线阅读 下载PDF
铁路隧道工程大直径盾构掘进造价分析研究
11
作者 曾志长 《铁路工程技术与经济》 2025年第4期48-53,共6页
随着铁路的大发展,盾构技术在铁路穿城过江运用越来越广泛,掘进断面也越来越大,但目前铁路隧道定额中尚无洞身直径>12m的大直径泥水平衡盾构掘进定额。为了使设计预算编制有适用的定额标准,真实的反映社会平均水平,对大直径盾构掘进... 随着铁路的大发展,盾构技术在铁路穿城过江运用越来越广泛,掘进断面也越来越大,但目前铁路隧道定额中尚无洞身直径>12m的大直径泥水平衡盾构掘进定额。为了使设计预算编制有适用的定额标准,真实的反映社会平均水平,对大直径盾构掘进定额的施工工序进行分解,采用现场实测法和施工资料统计法对样本隧道大直径盾构掘进人工、材料、机械等进行测定,提出了盾构机的机械台班费用定额以及不同地层下盾构掘进预算定额,量化直径>12m大直径泥水平衡盾构掘进对工程造价的影响,并以佛莞城际铁路盾构掘进成本为例进行分析,论证盾构掘进预算定额的合理性。 展开更多
关键词 铁路隧道 盾构法 大直径盾构 盾构定额 造价
在线阅读 下载PDF
联络通道采用盾构法施工对双线盾构隧道结构影响监测分析
12
作者 逯建栋 宋彦杰 +5 位作者 张美琴 周胜 熊田芳 耿佳 程雪松 张雨明 《市政技术》 2025年第7期197-205,共9页
为了探究盾构法联络通道施工对双线地铁隧道衬砌结构的影响,依托天津地铁某盾构法联络通道项目开展了现场施工监测,通过分析盾构机施工掘进的数据,对双线盾构隧道结构的位移、收敛和管片受力响应进行了研究分析,并得出了施工期间盾构机... 为了探究盾构法联络通道施工对双线地铁隧道衬砌结构的影响,依托天津地铁某盾构法联络通道项目开展了现场施工监测,通过分析盾构机施工掘进的数据,对双线盾构隧道结构的位移、收敛和管片受力响应进行了研究分析,并得出了施工期间盾构机掘进与隧道结构响应规律。研究结果表明:1)盾构法联络通道施工会使始发端主隧道产生较大的水平位移,最大水平位移值出现在右侧拱腰处,主隧道受盾构机顶推力和切削力的影响,水平向内收敛,垂直向外收敛,呈现出水平向椭圆形,破洞会对始发端主隧道造成较大的影响。2)钢套筒自身强度较高,施工过程中其最大位移值较小;监测部位的主筋应力和混凝土应变均处于安全范围内;联络通道管片位移值和收敛值均较小,处于安全范围内。 展开更多
关键词 双线盾构隧道 联络通道 盾构法 施工监测 结构响应
在线阅读 下载PDF
基坑连续破坏对邻近盾构隧道影响研究
13
作者 郑刚 韩思佳 +5 位作者 孙基斌 程雪松 刘永超 张雁 任东帅 骆天逸 《岩土工程学报》 北大核心 2025年第S2期1-6,共6页
基坑垮塌触发既有邻近隧道破坏的灾变机理等相关问题亟待深化研究。针对基坑垮塌对相邻隧道结构的影响进行研究,首先建立了基于耦合欧拉-拉格朗日(CEL)方法的数值模型,研究了不同位置条件下基坑垮塌对邻近盾构隧道不同结构的影响。结果... 基坑垮塌触发既有邻近隧道破坏的灾变机理等相关问题亟待深化研究。针对基坑垮塌对相邻隧道结构的影响进行研究,首先建立了基于耦合欧拉-拉格朗日(CEL)方法的数值模型,研究了不同位置条件下基坑垮塌对邻近盾构隧道不同结构的影响。结果表明:①基坑产生局部破坏后,相邻隧道结构的荷载模式发生改变,隧道结构产生向基坑靠近和整体沉降的过量变形,隧道结构中部分接头的内力超过相应的承载能力,对隧道结构的安全状态造成威胁;②既有隧道与基坑距离越近对结构安全性能的影响越大,且隧道埋深越浅隧道接头受破坏程度越严重,位于隧道结构底部的接头工作性能受影响最大;③在实际工程中,应将基坑破坏对隧道产生的不利影响传播路径进行隔断,可以考虑对土体进行加固或者增加隔离措施。 展开更多
关键词 基坑破坏 盾构隧道 耦合欧拉-拉格朗日方法 影响规律
原文传递
考虑土拱效应的盾构隧道施工地表沉降预测 被引量:4
14
作者 胡达 肖超 +4 位作者 梁小强 孔纲强 黎永索 蒋磊 杨仙 《工程地质学报》 北大核心 2025年第2期783-793,共11页
