期刊文献+
共找到267篇文章
< 1 2 14 >
每页显示 20 50 100
Scheduling a three-machine no-wait flowshop with separated setup time 被引量:1
1
作者 常俊林 邵惠鹤 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2006年第2期206-210,共5页
In many practical flowshop production environments, there is no intermediate storage space available to keep partially completed jobs between any two machines. The workflow has to be continuous, implying that the no-w... In many practical flowshop production environments, there is no intermediate storage space available to keep partially completed jobs between any two machines. The workflow has to be continuous, implying that the no-wait conditions must be abided, which is typical in steel and plastic production. We discuss the three-machine no-wait flowshop scheduling problem where the setup times are considered as separated from processing times and sequence independent. The scheduling goal is to minimize the total flowtime. An optimal property and two heuristic algorithms for this problem are proposed. Evaluated over a large number of problems, the proposed heuristics are found that they can yield good solutions effectively with low computational complexity, and have more obvious advantage for the large size problem compared with the existing one. 展开更多
关键词 three-machine flowshop setup time NO-WAIT total flow time
在线阅读 下载PDF
Hybrid Flow Shop with Setup Times Scheduling Problem
2
作者 Mahdi Jemmali Lotfi Hidri 《Computer Systems Science & Engineering》 SCIE EI 2023年第1期563-577,共15页
The two-stage hybridflow shop problem under setup times is addressed in this paper.This problem is NP-Hard.on the other hand,the studied problem is modeling different real-life applications especially in manufacturing... The two-stage hybridflow shop problem under setup times is addressed in this paper.This problem is NP-Hard.on the other hand,the studied problem is modeling different real-life applications especially in manufacturing and high performance-computing.Tackling this kind of problem requires the development of adapted algorithms.In this context,a metaheuristic using the genetic algorithm and three heuristics are proposed in this paper.These approximate solutions are using the optimal solution of the parallel machines under release and delivery times.Indeed,these solutions are iterative procedures focusing each time on a particular stage where a parallel machines problem is called to be solved.The general solution is then a concatenation of all the solutions in each stage.In addition,three lower bounds based on the relaxation method are provided.These lower bounds present a means to evaluate the efficiency of the developed algorithms throughout the measurement of the relative gap.An experimental result is discussed to evaluate the performance of the developed algorithms.In total,8960 instances are implemented and tested to show the results given by the proposed lower bounds and heuristics.Several indicators are given to compare between algorithms.The results illustrated in this paper show the performance of the developed algorithms in terms of gap and running time. 展开更多
关键词 Hybridflow shop genetic algorithm setup times HEURISTICS lower bound
在线阅读 下载PDF
Identical Machine Scheduling Problem with Sequence-Dependent Setup Times: MILP Formulations Computational Study
3
作者 Farouk Yalaoui Nhan Quy Nguyen 《American Journal of Operations Research》 2021年第1期15-34,共20页
