期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
Scheduling Rules Based on Gene Expression Programming for Resource-Constrained Project Scheduling Problem 被引量:3
1
作者 贾艳 李晋航 《Journal of Donghua University(English Edition)》 EI CAS 2015年第1期91-96,共6页
In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select... In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select the effective scheduling rules( SRs) which are constructed using the project status and attributes of the activities. SRs are represented by the chromosomes of GEP, and an improved parallel schedule generation scheme( IPSGS) is used to transform the SRs into explicit schedules. The framework of GEP-SR for RCPSP is designed,and the effectiveness of the GEP-SR approach is demonstrated by comparing with other methods on the same instances. 展开更多
关键词 resource-constrained project scheduling problem(rcpsp) gene expression programming(GEP) scheduling rules(SRs)
在线阅读 下载PDF
甲供非商品化资源约束下可中断项目群调度模型 被引量:2
2
作者 李明 徐蓉 +3 位作者 丰景春 陈永战 陆长兵 王龙宝 《系统管理学报》 CSSCI CSCD 北大核心 2023年第3期499-511,共13页
不可更新资源的约束会导致项目群中各合同项目开工延误甚至施工中断。针对不可更新资源受限理论研究存在的局限性,开展了多种甲供非商品化资源(NCRPE)约束下可中断项目群调度问题的研究。首先,由于资源分配多样性会给项目群进度造成不... 不可更新资源的约束会导致项目群中各合同项目开工延误甚至施工中断。针对不可更新资源受限理论研究存在的局限性,开展了多种甲供非商品化资源(NCRPE)约束下可中断项目群调度问题的研究。首先,由于资源分配多样性会给项目群进度造成不确定性影响,围绕项目群工期—延误成本双目标优化模型展开研究,采用改进编码方式的多目标粒子群算法(MOPSO)进行求解,获取项目群的资源分配方案,利用串行调度生成机制(SSGS)得到项目群进度计划;其次,将MOPSO算法和NSGA-II算法进行对比,通过IGD和HV两个指标来衡量MOPSO算法求解该问题的有效性;最后,结合实际案例,对模型进行求解分析。在甲供非商品化资源约束和项目可中断情况下,构建的项目群调度模型能够有效地实现项目群工期和合同项目延误成本的双目标优化。研究成果为业主合理分配NCRPE以及进行项目群调度提供理论依据。 展开更多
关键词 甲供非商品化资源 资源受限项目群调度问题 多目标粒子群算法 项目可中断 项目群
在线阅读 下载PDF
Project Scheduling Using Hybrid Genetic Algorithm with Fuzzy Logic Controller in SCM Environment 被引量:1
3
作者 Mitsuo Gen KwanWoo Kim Genji Yamazaki 《Tsinghua Science and Technology》 SCIE EI CAS 2003年第1期19-29,共11页
In supply chain management (SCM) environment, we consider a resource-constrained project scheduling problem (rcPSP) model as one of advanced scheduling problems considered by a constraint programming technique. We de... In supply chain management (SCM) environment, we consider a resource-constrained project scheduling problem (rcPSP) model as one of advanced scheduling problems considered by a constraint programming technique. We develop a hybrid genetic algorithm (hGA) with a fuzzy logic controller (FLC) to solve the rcPSP which is the well known NP-hard problem. This new approach is based on the design of genetic operators with FLC through initializing the serial method which is superior for a large rcPSP scale. For solving these rcPSP problems, we first demonstrate that our hGA with FLC (flc-hGA) yields better results than several heuristic procedures presented in the literature. We have revealed a fact that flc-hGA has the evolutionary behaviors of average fitness better than hGA without FLC. 展开更多
关键词 resource-constrained project scheduling problem (rcpsp) priority rule method (PRM) hybrid genetic algorithm (hGA) fuzzy logic controller (FLC)
原文传递
考虑生产效率与工艺的资源受限项目调度问题 被引量:4
4
作者 王珩玮 林佳瑞 张建平 《清华大学学报(自然科学版)》 EI CAS CSCD 北大核心 2020年第3期271-277,共7页
多模式资源受限项目调度问题(MRCPSP)是建设项目进度优化问题的重要数学模型。但传统的MRCPSP模型难以同时表征工序时长、成本与资源需求之间的多种关系。为了解决这一问题,该文提出了一种MRCPSP模型,并利用约束规划(CP)对算例进行了求... 多模式资源受限项目调度问题(MRCPSP)是建设项目进度优化问题的重要数学模型。但传统的MRCPSP模型难以同时表征工序时长、成本与资源需求之间的多种关系。为了解决这一问题,该文提出了一种MRCPSP模型,并利用约束规划(CP)对算例进行了求解。该问题模型通过定义生产力函数以及各工序对各类资源总需求的组合表征工序时长、成本以及资源需求之间的关系。经验证,该模型可以模拟施工过程中生产力变化的情况,并允许在优化求解时考虑工艺选择对结果的影响,相比传统的MRCPSP模型,求解结果有更明确的工程含义,具有实际应用价值。 展开更多
关键词 施工进度优化 资源受限项目调度问题(rcpsp) 约束规划(CP) 数学建模
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部