期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Image Encryption Application of Chaotic Sequences Incorporating Quantum Keys 被引量:3
1
作者 Bin Ge Hai-Bo Luo 《International Journal of Automation and computing》 EI CSCD 2020年第1期123-138,共16页
This paper proposes an image encryption algorithm LQBPNN(logistic quantum and back propagation neural network)based on chaotic sequences incorporating quantum keys. Firstly, the improved one-dimensional logistic cha... This paper proposes an image encryption algorithm LQBPNN(logistic quantum and back propagation neural network)based on chaotic sequences incorporating quantum keys. Firstly, the improved one-dimensional logistic chaotic sequence is used as the basic key sequence. After the quantum key is introduced, the quantum key is incorporated into the chaotic sequence by nonlinear operation. Then the pixel confused process is completed by the neural network. Finally, two sets of different mixed secret key sequences are used to perform two rounds of diffusion encryption on the confusing image. The experimental results show that the randomness and uniformity of the key sequence are effectively enhanced. The algorithm has a secret key space greater than 2182. The adjacent pixel correlation of the encrypted image is close to 0, and the information entropy is close to 8. The ciphertext image can resist several common attacks such as typical attacks, statistical analysis attacks and differential attacks. 展开更多
关键词 Logistic chaotic system quantum key nonlinear operation sequence performance image encryption algorithm
原文传递
Pareto-Based Complete Local Search and Combined Timetabling for Multi-objective Job Shop Scheduling Problem with No-Wait Constraint 被引量:1
2
作者 杨玉珍 顾幸生 《Journal of Donghua University(English Edition)》 EI CAS 2016年第4期601-609,624,共10页
Job shop scheduling has become the basis and core of advanced manufacturing technology. Various differences exist between academic research and practical production. The majority of previous researches on job shop sch... Job shop scheduling has become the basis and core of advanced manufacturing technology. Various differences exist between academic research and practical production. The majority of previous researches on job shop scheduling problem (JSSP)describe the basic production environment, which have a single objective and limited constraints. However,a practical process of production is characterized by having multiple objectives,no-wait constraint,and limited storage. Thus this research focused on multiobjective,no-wait JSSP. To analyze the problem,it was further divided into two sub-problems, namely, sequencing and timetabling. Hybrid non-order strategy and modified complete local search with memory were used to solve each problem individually. A Pareto-based strategy for performing fitness assessment was presented in this study. Various experiments on benchmark problems proved the feasibility and effectiveness of the proposed algorithm. 展开更多
关键词 Pareto Scheduling scheduling constraints benchmark crossover fitness performing objectives sequencing
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部