This work aims to give a systematic construction of the two families of mixed-integer-linear-programming (MILP) formulations, which are graph-<span style="font-family:;" "=""> </span&... This work aims to give a systematic construction of the two families of mixed-integer-linear-programming (MILP) formulations, which are graph-<span style="font-family:;" "=""> </span><span style="font-family:Verdana;">based and sequence-based, of the well-known scheduling problem<img src="Edit_41010f25-7ca5-482c-89be-790fad4616e1.png" alt="" /></span><span style="font-family:Verdana;text-align:justify;">. Two upper bounds of job completion times are introduced. A numerical test result analysis is conducted with a two-fold objective 1) testing the performance of each solving methods, and 2) identifying and analyzing the tractability of an instance according to the instance structure in terms of the number of machines, of the jobs setup time lengths and of the jobs release date distribution over the scheduling horizon.</span> <div> <span style="font-family:Verdana;text-align:justify;"><br /> </span> </div> 展开更多
关键词 Identical Machine Scheduling Problem Release Date Sequence Dependent setup time
在线阅读 下载PDF
A Linear Programming Approach for Parallel Cell Scheduling with Sequence-Dependent Setup Times
4
作者 Tugba Yildiz Besim TurkerOzalp +2 位作者 Ilker Kucukoglu Alkın Yurtkuran Nursel Ozturk 《American Journal of Operations Research》 2014年第3期155-163,共9页
In this study, we consider the problem of scheduling a set of jobs with sequence-dependent setup times on a set of parallel production cells. The objective of this study is to minimize the total completion time. We no... In this study, we consider the problem of scheduling a set of jobs with sequence-dependent setup times on a set of parallel production cells. The objective of this study is to minimize the total completion time. We note that total customer demands for each type should be satisfied, and total required production time in each cell cannot exceed the capacity of the cell. This problem is formulated as an integer programming model and an interface is designed to provide integrity between data and software. Mathematical model is tested by both randomly generated data set and real-world data set from a factory that produce automotive components. As a result of this study, the solution which gives the best alternative production schedule is obtained. 展开更多
关键词 Production Scheduling Total Completion time Sequence Dependent setup times
暂未订购
A Hybrid Estimation of Distribution Algorithm for Unrelated Parallel Machine Scheduling with Sequence-Dependent Setup Times 被引量:7
5
作者 Ling Wang Shengyao Wang Xiaolong Zheng 《IEEE/CAA Journal of Automatica Sinica》 SCIE EI 2016年第3期235-246,246+236-245,共12页
A hybrid estimation of distribution algorithm (EDA) with iterated greedy (IG) search (EDA-IG) is proposed for solving the unrelated parallel machine scheduling problem with sequence-dependent setup times (UPMSP-SDST).... A hybrid estimation of distribution algorithm (EDA) with iterated greedy (IG) search (EDA-IG) is proposed for solving the unrelated parallel machine scheduling problem with sequence-dependent setup times (UPMSP-SDST). For makespan criterion, some properties about neighborhood search operators to avoid invalid search are derived. A probability model based on neighbor relations of jobs is built in the EDA-based exploration phase to generate new solutions by sampling the promising search region. Two types of deconstruction and reconstruction as well as an IG search are designed in the IG-based exploitation phase. Computational complexity of the algorithm is analyzed, and the effect of parameters is investigated by using the Taguchi method of design-of-experiment. Numerical tests on 1640 benchmark instances are carried out. The results and comparisons demonstrate the effectiveness of the EDA-IG. Especially, the bestknown solutions of 531 instances are updated. In addition, the effectiveness of the properties is also demonstrated by numerical comparisons. © 2014 Chinese Association of Automation. 展开更多
