Deformation mechanism and limit support pressure of cutting steel plate during connection between pipes in large spacing using pipe curtain structure method 被引量:1
1
作者 Xiang Liu Rui Zhang +3 位作者 Jun Huang Guang Zhao Qian Fang Annan Jiang 《Underground Space》 SCIE EI CSCD 2024年第5期83-96,共14页
The pipe curtain structure method(PSM)is a novel construction method to control ground deformation strictly.Compared with the traditional pipe-roofing and pipe jacking method,the connection between pipes in large spac... The pipe curtain structure method(PSM)is a novel construction method to control ground deformation strictly.Compared with the traditional pipe-roofing and pipe jacking method,the connection between pipes in large spacings using PSM is widely acknowledged as a unique construction procedure.Further study on this connection procedure is needed to resolve similar cases in that the pipes are inevitably constructed on both sides of existing piles.Cutting the steel plate during the connection procedure is the first step,which is crucial to control the safety and stability of the surrounding environment and existing structures.The deformation mechanism and limit support pressure of the cutting steel plate during the connection between pipes in large spacings are studied in this paper,relying on the undercrossing Yifeng gate tower project of Jianning West Road River Crossing Channel in Nanjing,China.A modified 3D wedge-prism failure model is proposed using the 3D discrete element method.Combined with Terzaghi loose earth pressure theory and the limit equilibrium theory,the analytical solutions for the limit support pressure of the excavation face of the cutting steel plate are derived.The modified 3D wedge-prism failure model and corresponding analytical solutions are categorised into two cases:(a)unilateral cutting scheme,and(b)bilateral cutting scheme.The analytical solutions for the two cases are verified from the numerical simulation and in-situ data and compared with the previous solutions.The comparative analysis between the unilateral and bilateral cutting schemes indicates that the bilateral cutting scheme can be adopted as a priority.The bilateral cutting scheme saves more time and induces less ground deformation than the unilateral one due to the resistance generated from the superimposed wedge.In addition,the parametric sensitivity analysis is carried out using an orthogonal experimental design.The main influencing factors arranged from high to low