The first permanent magnet driven rectangular pipe jacking machine independently developed in China is used for the construction of pedestrian passage in Banxuegang Science and Technology City area of Shenzhen. The re...The first permanent magnet driven rectangular pipe jacking machine independently developed in China is used for the construction of pedestrian passage in Banxuegang Science and Technology City area of Shenzhen. The rectangular pipe jacking machine occupies a small area during the initial excavation. It is suitable for shallow soil covering and short-distance excavation. It is more economical and applicable than shield machine and has high construction efficiency. During the construction process, technical measures such as attitude measurement and adjustment of pipe jacking machine, surrounding rock grouting and friction reduction can effectively ensure the smooth construction of pipe jacking machine, and provide reference for large section pipe jacking machine in shallow soil construction.展开更多
1 Project overview The Shasan station of Phase II of Shenzhen’s urban rail transit Line 12 is situated in Bao’an District,Shenzhen.It comprises a two-level underground island platform station,measuring 212 m in leng...1 Project overview The Shasan station of Phase II of Shenzhen’s urban rail transit Line 12 is situated in Bao’an District,Shenzhen.It comprises a two-level underground island platform station,measuring 212 m in length,and 22.6 m in width,with an overburden thickness of about 7.0 m.Fig.1 illustrates the presence of a large underground reinforced concrete stormwater culvert,measuring 11.5 m by 3.6 m,traversing the station’s center.展开更多
文摘The first permanent magnet driven rectangular pipe jacking machine independently developed in China is used for the construction of pedestrian passage in Banxuegang Science and Technology City area of Shenzhen. The rectangular pipe jacking machine occupies a small area during the initial excavation. It is suitable for shallow soil covering and short-distance excavation. It is more economical and applicable than shield machine and has high construction efficiency. During the construction process, technical measures such as attitude measurement and adjustment of pipe jacking machine, surrounding rock grouting and friction reduction can effectively ensure the smooth construction of pipe jacking machine, and provide reference for large section pipe jacking machine in shallow soil construction.
基金This engineering is a demonstration project for Key Research and Development Project of Guangdong Province under Grant No.2019B111105001part of research related to this engineering was financially supported by the project.
文摘1 Project overview The Shasan station of Phase II of Shenzhen’s urban rail transit Line 12 is situated in Bao’an District,Shenzhen.It comprises a two-level underground island platform station,measuring 212 m in length,and 22.6 m in width,with an overburden thickness of about 7.0 m.Fig.1 illustrates the presence of a large underground reinforced concrete stormwater culvert,measuring 11.5 m by 3.6 m,traversing the station’s center.