关键词 BENCHMARKING Computational complexity Design of experiments MACHINERY OPTIMIZATION SCHEDULING Taguchi methods
在线阅读 下载PDF
Single Machine Scheduling with Time-Dependent Learning Effect and Non-Linear Past-Sequence-Dependent Setup Times 被引量:1
6
作者 Yuling Yeh Chinyao Low Wen-Yi Lin 《Journal of Applied Mathematics and Physics》 2015年第1期10-15,共6页
This paper studies a single machine scheduling problem with time-dependent learning and setup times. Time-dependent learning means that the actual processing time of a job is a function of the sum of the normal proces... This paper studies a single machine scheduling problem with time-dependent learning and setup times. Time-dependent learning means that the actual processing time of a job is a function of the sum of the normal processing times of the jobs already scheduled. The setup time of a job is proportional to the length of the already processed jobs, that is, past-sequence-dependent (psd) setup time. We show that the addressed problem remains polynomially solvable for the objectives, i.e., minimization of the total completion time and minimization of the total weighted completion time. We also show that the smallest processing time (SPT) rule provides the optimum sequence for the addressed problem. 展开更多
关键词 Scheduling time-DEPENDENT Learning setup time Past-Sequence-Dependent Total COMPLETION time
暂未订购
No-Wait Flowshops to Minimize Total Tardiness with Setup Times 被引量:1
7
作者 Tariq Aldowaisan Ali Allahverdi 《Intelligent Control and Automation》 2015年第1期38-44,共7页
The m-machine no-wait flowshop scheduling problem is addressed where setup times are treated as separate from processing times. The objective is to minimize total tardiness. Different dispatching rules have been inves... The m-machine no-wait flowshop scheduling problem is addressed where setup times are treated as separate from processing times. The objective is to minimize total tardiness. Different dispatching rules have been investigated and three were found to be superior. Two heuristics, a simulated annealing (SA) and a genetic algorithm (GA), have been proposed by using the best performing dispatching rule as the initial solution for SA, and the three superior dispatching rules as part of the initial population for GA. Moreover, improved versions of SA and GA are proposed using an insertion algorithm. Extensive computational experiments reveal that the improved versions of SA and GA perform about 95% better than SA and GA. The improved version of GA outperforms the improved version of SA by about 3.5%. 展开更多
关键词 NO-WAIT FLOWSHOP Scheduling setup timeS Total TARDINESS Simulated ANNEALING Genetic Algorithm
暂未订购
An Improved Ant Colony Algorithm for a Single-machine Scheduling Problem with Setup Times
8
作者 YE Qiang LIU Xinbao LIU Lin YANG Shanglin School of Management,Hefei University of Technology,Hefei 230009,China, 《武汉理工大学学报》 CAS CSCD 北大核心 2006年第S3期956-961,共6页
Motivated by industrial applications we study a single-machine scheduling problem in which all the jobs are mutu- ally independent and available at time zero.The machine processes the jobs sequentially and it is not i... Motivated by industrial applications we study a single-machine scheduling problem in which all the jobs are mutu- ally independent and available at time zero.The machine processes the jobs sequentially and it is not idle if there is any job to be pro- cessed.The operation of each job cannot be interrupted.The machine cannot process more than one job at a time.A setup time is needed if the machine switches from one type of job to another.The objective is to find an optimal schedule with the minimal total jobs’completion time.While the sum of jobs’processing time is always a constant,the objective is to minimize the sum of setup times.Ant