are the pipe spacing,the cutting size,and the pipe burial depth.The ground deformation increases with the increased cutting size and pipe spacing.The pipe burial depth slightly affects the ground deformation if the other two factors are minor.Cutting steel plates in small sizes,excavating soil under low disturbance,and supporting pipes for high frequency can effectively reduce the ground surface subsidence. 展开更多
关键词 pipe curtain structure method Wedge-prism failure model Limit support pressure Discrete element method Connection between pipes
在线阅读 下载PDF
市政隧道矩形顶管管幕支护结构应用与造价测算——以南京建宁西路过江通道东延工程为实例
2
作者 张晴 汪伟 张雷 《价值工程》 2026年第5期1-4,共4页
随着社会对历史建筑与文化遗址保护要求的日益提升,市政隧道工程矩形顶管管幕支护结构凭借其优势,逐步在市政隧道建设领域获得推广应用。本文以南京建宁西路东延工程新型大断面矩形顶管管幕支护结构为研究对象,系统分析了矩形管幕支护... 随着社会对历史建筑与文化遗址保护要求的日益提升,市政隧道工程矩形顶管管幕支护结构凭借其优势,逐步在市政隧道建设领域获得推广应用。本文以南京建宁西路东延工程新型大断面矩形顶管管幕支护结构为研究对象,系统分析了矩形管幕支护结构及其造价测算方法。研究成果可为类似市政隧道工程的造价估算提供参考,为后续其他市政隧道工程在矩形顶管管幕支护结构方案选择、施工工艺优化以及成本控制等提供经验借鉴。 展开更多
关键词 市政隧道工程 建宁西路东延 矩形顶管管幕支护结构 技术要求及措施 造价测算
在线阅读 下载PDF
回填土地层管幕法超前支护施工技术研究 被引量:3
3
作者 朱树斌 《广州建筑》 2025年第3期8-12,共5页
在复杂地质条件下,管幕法超前支护结构确保了隧道暗挖施工的安全。本文以沿山货运通道核心区一期工程-成渝高速下穿通道项目为工程背景,阐述了管幕法顶管施工中顶进设备安装方法、顶管机纠偏控制措施、顶管进排泥浆装置、触变泥浆类型... 在复杂地质条件下,管幕法超前支护结构确保了隧道暗挖施工的安全。本文以沿山货运通道核心区一期工程-成渝高速下穿通道项目为工程背景,阐述了管幕法顶管施工中顶进设备安装方法、顶管机纠偏控制措施、顶管进排泥浆装置、触变泥浆类型以及管幕顶管施工顺序,提出了管棚注浆浆液配比、注浆压力控制等具体施工参数。研究结果表明,通过优化顶管顶进顺序和触变泥浆配比,施工效率提高了约20%,注浆8 h后地层稳定性显著增强,地表沉降量控制在了5 mm以内,施工安全性显著提升。研究成果可为国内外类似工程施工提供参考。 展开更多
关键词 管幕法 支护结构 顶管 管棚 套拱
在线阅读 下载PDF
高压双管旋喷桩在支护与止水结构衔接处的应用
4
作者 王东峰 刘文祥 +2 位作者 田盾 罗道超 李直 《建筑技术》 2025年第21期2592-2595,共4页
依托广州某机场三期扩建工程的隧道深基坑,针对地质条件复杂、基坑开挖深度大等特点,提出采用分区复合型支护方案。为改善不同支护方式区段衔接处的防水效果,提出在三轴搅拌桩和咬合桩衔接处采用2根双管旋喷桩封闭搭接以闭合止水帷幕;... 依托广州某机场三期扩建工程的隧道深基坑,针对地质条件复杂、基坑开挖深度大等特点,提出采用分区复合型支护方案。为改善不同支护方式区段衔接处的防水效果,提出在三轴搅拌桩和咬合桩衔接处采用2根双管旋喷桩封闭搭接以闭合止水帷幕;钻孔时采用多段成孔工艺有效减少了施工对土体和对周边建筑的影响,钻进过程中通过同步输送压缩气流确保了下管顺利。最后,通过将原方案的PH–5D高压旋喷型桩机优化为PH–5D–55深层型旋喷设备提升了最大扭矩和进提钻力等,并在纯水泥浆中掺入3%的水玻璃或氯化钙改善了浆液的性能。 展开更多
关键词 隧道工程 深基坑 双管高压旋喷桩 止水帷幕 支护结构
在线阅读 下载PDF
管幕-结构法大间距管间开挖钢板切割变形与支护力研究 被引量:1
5
作者 刘翔 黎奎辰 +4 位作者 张瑞 黄俊 赵光 房倩 姜谙男 《现代隧道技术》 北大核心 2025年第1期28-37,共10页
采用管幕-结构法穿越既有地下结构时可能形成大间距管间土体开挖工况,大间距管间土体开挖过程中,钢板切割过程的变形模式及支护力预测至关重要。基于实际工程中拟采用的大间距管间钢板切割方案建立数值模型,进而提出一种针对大间距管间... 采用管幕-结构法穿越既有地下结构时可能形成大间距管间土体开挖工况,大间距管间土体开挖过程中,钢板切割过程的变形模式及支护力预测至关重要。基于实际工程中拟采用的大间距管间钢板切割方案建立数值模型,进而提出一种针对大间距管间方形钢板切割面的楔形体失稳模型,推导出切割面极限支护力解析解,进一步分析各因素对地表沉降和支护力的影响。研究结果表明:该理论计算方法对大间距管间钢板切割施工问题有较好的适用性;钢板切割尺寸对地表沉降影响最大,而钢管埋深对地表沉降影响最小;随着埋深增加,切割面所需支护压力增大但增幅减小。基于此,提出“小切割、少扰动、勤支护”的施工方案以保证安全施工。 展开更多
关键词 管幕-结构法 管间开挖 楔形体失稳模型 三维离散元 极限支护力
在线阅读 下载PDF