城市地铁盾构隧道施工时,其上覆土体会产生应力转移和位移传递,为准确预测深埋盾构隧道施工过程中引起的地表沉降,基于能量法考虑“土拱效应”影响下的地层损失计算模型,开展了盾构施工地表沉降预测方法研究。首先,综合考虑隧道施工方... 城市地铁盾构隧道施工时,其上覆土体会产生应力转移和位移传递,为准确预测深埋盾构隧道施工过程中引起的地表沉降,基于能量法考虑“土拱效应”影响下的地层损失计算模型,开展了盾构施工地表沉降预测方法研究。首先,综合考虑隧道施工方法及“土拱效应”等因素,对Loganathan公式进行优化改进,采用Terzaghi理论计算土拱作用下的土体回弹变形,建立考虑土拱效应的圆形盾构隧道施工地表沉降预测模型;其次,基于弹性Maxwell-Betti功互换定理,考虑圆形盾构隧道衬砌支护作用,通过构建两组不同受力状态下的弹性力学模型计算模型,推导出能量法理论下隧道施工引起的地层损失理论解析式;最后,针对5个典型盾构隧道工程案例进行对比研究和预测分析。结果表明:考虑土拱效应的预测方法更加有效,预测结果更接近实际监测沉降值,验证了该方法在盾构隧道工程中具有较好的适应性和可靠性。 展开更多
关键词 盾构隧道 能量法 地表沉降 土拱效应 地层损失
在线阅读 下载PDF
超大直径隧道机械法横通道施工下的结构响应 被引量:1
15
作者 郑镇跡 谢典延 +2 位作者 邱桐 苏栋 陈湘生 《铁道科学与工程学报》 北大核心 2025年第7期3194-3207,共14页
为揭示机械法横通道施工全过程对超大直径盾构隧道结构的力学扰动机制,以广州海珠湾隧道区间横通道工程为例,详细介绍国内首个机械法横通道与超大直径盾构主隧道同步施工的工艺设计。在此基础上,进一步建立精细化的三维仿真模型并结合... 为揭示机械法横通道施工全过程对超大直径盾构隧道结构的力学扰动机制,以广州海珠湾隧道区间横通道工程为例,详细介绍国内首个机械法横通道与超大直径盾构主隧道同步施工的工艺设计。在此基础上,进一步建立精细化的三维仿真模型并结合现场实测数据验证,深入分析横通道机械顶管法施工全过程对超大直径盾构隧道结构体系的力学扰动特性。研究结果表明:预制箱涵在顶进过程中产生了向靠背侧3.1 mm的水平附加变形;破洞后,钢套筒在洞门上下全切环与两侧半切环接缝处出现局部应力集中,最大应力达266.3 MPa;施工过程中,主隧道管片受力和变形均表现出显著的阶段性变化:顶切阶段,反力架上部传力构件处管片出现约3.06 MPa的局部拉应力,同时该处正弯矩增至670.9 kN·m;破洞及拆撑完成后,洞门两侧应力集中现象明显,最大压应力增至22.91 MPa。此外,切削侧负弯矩减少54.1%;施工过程中,全切环管片轴力逐步下降,最终拱顶轴力损失46.3%、切削侧几乎降至0,而半切环拱顶和拱腰轴力却增加20.85%和36.5%;通道破洞施工导致主隧道各部位变形增大,拱顶变形增幅为26.7%~50.1%,而靠背侧及切削侧分别增大11.9%~43.6%、28.1%~65.9%。研究结果为理解机械顶管法横通道施工对超大直径盾构隧道的影响机理提供重要的依据,并为今后同类工程的设计与施工提供参考。 展开更多
关键词 超大直径 盾构隧道 机械法 横通道 结构响应
在线阅读 下载PDF
盾构隧道抗震可恢复性能指标研究
16
作者 董正方 李宗源 +3 位作者 曾繁凯 张继康 李乐意 张敏 《河南大学学报(自然科学版)》 北大核心 2025年第3期337-346,378,共11页
为了研究隧道的抗震可恢复性,提出适用于隧道的抗震可恢复验算方法.采用剩余抗震能力比曲线的积分面积量化方法中的抗震可恢复性能指标,并用直径变形率、地基倾斜角、弯矩比和Park-Ang指标作为结构的变形、强度和耗能评价指标.选取结构... 为了研究隧道的抗震可恢复性,提出适用于隧道的抗震可恢复验算方法.采用剩余抗震能力比曲线的积分面积量化方法中的抗震可恢复性能指标,并用直径变形率、地基倾斜角、弯矩比和Park-Ang指标作为结构的变形、强度和耗能评价指标.选取结构形式、场地类别、地震波、土层厚度和结构埋深等5个影响盾构隧道抗震性能的因素,设置18个工况;采用修正IDA法进行增量动力分析,建立土—结构相互作用模型,以地震动峰值加速度作为地震动强度参数(IM),以选取的性能指标作为结构性能参数(DM),得到42条IDA曲线.对计算结果进行数理统计分析,综合考虑多种因素,得到盾构隧道各指标屈服点和倒塌点限值分布范围,给出了不同抗震性能水平下各指标限值的建议值. 展开更多
关键词 隧道工程 盾构隧道 抗震可恢复性 增量动力分析法 性能指标
原文传递
考虑随机场的地铁致地表振动概率密度演化分析
17
作者 郑中元 杜牧青 刘新源 《兰州理工大学学报》 北大核心 2025年第1期116-122,共7页