colony optimization(ACO)is a meta-heuristic that has recently been applied to scheduling problem.In this paper we propose an improved ACO-Branching Ant Colony with Dynamic Perturbation(DPBAC)algorithm for the single-machine schedul- ing problem.DPBAC improves traditional ACO in following aspects:introducing Branching Method to choose starting points;im- proving state transition rules;introducing Mutation Method to shorten tours;improving pheromone updating rules and introduc- ing Conditional Dynamic Perturbation Strategy.Computational results show that DPBAC algorithm is superior to the traditional ACO algorithm. 展开更多
关键词 DPBAC ALGORITHM ANT COLONY optimization ALGORITHM SINGLE-MACHINE SCHEDULING problem setup time
在线阅读 下载PDF
Two-Stage Adaptive Memetic Algorithm with Surprisingly Popular Mechanism for Energy-Aware Distributed Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup Time 被引量:2
9
作者 Feng Chen Cong Luo +1 位作者 Wenyin Gong Chao Lu 《Complex System Modeling and Simulation》 EI 2024年第1期82-108,共27页
This paper considers the impact of setup time in production scheduling and proposes energy-aware distributed hybrid flow shop scheduling problem with sequence-dependent setup time(EADHFSP-ST)that simultaneously optimi... This paper considers the impact of setup time in production scheduling and proposes energy-aware distributed hybrid flow shop scheduling problem with sequence-dependent setup time(EADHFSP-ST)that simultaneously optimizes the makespan and the energy consumption.We develop a mixed integer linear programming model to describe this problem and present a two-stage adaptive memetic algorithm(TAMA)with a surprisingly popular mechanism.First,a hybrid initialization strategy is designed based on the two optimization objectives to ensure the convergence and diversity of solutions.Second,multiple population co-evolutionary approaches are proposed for global search to escape from traditional cross-randomization and to balance exploration and exploitation.Third,considering that the memetic algorithm(MA)framework is less efficient due to the randomness in the selection of local search operators,TAMA is proposed to balance the local and global searches.The first stage accumulates more experience for updating the surprisingly popular algorithm(SPA)model to guide the second stage operator selection and ensures population convergence.The second stage gets rid of local optimization and designs an elite archive to ensure population diversity.Fourth,five problem-specific operators are designed,and non-critical path deceleration and right-shift strategies are designed for energy efficiency.Finally,to evaluate the performance of the proposed algorithm,multiple experiments are performed on a benchmark with 45 instances.The experimental results show that the proposed TAMA can solve the problem effectively. 展开更多
关键词 distributed hybrid flow shop setup time multiple population ENERGY-AWARE memetic algorithm surprisingly popular algorithm
原文传递
Neighborhood Combination Search for Single-Machine Scheduling with Sequence-Dependent Setup Time
10
作者 刘晓路 徐宏云 +3 位作者 陈嘉铭 苏宙行 吕志鹏 丁俊文 《Journal of Computer Science & Technology》 SCIE EI CSCD 2024年第3期737-752,共16页
