期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Design and application of well cementing technology based on the precise managed pressure balancing method in narrow pressure window hole sections
1
作者 Guo Jianhua Zheng Youcheng +3 位作者 Li Wei Li Bin Yuan Bin Xu Bihua 《Natural Gas Industry B》 2020年第3期285-291,共7页
In the Sichuan Basin,the drilling of complex deep and ultradeep wells is restricted by the casing sequence.Multiple pressure systems are usually encountered in the same open hole section,and narrow safety density wind... In the Sichuan Basin,the drilling of complex deep and ultradeep wells is restricted by the casing sequence.Multiple pressure systems are usually encountered in the same open hole section,and narrow safety density window is observed in vertical strata.The application of managed pressure drilling(MPD)technique which is often used in well drilling ensures the safe and efficient drilling,but it also brings about great challenges to the small-gap liner cementing at the lower part.Therefore,it is of great practical significance to research a cementing technology that can not only satisfy the quality requirement of small gap liner cementing,but also ensure the safe cementing in the strata with narrow safety density window.In this paper,a cementing technology based on precise managed pressure balancing method was proposed by referring to the successful application of MPD technique.According to the cementing design,the hydrostatic column pressure of annulusfluid is under-balanced(slightly lower than the formation pore pressure),and then a precise managed pressure drilling device is adopted to produce back pressure through wellhead restriction or apply wellhead compensation pressure,so that the balanced pore pressure can be reached in the process of cementing via the wellhead pressure and theflow friction offluid in the annulus.After the cementing is completed,a certain compensation pressure is applied to the annulus continuously to prevent annulus channeling during waiting on cement caused by insufficient static pressure and slurry weight loss.After this technology was applied to an ultradeep exploration well in the Sichuan Basin,the qualification rate of borehole cementing quality reached 97%,and the well sections with good cementing quality accounted for 76%.In conclusion,this technology needs no additional equipment,and only by virtue of the MPD equipment,it can achieve safe cementing construction and cementing quality improvement under high displacement efficiency. 展开更多
关键词 Narrow safety density window Precise managed pressure LINER CEMENTING Lost cireulation Pressure balancing chuan basin
在线阅读 下载PDF
Application of precise MPD & pressure balance cementing technology 被引量:1
2
作者 Ma Yong Zheng Youcheng +2 位作者 Xu Bingqing Chen Lili Liu Shibin 《Natural Gas Industry B》 2018年第2期162-166,共5页
The precise managed pressure drilling(MPD)technology is mainly used to deal with the difficulties encountered when oil and gas open hole sections with multiple pressure systems and the strata with narrow safety densit... The precise managed pressure drilling(MPD)technology is mainly used to deal with the difficulties encountered when oil and gas open hole sections with multiple pressure systems and the strata with narrow safety density window are drilled through.If its liner cementing is carried out according to the conventional method,lost circulation is inevitable in the process of cementing while the displacement efficiency of smallclearance liner cementing is satisfied.If the positive and inverse injection technology is adopted,the cementing quality cannot meet the requirements of later well test engineering of ultradeep wells.In this paper,the cementing operation ofØ114.3 mm liner in Well Longgang 70 which was drilled in the Jiange structure of the Sichuan Basin was taken as an example to explore the application of the cementing technology based on the precise MPD and pressure balancing method to the cementing of long open-hole sections(as long as 859 m)with both high and low pressures running through multiple reservoirs.On the one hand,the technical measures were taken specifically to ensure the annulus filling efficiency of slurry and the pressure balance in the whole process of cementing.And on the other hand,the annulus pressure balance was precisely controlled by virtue of precise MPD devices and by injecting heavy weight drilling fluids through central pipes,and thus the wellbore pressure was kept steady in the whole process of cementing in the strata with narrow safety density window.It is indicated thatØ114.3 mm liner cementing in this well is good with qualified pressure tests and no channeling emerges at a funnel during the staged density reduction.It is concluded that this method can enhance the liner cementing quality of complex ultradeep gas wells and improve the wellbore conditions for the later safe well tests of high-pressure gas wells. 展开更多
关键词 Ultradeep well Liner cementing Narrow safety density window Precise MPD Pressure balancing method Lost circulation Sichuan Basin Well Longgang 70
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部