地基土作为地铁运行振动波传播的重要媒介,土壤性质的空间变异性对振动响应有重要影响.以往的车致环境振动研究中,地基土常选用为确定性参数,本文将随机场理论引入到土壤性质变化的动力分析中,对地基土横截面进行参数随机性赋值,基于概... 地基土作为地铁运行振动波传播的重要媒介,土壤性质的空间变异性对振动响应有重要影响.以往的车致环境振动研究中,地基土常选用为确定性参数,本文将随机场理论引入到土壤性质变化的动力分析中,对地基土横截面进行参数随机性赋值,基于概率密度演化理论对盾构隧道内地铁列车引起的环境振动开展研究,获得了地表振动响应的上下限和概率密度分布信息.结果表明:土体随机特性对地表振动位移和加速度的标准差影响显著,距离轨道中心线距离越近,土体随机场的干扰越小,振动位移和加速度的概率密度分布越集中;土体随机场使得地表振动响应呈现出正态分布特性;地表振动响应的最大值出现在地铁列车经行的中间时刻. 展开更多
关键词 概率密度演化理论 随机场 地基土 盾构隧道 地铁
在线阅读 下载PDF
盾构隧道施工诱发邻近单桩的振动响应规律
18
作者 赵广资 李克金 +3 位作者 李春林 仇晖 马悦 汪优 《隧道建设(中英文)》 北大核心 2025年第2期295-303,共9页
为了探究盾构施工引起的不同桩-隧间距下的单桩动力响应规律,依托济南地铁4号线某工区,采用离散元与有限差分耦合法(DEM-FDM),结合现场实测数据,建立隧道结构-土体-桩二维动力耦合模型。利用DEM模拟岩土材料的特性,结合FDM对混凝土结构... 为了探究盾构施工引起的不同桩-隧间距下的单桩动力响应规律,依托济南地铁4号线某工区,采用离散元与有限差分耦合法(DEM-FDM),结合现场实测数据,建立隧道结构-土体-桩二维动力耦合模型。利用DEM模拟岩土材料的特性,结合FDM对混凝土结构的高效动力计算,模拟距隧道18 m范围内不同桩-隧间距下的单桩动力响应工况,并对盾构施工振动时程数据和频谱特征进行监测与分析。研究结果表明:1)盾构隧道施工引起的邻近桩振动响应随桩-隧间距的增加呈现出幂函数或指数型衰减规律,其中,桩顶的衰减较不显著,桩底及与隧道同埋深的部位衰减较为显著;2)基于桩-隧间距的不同,影响范围可分为强影响范围(<3 m)、中强影响范围(3~9 m)、中弱影响范围(9~12 m)、弱影响范围(>12 m)4部分;3)随着桩-隧距离的增加,振动信号中的高频成分逐渐消失,而低频成分则能够传播较远距离,仍会引起桩的伴随振动;4)盾构施工振动产生的能量90%以上集中在0~64 Hz,低频段振动对结构的影响更加显著。 展开更多
关键词 硬岩地层 盾构隧道 施工振动 离散元与有限差分耦合 桩-隧间距 动力响应
在线阅读 下载PDF
Settlement characteristics of large-diameter shield excavation below existing subway in close vicinity 被引量:34
19
作者 FANG Qian DU Jian-ming +2 位作者 LI Jian-ye ZHANG Ding-li CAO Li-qiang 《Journal of Central South University》 SCIE EI CAS CSCD 2021年第3期882-897,共16页
A case of Qinghuayuan tunnel excavation below the existing Beijing Subway Line 10 is presented.The new Qinghuayuan tunnel,part of the Beijing-Zhangjiakou High-speed Railway,was excavated by a shield machine with an ou... A case of Qinghuayuan tunnel excavation below the existing Beijing Subway Line 10 is presented.The new Qinghuayuan tunnel,part of the Beijing-Zhangjiakou High-speed Railway,was excavated by a shield machine with an outer diameter of 12.2 