In a local search algorithm,one of its most important features is the definition of its neighborhood which is crucial to the algorithm's performance.In this paper,we present an analysis of neighborhood combination... In a local search algorithm,one of its most important features is the definition of its neighborhood which is crucial to the algorithm's performance.In this paper,we present an analysis of neighborhood combination search for solv-ing the single-machine scheduling problem with sequence-dependent setup time with the objective of minimizing total weighted tardiness(SMSWT).First,We propose a new neighborhood structure named Block Swap(B1)which can be con-sidered as an extension of the previously widely used Block Move(B2)neighborhood,and a fast incremental evaluation technique to enhance its evaluation efficiency.Second,based on the Block Swap and Block Move neighborhoods,we present two kinds of neighborhood structures:neighborhood union(denoted by B1UB2)and token-ring search(denoted by B1→B2),both of which are combinations of B1 and B2.Third,we incorporate the neighborhood union and token-ring search into two representative metaheuristic algorithms:the Iterated Local Search Algorithm(ILSnew)and the Hybrid Evolutionary Algorithm(HEA_(new))to investigate the performance of the neighborhood union and token-ring search.Exten-sive experiments show the competitiveness of the token-ring search combination mechanism of the two neighborhoods.Tested on the 120 public benchmark instances,our HEA_(new)has a highly competitive performance in solution quality and computational time compared with both the exact algorithms and recent metaheuristics.We have also tested the HEA,new algorithm with the selected neighborhood combination search to deal with the 64 public benchmark instances of the single-machine scheduling problem with sequence-dependent setup time.HEAnew is able to match the optimal or the best known results for all the 64 instances.In particular,the computational time for reaching the best well-known results for five chal-lenging instances is reduced by at least 61.25%. 展开更多
关键词 single-machine scheduling sequence-dependent setup time neighborhood combination search token-ring search hybrid evolutionary algorithm
原文传递
THE MIMIc QUEUE WITH (e, d) SETUP TIME 被引量:1
11
作者 Xiuli XU Naishuo TIAN 《Journal of Systems Science & Complexity》 SCIE EI CSCD 2008年第3期446-455,共10页
The authors present a new queueing model with (e, d) setup time. Using the quasi-birth-and-death process and matrix-geometric method, the authors obtain the stationary distribution of queue length and the LST of wai... The authors present a new queueing model with (e, d) setup time. Using the quasi-birth-and-death process and matrix-geometric method, the authors obtain the stationary distribution of queue length and the LST of waiting time of a customer in the system. Furthermore, the conditional stochastic decomposition results of queue length and waiting time are given. 展开更多
关键词 Conditional stochastic decomposition (e d) policy matrix-geometric method setup time
原文传递
AN IMPROVED BRANCH-AND-BOUND ALGORITHM TO MINIMIZE THE WEIGHTED FLOWTIME ON IDENTICAL PARALLEL MACHINES WITH FAMILY SETUP TIMES
12
作者 Belgacem BETTAYEB Imed KACEM Kondo H.ADJALLAH 《Journal of Systems Science and Systems Engineering》 SCIE EI CSCD 2008年第4期446-459,共14页
This article investigates identical parallel machines scheduling with family setup times. The objective function being the weighted sum of completion times, the problem is known to be strongly NP-hard. We propose a co... This article investigates identical parallel machines scheduling with family setup times. The objective function being the weighted sum of completion times, the problem is known to be strongly NP-hard. We propose a constructive heuristic algorithm and three complementary lower bounds. Two of these bounds proceed by elimination of setup times or by distributing each of them to jobs of the corresponding family, while the third one is based on a lagrangian relaxation. The bounds and the heuristic are incorporated into a branch-and-bound algorithm. Experimental results obtained outperform those of the methods presented in previous works, in term of size of solved problems. 展开更多
关键词 SCHEDULING HEURISTIC lower bound branch-and-bound algorithm identical parallel machines family setup times
