In order to investigate the feasibility of pretreating the micro-polluted Yellow River raw water by constructed wetland, an experiment was conducted using a surface flow constructed wetland with composite plant bed. T...In order to investigate the feasibility of pretreating the micro-polluted Yellow River raw water by constructed wetland, an experiment was conducted using a surface flow constructed wetland with composite plant bed. The contamination removal efficiency and their trends in the wetland treatment system were studied under different hydraulic loading rates(HLR). The contamination removal efficiencies were compared according to the seasonal change under optimum HLR. The result shows that in the same season, under different hydraulic loadings ranging from 2 to 6 m3/(m2·d) at the same period, the best HLR is 4 m3/(m2·d) in the experimental system. The average removal rates of COD, TN, ammoniacal nitrogen(NH4+-N), and TP in the constructed wetland are 38.37%, 45.97%, 39.86% and 41.69%, respectively. According to China Standard for Surface Water Resources (GB3838-2002), mean effluent of COD, TN, NH4+-N and TP can nearly reach Grade Ⅲ, GradeⅤ, GradeⅠand GradeⅠ, respectively. Furthermore, treatment efficiency of the system in summer is obvious higher than that in other seasons. The expenditure of constructing the constructed wetland with the average treating capacity of 176 m3/d and lifetime of 20 years is 17075.00 RMB. The average disposal cost is summed up to 0.17 RMB/m3, which shows that the pretreatment of the micro-polluted Yellow River raw water by constructed wetland is feasible.展开更多
Bormate (BrO3^-) is a carcinogenic chemical produced in ozonation or chlorination of bromide-containing water. Although its formation in seawater with or without sunlight has been previously investigated, the format...Bormate (BrO3^-) is a carcinogenic chemical produced in ozonation or chlorination of bromide-containing water. Although its formation in seawater with or without sunlight has been previously investigated, the formation of bromate in dilute solutions, particularly raw water for water treatment plant, is unknown. In this article, the results of bench scale tests to measure the formation rates of bromate formation in dilute solutions, including de-ionized water and raw water from Yangtze River, were presented in dark chlorination and ultraviolet (UV)/chlorination processes. And the effects of initial pH, initial concentration of NaOCl, and UV light intensity on bromate formation in UV/chlorination of the diluted solutions were investigated. Detectable bromate was formed in dark chlorination of the two water samples with a relatively slow production rate. Under routine disinfecting conditions, the amount of formed bromate is not likely to exceed the national standards (10 μg/L). UV irradiation enhanced the decay of free chlorine, and, simultaneously, 6.6%-32% of Br^- was oxidized to BrO3^-. And the formation of bromate exhibited three stages: rapid stage, slow stage and plateau. Under the experimental conditions (pH = 4.41-11.07, CCl2= 1.23-4.50 mg/L), low pH and high chlorine concentration favored the generation of bromate. High light intensity promoted the production rate of bromate, but decreased its total generation amount due to acceleration of chlorine decomposition.展开更多
A hydraulic model-based emergency schedul- ing Decision Support System (DSS) is designed to eliminate the impact of sudden contamination incidents occurring upstream in raw water supply systems with multiple sources...A hydraulic model-based emergency schedul- ing Decision Support System (DSS) is designed to eliminate the impact of sudden contamination incidents occurring upstream in raw water supply systems with multiple sources. The DSS consists of four functional modules, including water quality prediction, system safety assessment, emergency strategy inference and scheduling optimization. The work flow of the DSS is as follows. First, the water quality variations on specific cross-sections are calculated given the pollution information. Next, a comprehensive evaluation on the safety of the current system is conducted using the outputs in the first module. This will assist in the assessment of whether the system is in danger of failure, taking both the impact of pollution and system capacity into account. If there is a severe impact of contamination on the reliability of the system, a fuzzy logic based inference module is employed to generate reason- able strategies including technical measures. Otherwise, a Genetic Algorithm (GA)-based optimization model will be used to find the least-cost scheduling plan. The proposed DSS has been applied to a coastal city in South China during a saline tide period as validation. Through scenario analysis, it is demonstrated that this DSS tool is instrumental in emergency scheduling for the water company to quickly and effectively respond to sudden contamination incidents.展开更多
基金the National High Technology Research and Development Program of China(863 Program)(Grant No.2006AA06Z303).
