期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
Optimization of Route Repair in Mobile Ad-hoc Network
1
作者 李承 汪为农 《Journal of Shanghai University(English Edition)》 CAS 2004年第2期169-176,共8页
A main shortcoming of mobile Ad-hoc network's reactive routing protocols is the large volume of far-reaching control traffic required to support the route discovery (RD) and route repair (RR) mechanism. Using a ra... A main shortcoming of mobile Ad-hoc network's reactive routing protocols is the large volume of far-reaching control traffic required to support the route discovery (RD) and route repair (RR) mechanism. Using a random mobility model, this paper derives the probability equation of the relative distance (RDIS) between any two mobile hosts in an ad-hoc network. Consequently, combining with average equivalent hop distance (AEHD), a host can estimate the routing hops between itself and any destination host each time the RD/RR procedure is triggered, and reduce the flooding area of RD/RR messages. Simulation results show that this optimized route repair (ORR) algorithm can significantly decrease the communication overhead of RR process by about 35%. 展开更多
关键词 mobile ad-hoc network mobility model routing protocol optimized routing repair
在线阅读 下载PDF
Optimized joint repair effects on damage evolution and arching mechanism of CRTS II slab track under extreme thermal conditions
2
作者 CAI Xiao-pei CHEN Ze-lin +3 位作者 CHEN Bo-jing ZHONG Yang-long ZHOU Rui HUANG Yi-chen 《Journal of Central South University》 2025年第6期2273-2287,共15页
To address the issue of extreme thermal-induced arching in CRTS II slab tracks due to joint damage,an optimized joint repair model was proposed.First,the formula for calculating the safe temperature rise of the track ... To address the issue of extreme thermal-induced arching in CRTS II slab tracks due to joint damage,an optimized joint repair model was proposed.First,the formula for calculating the safe temperature rise of the track was derived based on the principle of stationary potential energy.Considering interlayer evolution and structural crack propagation,an optimized joint repair model for the track was established and validated.Subsequently,the impact of joint repair on track damage and arch stability under extreme temperatures was studied,and a comprehensive evaluation of the feasibility of joint repair and the evolution of damage after repair was conducted.The results show that after the joint repair,the temperature rise of the initial damage of the track structure can be increased by 11℃.Under the most unfavorable heating load with a superimposed temperature gradient,the maximum stiffness degradation index SDEG in the track structure is reduced by about 81.16%following joint repair.The joint repair process could effectively reduce the deformation of the slab arching under high temperatures,resulting in a reduction of 93.96%in upward arching deformation.After repair,with the damage to interfacing shear strength,the track arch increases by 2.616 mm. 展开更多
关键词 CRTS II slab track optimized joint repair arching mechanism temperature load damage initiation and evolution
在线阅读 下载PDF
Risk Based Optimal Inspection and Repair Planning for Ship Structures Subjected to Corrosion Deterioration 被引量:1
3
作者 李典庆 张圣坤 唐文勇 《海洋工程:英文版》 EI 2004年第2期185-196,共12页
A framework of risk based inspection and repair planning was presented to optimize for the ship structures subjected to corrosion deterioration. The planning problem was formulated as an optimization problem where th... A framework of risk based inspection and repair planning was presented to optimize for the ship structures subjected to corrosion deterioration. The planning problem was formulated as an optimization problem where the expected lifetime costs were minimized with a constraint on the minimum acceptable reliability index. The safety margins were established for the inspection events, the repair events and the failure events for ship structures. Moreover, the formulae were derived to calculate failure probabilities and repair probabilities. Based on them, a component subjected to corrosion is investigated for illustration of the process of selecting the optimal inspection and repair strategy. Furthermore, some sensitivity studies were provided. The results show that the optimal inspection instants should take place before the reliability index reaches the minimum acceptable reliability index. The optimal target failure probability is 10 -3 . In addition, a balance can be achieved between the risk cost and total expected inspection and repair costs by means of the risk-based optimal inspection and repair method, which is very effective in selecting the optimal inspection and repair strategy. 展开更多
关键词 RISK inspection and repair optimization corrosion model ship structures
在线阅读 下载PDF
Uncertain multiobjective redundancy allocation problem of repairable systems based on artificial bee colony algorithm 被引量:6
4
作者 Guo Jiansheng Wang Zutong +1 位作者 Zheng Mingfa Wang Ying 《Chinese Journal of Aeronautics》 SCIE EI CAS CSCD 2014年第6期1477-1487,共11页
Based on the uncertainty theory, this paper is devoted to the redundancy allocation problem in repairable parallel-series systems with uncertain factors, where the failure rate, repair rate and other relative coeffici... Based on the uncertainty theory, this paper is devoted to the redundancy allocation problem in repairable parallel-series systems with uncertain factors, where the failure rate, repair rate and other relative coefficients involved are considered as uncertain variables. The availability of the system and the corresponding designing cost are considered as two optimization objectives. A crisp multiobjective optimization formulation is presented on the basis of uncertainty theory to solve this resultant problem. For solving this problem efficiently, a new multiobjective artificial bee colony algorithm is proposed to search the Pareto efficient set, which introduces rank value and crowding distance in the greedy selection strategy, applies fast non-dominated sort procedure in the exploitation search and inserts tournament selection in the onlooker bee phase. It shows that the proposed algorithm outperforms NSGA-II greatly and can solve multiobjective redundancy allocation problem efficiently. Finally, a numerical example is provided to illustrate this approach. 展开更多
关键词 Artificial bee colony algorithm Multiobjective optimization Redundancy allocation problem repairable systems Uncertainty theory
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部