原文传递
On a BMAP/G/1 G-queue with Setup Times and Multiple Vacations
13
作者 Yi PENG Xiang-qun YANG 《Acta Mathematicae Applicatae Sinica》 SCIE CSCD 2011年第4期625-638,共14页
In this paper, we consider a BMAP/G/1 G-queue with setup times and multiple vacations. Arrivals of positive customers and negative customers follow a batch Markovian arrival process (BMAP) and Markovian arrival proc... In this paper, we consider a BMAP/G/1 G-queue with setup times and multiple vacations. Arrivals of positive customers and negative customers follow a batch Markovian arrival process (BMAP) and Markovian arrival process (MAP) respectively. The arrival of a negative customer removes all the customers in the system when the server is working. The server leaves for a vacation as soon as the system empties and is allowed to take repeated (multiple) vacations. By using the supplementary variables method and the censoring technique, we obtain the queue length distributions. We also obtain the mean of the busy period based on the renewal theory. 展开更多
关键词 G-queues batch Markovian arrival process (BMAP) setup times multiple vacations censoring technique Markov chains
原文传递
多因素柔性作业车间绿色调度的改进进化算法
14
作者 王建华 吴传宇 许莉萍 《计算机应用》 北大核心 2025年第6期1954-1962,共9页
针对考虑设置与运输时间约束且机器加工速度可变的多因素柔性作业车间绿色调度问题(MFJGSP-STVS),构建以完工时间与能源消耗为优化目标的数学模型,并提出一种改进的多目标进化算法(EMoEA)求解该问题。该算法采用三层整数编码方式,在解... 针对考虑设置与运输时间约束且机器加工速度可变的多因素柔性作业车间绿色调度问题(MFJGSP-STVS),构建以完工时间与能源消耗为优化目标的数学模型,并提出一种改进的多目标进化算法(EMoEA)求解该问题。该算法采用三层整数编码方式,在解码中使用机器空闲时间优先(MIP)规则和开关机策略(TOF)优化目标,利用全局搜索(GS)等启发式规则生成初始种群;为了加快算法收敛,基于非支配分层思想设计一种聚类交叉方式;为防止算法过早收敛而陷入局部最优,采用衍生策略扩散非支配解集,通过基于关键路径的自适应局部搜索策略进一步强化算法探索解空间的能力。仿真实验结果表明,与原始的多目标进化算法相比,EMoEA中的每个设计都有更优的超体积(HV)与逆世代距离(IGD)指标;与非支配排序遗传算法(NSGA-Ⅱ)和混合Jaya(HJaya)算法相比,EMoEA在HV与IGD这2个指标上占据优势,且收敛较快,在大多数实例中都获得最优的目标值。可见,EMoEA性能更好,能有效地解决MFJGSP-STVS,为企业提供高质量的调度方案。 展开更多
关键词 设置与运输时间 机器可变加工速度 柔性作业车间绿色调度 聚类交叉 衍生策略 自适应局部搜索
在线阅读 下载PDF
可见情形下带有启动时间的流体休假排队系统的均衡策略研究
15
作者 张怡通 徐秀丽 岳德权 《运筹与管理》 北大核心 2025年第7期229-234,I0100-I0104,共11页
针对在大数据技术背景下,如何动态控制连续数据和信息的快速传输从而实现社会利益最大化这一问题,本文从经济学的角度研究带有启动期和工作休假期的流体排队模型中顾客的止步策略及社会最优收益等问题。基于完全可见和几乎可见两种信息... 针对在大数据技术背景下,如何动态控制连续数据和信息的快速传输从而实现社会利益最大化这一问题,本文从经济学的角度研究带有启动期和工作休假期的流体排队模型中顾客的止步策略及社会最优收益等问题。基于完全可见和几乎可见两种信息水平,依据流体在缓冲期内的平均逗留时间构建个体平均净收益,进而揭示流体的纳什均衡行为规律。运用更新过程理论,全概率分解技术和常微分方程组的标准型理论,结合流体水平在外部随机环境下的动态变化规律和边界条件导出排队系统稳态下的主要性能指标,研究服务系统的优化设计问题。为保证社会福利最大化,探究最优服务定价策略,利用数值算例对P2P网络中资源传输过程进行仿真分析,进一步优化网络节点运行中的激活时长和排队拥塞等问题,研究结果可为复杂网络服务系统的管理调控提供理论指导和实践参考。 展开更多
关键词 流体排队 启动时间 工作休假 止步策略 均衡分析
在线阅读 下载PDF
考虑异构AGV的柔性作业车间集成调度
16
作者 李文贵 姚友杰 李新宇 《计算机集成制造系统》 北大核心 2025年第5期1539-1554,共16页
柔性作业车间中因产品尺寸和形状的差异导致需要多种功能异构的AGV进行运输。然而,现有研究主要关注同构AGV,未充分考虑异构AGV对运输调度的影响。针对考虑异构AGV和机器顺序相关准备时间的柔性作业车间生产与物流集成调度问题,提出了... 柔性作业车间中因产品尺寸和形状的差异导致需要多种功能异构的AGV进行运输。然而,现有研究主要关注同构AGV,未充分考虑异构AGV对运输调度的影响。针对考虑异构AGV和机器顺序相关准备时间的柔性作业车间生产与物流集成调度问题,提出了一种基于变邻域搜索的改进遗传算法(IGA-VNS)以最小化最大返回时间(maximum return time)。研究引入基于任务的三层编码方法和主动解码策略,利用遗传操作进行全局搜索,并针对关键路径上加工和运输任务块设计了3种局部搜索邻域结构。同时,针对调度解包含多条关键路径的情况,提出解的比较准则以增强局部搜索效果。最后,通过与其他有效算法在实例上的对比验证了所提方法的有效性,并分析了异构AGV和AGV数量对调度结果的影响。 展开更多
关键词 柔性作业车间 异构AGV 集成调度 顺序相关准备时间 关键路径
在线阅读 下载PDF
考虑序列相关准备时间的多条阻塞混流装配线排序问题研究
17
作者 李梦琪 董绍华 《机电工程》 北大核心 2025年第10期1948-1959,共12页
为解决某防爆机器人企业当前存在的装配线拥堵、生产效率低等问题,在传统混流装配线排序问题的基础上,对考虑序列相关准备时间的多条阻塞混流装配线的排序问题(MBMMALSP-SDST)进行了研究。首先,以最小化最大完工时间和最小化总换装时间... 为解决某防爆机器人企业当前存在的装配线拥堵、生产效率低等问题,在传统混流装配线排序问题的基础上,对考虑序列相关准备时间的多条阻塞混流装配线的排序问题(MBMMALSP-SDST)进行了研究。首先,以最小化最大完工时间和最小化总换装时间为优化目标,建立了双目标数学模型;然后,采用基于Pareto的改进人工蜂群算法(IPABC)对上述模型进行了求解,算法采用了基于装配线的二维编码方式,在初始化阶段采用混合启发式规则生成了初始蜂群。在蜂群的各个阶段分别采用邻域搜索、改进优先操作交叉、破坏重建策略等方式对解空间进行了探索;最后,以某防爆机器人企业为案例,针对考虑序列相关准备时间的多阻塞混流装配线的排序问题,将IPABC算法与改进遗传算法(INSGA-II)、改进蚁群算法(IACO)等的求解结果进行了比较。研究结果表明:IPABC算法相比于对比算法在目标1的平均优化率为16.26%,在目标2的平均优化率为18.73%,IPABC算法具有较好的收敛性和支配性。该实验结果验证了IPABC算法在求解多条混流装配线排序问题时具有一定的优越性。 展开更多
