The existing 2D settlement monitoring systems for utility tunnels are heavily reliant on manual interpretation of deformation data and empirical predictionmodels.Consequently,early anomalies(e.g.,minor cracks)are ofte...The existing 2D settlement monitoring systems for utility tunnels are heavily reliant on manual interpretation of deformation data and empirical predictionmodels.Consequently,early anomalies(e.g.,minor cracks)are often misjudged,and warnings lag by about 24 h without automated spatial localization.This study establishes a technical framework for requirements analysis,architectural design,and data-integration protocols.Revit parametric modelling is used to build a 3D tunnel model with structural elements,pipelines and 18 monitoring points(for displacement and joint width).Custom Revit API code integrated real-time sensor data into the BIM platform via an automated pipeline.The system achieved a spatial accuracy of±1 mm in locating deformation hotspots.Notifications are triggered within 10 s of anomaly detection,and the system renders 3D risk propagation paths in real-time.Realtime 3D visualization of risk propagation paths is also facilitated.The efficacy of the solution was validated in a Ningbo utility tunnel project,where it was demonstrated that it eliminates human-dependent judgment errors and reduces warning latency by 99.9%compared to conventional methods.The BIM-IoT integrated approach,which enables millimetre-level precision in risk identification and near-instantaneous response,establishes a new paradigm for intelligent infrastructure safety management.展开更多
To ensure the safety of buildings surrounding foundation pits, a study was made on a settlement monitoring and trend prediction method. A statistical testing method for analyzing the stability of a settlement monitori...To ensure the safety of buildings surrounding foundation pits, a study was made on a settlement monitoring and trend prediction method. A statistical testing method for analyzing the stability of a settlement monitoring datum has been discussed. According to a comprehensive survey, data of 16 stages at operating control point, were verified by a standard t test to determine the stability of the operating control point. A stationary auto-regression model, AR(p), used for the observation point settlement prediction has been investigated. Given the 16 stages of the settlement data at an observation point, the applicability of this model was analyzed. Settlement of last four stages was predicted using the stationary auto-regression model AR (1); the maximum difference between predicted and measured values was 0.6 mm, indicating good prediction results of the model. Hence, this model can be applied to settlement predictions for buildings surrounding foundation pits.展开更多
A new measurement technique is used to determine the settlement of bridge pile foundation and the thickness of deep compressed soft layer. The finite element Plaxis 3D foundation program is used in the analysis with a...A new measurement technique is used to determine the settlement of bridge pile foundation and the thickness of deep compressed soft layer. The finite element Plaxis 3D foundation program is used in the analysis with a proposed empirical equation to modify the input parameters represented by the soil compression modulus. The results of the numerical analysis using the proposed empirical equation provide insight to the settlement analysis of pile groups in soft clayey soils; consequently, the finite element Plaxis 3D program can be a useful tool for numerical analysis. The numerical analysis is modified by adjusting the calculation of compression modulus from those obtained under pressure between 100-200 kPa by which the results of the settlement are modified and thus matching the realistic measurements. The absolute error is 3 mm which is accepted compared with the last researches. This scenario can be applied for the similar problems in the theoretical applications of deep foundations.展开更多
Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determi...Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determinant conditions of settlement were proposed simultaneously,taking Beijing—Tianjin intercity railway as an example.展开更多
基金supported by the Scientific Research Projects of the Education Department of Zhejiang Province(Grant No.Y202454744)the Ningbo Public Welfare Science and Technology Project(Grant No.2024S077)+1 种基金International Sci-tech Cooperation Projects under the“Innovation Yongjiang 2035”Key R&D Programme(No.2024H019)the Ningbo Key R&D Program(Grant No.2024Z287).
文摘The existing 2D settlement monitoring systems for utility tunnels are heavily reliant on manual interpretation of deformation data and empirical predictionmodels.Consequently,early anomalies(e.g.,minor cracks)are often misjudged,and warnings lag by about 24 h without automated spatial localization.This study establishes a technical framework for requirements analysis,architectural design,and data-integration protocols.Revit parametric modelling is used to build a 3D tunnel model with structural elements,pipelines and 18 monitoring points(for displacement and joint width).Custom Revit API code integrated real-time sensor data into the BIM platform via an automated pipeline.The system achieved a spatial accuracy of±1 mm in locating deformation hotspots.Notifications are triggered within 10 s of anomaly detection,and the system renders 3D risk propagation paths in real-time.Realtime 3D visualization of risk propagation paths is also facilitated.The efficacy of the solution was validated in a Ningbo utility tunnel project,where it was demonstrated that it eliminates human-dependent judgment errors and reduces warning latency by 99.9%compared to conventional methods.The BIM-IoT integrated approach,which enables millimetre-level precision in risk identification and near-instantaneous response,establishes a new paradigm for intelligent infrastructure safety management.
基金Project 50279005 supported by the National Natural Science Foundation of China
文摘To ensure the safety of buildings surrounding foundation pits, a study was made on a settlement monitoring and trend prediction method. A statistical testing method for analyzing the stability of a settlement monitoring datum has been discussed. According to a comprehensive survey, data of 16 stages at operating control point, were verified by a standard t test to determine the stability of the operating control point. A stationary auto-regression model, AR(p), used for the observation point settlement prediction has been investigated. Given the 16 stages of the settlement data at an observation point, the applicability of this model was analyzed. Settlement of last four stages was predicted using the stationary auto-regression model AR (1); the maximum difference between predicted and measured values was 0.6 mm, indicating good prediction results of the model. Hence, this model can be applied to settlement predictions for buildings surrounding foundation pits.
基金Project(SWJT11ZT04)supported by the Central College Foundation of ChinaProject(2008g032-A)supported by the Major Projects S&T Foundation of China’s Ministry of Railways,China
文摘A new measurement technique is used to determine the settlement of bridge pile foundation and the thickness of deep compressed soft layer. The finite element Plaxis 3D foundation program is used in the analysis with a proposed empirical equation to modify the input parameters represented by the soil compression modulus. The results of the numerical analysis using the proposed empirical equation provide insight to the settlement analysis of pile groups in soft clayey soils; consequently, the finite element Plaxis 3D program can be a useful tool for numerical analysis. The numerical analysis is modified by adjusting the calculation of compression modulus from those obtained under pressure between 100-200 kPa by which the results of the settlement are modified and thus matching the realistic measurements. The absolute error is 3 mm which is accepted compared with the last researches. This scenario can be applied for the similar problems in the theoretical applications of deep foundations.
文摘Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determinant conditions of settlement were proposed simultaneously,taking Beijing—Tianjin intercity railway as an example.