文摘In order to investigate the feasibility of pretreating the micro-polluted Yellow River raw water by constructed wetland, an experiment was conducted using a surface flow constructed wetland with composite plant bed. The contamination removal efficiency and their trends in the wetland treatment system were studied under different hydraulic loading rates(HLR). The contamination removal efficiencies were compared according to the seasonal change under optimum HLR. The result shows that in the same season, under different hydraulic loadings ranging from 2 to 6 m3/(m2·d) at the same period, the best HLR is 4 m3/(m2·d) in the experimental system. The average removal rates of COD, TN, ammoniacal nitrogen(NH4+-N), and TP in the constructed wetland are 38.37%, 45.97%, 39.86% and 41.69%, respectively. According to China Standard for Surface Water Resources (GB3838-2002), mean effluent of COD, TN, NH4+-N and TP can nearly reach Grade Ⅲ, GradeⅤ, GradeⅠand GradeⅠ, respectively. Furthermore, treatment efficiency of the system in summer is obvious higher than that in other seasons. The expenditure of constructing the constructed wetland with the average treating capacity of 176 m3/d and lifetime of 20 years is 17075.00 RMB. The average disposal cost is summed up to 0.17 RMB/m3, which shows that the pretreatment of the micro-polluted Yellow River raw water by constructed wetland is feasible.
文摘Bormate (BrO3^-) is a carcinogenic chemical produced in ozonation or chlorination of bromide-containing water. Although its formation in seawater with or without sunlight has been previously investigated, the formation of bromate in dilute solutions, particularly raw water for water treatment plant, is unknown. In this article, the results of bench scale tests to measure the formation rates of bromate formation in dilute solutions, including de-ionized water and raw water from Yangtze River, were presented in dark chlorination and ultraviolet (UV)/chlorination processes. And the effects of initial pH, initial concentration of NaOCl, and UV light intensity on bromate formation in UV/chlorination of the diluted solutions were investigated. Detectable bromate was formed in dark chlorination of the two water samples with a relatively slow production rate. Under routine disinfecting conditions, the amount of formed bromate is not likely to exceed the national standards (10 μg/L). UV irradiation enhanced the decay of free chlorine, and, simultaneously, 6.6%-32% of Br^- was oxidized to BrO3^-. And the formation of bromate exhibited three stages: rapid stage, slow stage and plateau. Under the experimental conditions (pH = 4.41-11.07, CCl2= 1.23-4.50 mg/L), low pH and high chlorine concentration favored the generation of bromate. High light intensity promoted the production rate of bromate, but decreased its total generation amount due to acceleration of chlorine decomposition.
文摘A hydraulic model-based emergency schedul- ing Decision Support System (DSS) is designed to eliminate the impact of sudden contamination incidents occurring upstream in raw water supply systems with multiple sources. The DSS consists of four functional modules, including water quality prediction, system safety assessment, emergency strategy inference and scheduling optimization. The work flow of the DSS is as follows. First, the water quality variations on specific cross-sections are calculated given the pollution information. Next, a comprehensive evaluation on the safety of the current system is conducted using the outputs in the first module. This will assist in the assessment of whether the system is in danger of failure, taking both the impact of pollution and system capacity into account. If there is a severe impact of contamination on the reliability of the system, a fuzzy logic based inference module is employed to generate reason- able strategies including technical measures. Otherwise, a Genetic Algorithm (GA)-based optimization model will be used to find the least-cost scheduling plan. The proposed DSS has been applied to a coastal city in South China during a saline tide period as validation. Through scenario analysis, it is demonstrated that this DSS tool is instrumental in emergency scheduling for the water company to quickly and effectively respond to sudden contamination incidents.