关键词 多混流装配线排序 双目标优化 基于Pareto的改进人工蜂群算法 改进非支配排序遗传算法 改进蚁群算法 考虑序列相关准备时间的多条阻塞混流装配线的排序问题
在线阅读 下载PDF
改进IG求解分布式混合零空闲流水车间问题
18
作者 彭智杰 赵海霞 +2 位作者 房玉良 付善昭 韩相锋 《计算机与数字工程》 2025年第8期2239-2245,共7页
针对分布式混合零空闲流水车间调度问题(distributed mixed no-idle permutation flowshop scheduling problem,DMNIPFSP),同时考虑各工厂具有不同的顺序相关的准备时间,即各工厂准备时间的异构性,以最小化最大完工时间为优化目标,提出... 针对分布式混合零空闲流水车间调度问题(distributed mixed no-idle permutation flowshop scheduling problem,DMNIPFSP),同时考虑各工厂具有不同的顺序相关的准备时间,即各工厂准备时间的异构性,以最小化最大完工时间为优化目标,提出一种两阶段迭代贪婪算法(TIG)。首先,初始化阶段由改进的启发式方法和基于工件块插入的局部搜索组成;其次,结合异构性的特点,重新设计了破坏和重建算子;提出的变邻域下降搜索策率和第二阶段IG来强调对解空间细致深入的局部开发能力;最后,为摆脱局部最优解,采用由四种方式组成的重启机制。在不同规模的算例下对所比较算法进行测试,结果表明所提出的启发式方法和TIG在求解DMNIPFSP时可提供更好的解决方案。 展开更多
关键词 分布式混合零空闲流水车间 两阶段迭代贪婪算法 准备时间 异构 局部搜索 重启机制
在线阅读 下载PDF
Ensemble Artificial Bee Colony Algorithm and Q-Learning for Multi- Objective Distributed Heterogeneous Flowshop Scheduling Problems with Sequence-Dependent Setup Time
19
作者 Fubin Liu Kaizhou Gao +1 位作者 Adam Slowik Ponnuthurai Nagaratnam Suganthan 《Complex System Modeling and Simulation》 2025年第3期221-235,共15页
As the global economy develops and people's awareness of environmental protection increases,the efficient scheduling of production lines in workshops has received more and more attention.However,there is very litt... As the global economy develops and people's awareness of environmental protection increases,the efficient scheduling of production lines in workshops has received more and more attention.However,there is very little research focusing on distributed scheduling for heterogeneous factories.This study addresses a multi-objective distributed heterogeneous permutation flow shop scheduling problem with sequence-dependent setup times(DHPFSP-SDST).The objective is to optimize the trade-off between the maximum completion time(Makespan)and total energy consumption.First,to describe the concerned problems,we establish a mathematical model.Second,we use the artificial bee colony(ABC)algorithm to optimize the two objectives,incorporating five local search strategies tailored to the problem characteristics to enhance the algorithm's performance.Third,to improve the convergence speed of the algorithm,a Q-learning based strategy is designed to select the appropriated local search operator during iterations.Finally,based on experiments conducted on 72 instances,statistical analysis and discussions show that the Q-learning based ABC algorithm can effectively solve the problems better than its peers. 展开更多
关键词 artificial bee colony algorithm Q-learning flowshop scheduling sequence-dependent setup time
原文传递
Time-dependent water permeation behavior of concrete under constant hydraulic pressure
20
作者 Fang Yonghao Wang Zhongli Zhou Yue 《Water Science and Engineering》 EI CAS 2008年第4期61-66,共6页
In the present work, a concrete permeability testing setup was designed to study the behavior of hydraulic concrete subjected to constant hydraulic pressure. The results show that when concrete is subjected to high en... In the present work, a concrete permeability testing setup was designed to study the behavior of hydraulic concrete subjected to constant hydraulic pressure. The results show that when concrete is subjected to high enough constant hydraulic pressure, it will be permeated, and after it reaches its maximum permeation rate, the permeability coefficient will gradually decrease towards a stable value. A time-dependent model of permeability coefficient for concrete subjected to hydraulic pressure is proposed. It is indicated that the decrease of the permeability coefficient with permeation time conforms well to the negative-exponential decrease model. 展开更多
关键词 CONCRETE PERMEABILITY permeability testing setup time-dependent model
在线阅读 下载PDF
上一页 1 2 14 下一页 到第
使用帮助 返回顶部