The construction of a large-scale highway has promoted the economic development of our country. In highway construction, the shortening or extension of the construction period will have a negative impact on the progre...The construction of a large-scale highway has promoted the economic development of our country. In highway construction, the shortening or extension of the construction period will have a negative impact on the progress and quality of the project. This paper will analyze the current stage of the project construction and the problems existing in the project construction based on these factors. At present, the highway projects are mainly economic benefit analysis. The construction process does not conform to the relevant construction schedule formulated in advance, and there is a lack of supervision and management. Looking at the previous work experience, in the early stage of highway construction, a set of quality management system conforming to the project construction can be established, and a scientific construction plan can be planned. In addition, the purchase of construction materials can also be strictly controlled, and materials can be inspected and checked in the middle stage of construction, so as to prevent the occurrence of jerry-building or defective products, lay a solid foundation for the progress of highway construction and the quality of the project, and promote the long-term development of national highway construction.展开更多
We know that there are many risk factors in elevator inspection, including environmental risk caused by internal interface characteristics of high-rise buildings, operator operation risk, mechanical risk and other ris...We know that there are many risk factors in elevator inspection, including environmental risk caused by internal interface characteristics of high-rise buildings, operator operation risk, mechanical risk and other risk factors that will lead to more serious safety events. In order to make elevator inspection safer, it is necessary to analyze its hazard sources to avoid safety risks. The elevator itself has a complex structure, which determines the difficulty of elevator maintenance. Therefore, operators must prevent mechanical injury accidents, electrical injury accidents and falling accidents in advance, so as to carry out elevator maintenance safely and orderly on the premise of ensuring their own safety.展开更多
The impact of the epidemic on China's economy is huge.By analyzing the impact of the epidemic on the informal economy and consulting the measures taken by local governments in Sichuan to restore the stall economy ...The impact of the epidemic on China's economy is huge.By analyzing the impact of the epidemic on the informal economy and consulting the measures taken by local governments in Sichuan to restore the stall economy in the post epidemic period,this paper classifies and refines the measures made by urban governments of different sizes of cities,puts forward relevant laws,and puts forward opinions and forecasts on the future trend of the stall economy and stall economy in the post epidemic period.Due to the impact of the epidemic,people's awareness of self-protection has increased,local governments have also strengthened prevention and control,and the business of vendors has been seriously affected.The Sichuan case shows that the government's encouragement is an important guarantee for the rapid recovery of the stall economy.At the same time,reasonable control is a necessary means to prevent the recurrence of the epidemic.For the future trend of the stall,it is a trend to set up permittedvending-places(shudaoqu).Selecting an address according to the nature of the commodity is the guarantee of sales.展开更多
The use conditions of locomotives in subway construction are diverse and complex. How to strengthen the daily management of engineering truck drivers, improve the work standardization of truck drivers, manage trains s...The use conditions of locomotives in subway construction are diverse and complex. How to strengthen the daily management of engineering truck drivers, improve the work standardization of truck drivers, manage trains safely and reliably, and perform this task effectively and safely is the key problem to be faced at present.展开更多
The geological characteristics of coalbed methane from the research carried out in Liupanshui is based on analysis of faults, folds, roof and floor lithology, and depth of coal seam gas content, combined with the asse...The geological characteristics of coalbed methane from the research carried out in Liupanshui is based on analysis of faults, folds, roof and floor lithology, and depth of coal seam gas content, combined with the assessment of CBM resources calculated through buried depth scope, average coal seam thickness, and gas content, organized by the Ministry of Land and Resources in 2006, which launched the "national new round of coalbed methane re-sources evaluation" project to evaluate the coalbcd methane resources in the standard category and divided coal-bed methane resources into Ⅰ, Ⅱand Ⅲ Category of three resources categories. With this method on the other syncline to resources assessment, the area below 1 000 m is named as ] Category resources. And with the depth increasing, resources level decreases.展开更多
文摘The construction of a large-scale highway has promoted the economic development of our country. In highway construction, the shortening or extension of the construction period will have a negative impact on the progress and quality of the project. This paper will analyze the current stage of the project construction and the problems existing in the project construction based on these factors. At present, the highway projects are mainly economic benefit analysis. The construction process does not conform to the relevant construction schedule formulated in advance, and there is a lack of supervision and management. Looking at the previous work experience, in the early stage of highway construction, a set of quality management system conforming to the project construction can be established, and a scientific construction plan can be planned. In addition, the purchase of construction materials can also be strictly controlled, and materials can be inspected and checked in the middle stage of construction, so as to prevent the occurrence of jerry-building or defective products, lay a solid foundation for the progress of highway construction and the quality of the project, and promote the long-term development of national highway construction.
文摘We know that there are many risk factors in elevator inspection, including environmental risk caused by internal interface characteristics of high-rise buildings, operator operation risk, mechanical risk and other risk factors that will lead to more serious safety events. In order to make elevator inspection safer, it is necessary to analyze its hazard sources to avoid safety risks. The elevator itself has a complex structure, which determines the difficulty of elevator maintenance. Therefore, operators must prevent mechanical injury accidents, electrical injury accidents and falling accidents in advance, so as to carry out elevator maintenance safely and orderly on the premise of ensuring their own safety.
文摘The impact of the epidemic on China's economy is huge.By analyzing the impact of the epidemic on the informal economy and consulting the measures taken by local governments in Sichuan to restore the stall economy in the post epidemic period,this paper classifies and refines the measures made by urban governments of different sizes of cities,puts forward relevant laws,and puts forward opinions and forecasts on the future trend of the stall economy and stall economy in the post epidemic period.Due to the impact of the epidemic,people's awareness of self-protection has increased,local governments have also strengthened prevention and control,and the business of vendors has been seriously affected.The Sichuan case shows that the government's encouragement is an important guarantee for the rapid recovery of the stall economy.At the same time,reasonable control is a necessary means to prevent the recurrence of the epidemic.For the future trend of the stall,it is a trend to set up permittedvending-places(shudaoqu).Selecting an address according to the nature of the commodity is the guarantee of sales.
文摘The use conditions of locomotives in subway construction are diverse and complex. How to strengthen the daily management of engineering truck drivers, improve the work standardization of truck drivers, manage trains safely and reliably, and perform this task effectively and safely is the key problem to be faced at present.
基金Supported by the National "973" CBM project (2009CB219605) the National Science and Technology of major special projects (201 IZX05034): the National Natural Science Foundation of China (40730422)
文摘The geological characteristics of coalbed methane from the research carried out in Liupanshui is based on analysis of faults, folds, roof and floor lithology, and depth of coal seam gas content, combined with the assessment of CBM resources calculated through buried depth scope, average coal seam thickness, and gas content, organized by the Ministry of Land and Resources in 2006, which launched the "national new round of coalbed methane re-sources evaluation" project to evaluate the coalbcd methane resources in the standard category and divided coal-bed methane resources into Ⅰ, Ⅱand Ⅲ Category of three resources categories. With this method on the other syncline to resources assessment, the area below 1 000 m is named as ] Category resources. And with the depth increasing, resources level decreases.