m.The existing subway was excavated by shallow tunnelling method.The project layout,geological conditions,reinforcement measures,operational parameters of shield machine and monitoring results of the project are introduced.During the Qinghuayuan tunnel excavation below the existing subway,total thrust,shield driving speed,cutterhead rotation speed and torque were manually controlled below the average values obtained from the previous monitoring of this project,which could effectively reduce the disturbance of the surrounding soil induced by shield excavation.The Gaussian fitting function can appropriately fit both the ground and the existing subway settlements.The trough width is influenced not only by the excavation overburden depth,but also by the forepoling reinforcement and tail void grouting measures. 展开更多
关键词 adjacent excavation shield method operational parameters settlement characteristics
在线阅读 下载PDF
基于蒙特卡罗几何分裂减方差技巧的AB-BNCT治疗室屏蔽模拟分析 被引量:2
20
作者 朱益楠 林作康 +1 位作者 郁海燕 余笑寒 《核技术》 北大核心 2025年第1期59-67,共9页
硼中子俘获治疗(Boron Neutron Capture Therapy,BNCT)是一种新型二元靶向放射疗法,目前正在逐步进入商用阶段。适用于医院的BNCT中子源类型为加速器中子源,在设备运行与患者的治疗过程中,通常会伴随中子的泄漏与γ射线的污染。为了保... 硼中子俘获治疗(Boron Neutron Capture Therapy,BNCT)是一种新型二元靶向放射疗法,目前正在逐步进入商用阶段。适用于医院的BNCT中子源类型为加速器中子源,在设备运行与患者的治疗过程中,通常会伴随中子的泄漏与γ射线的污染。为了保证医用基于加速器的BNCT(Accelerator-Based Boron Neutron Capture Therapy,AB-BNCT)设备运行过程中相关人员的辐射安全,基于束流强度10 mA、能量2.8 MeV的质子中子源AB-BNCT开展屏蔽设计分析。首先以国际放射防护委员会(International Commission on Radiological Protection,ICRP)与我国现行的电离辐射防护与辐射源安全基本标准GB 18871-2002制定的公众年有效剂量限值1 mSv为参考标准,经保守估计折合成剂量率限值0.5μSv·h^(-1),利用蒙特卡罗程序进行BNCT治疗室屏蔽模拟计算分析;通过对比使用减方差技巧前后的屏蔽模拟数据结果,论证了使用几何分裂与俄罗斯轮盘赌等减方差技巧可以有效提高计算效率,获得更精确的计算结果。在模拟分析的数据基础上,给出了该AB-BNCT治疗室的屏蔽设计方案,并针对屏蔽的薄弱环节进行优化设计。最终的优化结果表明,当屏蔽墙体为60 cm的含硼重混凝土时,治疗室外侧空间的剂量率均小于0.5μSv·h^(-1),满足辐射防护要求。此外,本文也给出了剂量限值小于2.5μSv·h^(-1)时所需屏蔽墙体的厚度范围,为BNCT的商业化发展提供理论依据。 展开更多
关键词 硼中子俘获治疗 屏蔽设计 蒙特卡罗方法 减方差
原文传递