期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Performance Boundaries of Air-and Ground-Coupled GPR for Void Detection in Multilayer Reinforced HSR Tunnel Linings:Simulation and Field Validation
1
作者 Yang Lei Bo Jiang +5 位作者 Yucai Zhao Gaofeng Fu Falin Qi Tian Tian Qiankuan Feng Qiming Qu 《Structural Durability & Health Monitoring》 2025年第6期1657-1679,共23页
Detecting internal defects,particularly voids behind linings,is critical for ensuring the structural integrity of aging high-speed rail(HSR)tunnel networks.While ground-penetrating radar(GPR)is widely employed,systema... Detecting internal defects,particularly voids behind linings,is critical for ensuring the structural integrity of aging high-speed rail(HSR)tunnel networks.While ground-penetrating radar(GPR)is widely employed,systematic quantification of performance boundaries for air-coupled(A-CGPR)and ground-coupled(G-CGPR)systems within the complex electromagnetic environment of multilayer reinforced HSR tunnels remains limited.This study establishes physics-based quantitative performance limits for A-CGPR and G-CGPR through rigorously validated GPRMax finite-difference time-domain(FDTD)simulations and comprehensive field validation over a 300 m operational HSR tunnel section.Key performance metrics were quantified as functions of:(a)detection distance(A-CGPR:2.0–4.5 m;G-CGPR:≤0.1 m),(b)antenna frequency(A-CGPR:300 MHz;G-CGPR:400/900 MHz),(c)reinforcement configuration(unreinforced,single-layer,multilayer rebar),and(d)void geometry(axial length:0.1–1.0 m;radial depth:0.1–0.5 m).Key findings demonstrate:a.A-CGPR(300 MHz):Reliably detects axial voids≥0.3 m at distances≤3 m in minimally reinforced(single-layer rebar)linings(field R2=0.89).Performance degrades significantly at distances>3 m(>60%signal attenuation at 4.5 m)or under multilayer rebar interference,causing 25%–40%accuracy loss for voids<0.3 m.Optimal distance:2.0–2.5 m.b.G-CGPR(900 MHz):Achieves<5%size measurement error for axial voids≥0.1 m and radial voids≥0.2 m in unreinforced linings.Resolution degrades under multilayer reinforcement due to severe signal attenuation,increasing axial void detection error to 10%–20%for voids≥0.3 m and constraining radial size measurement.c.Synergistic Framework:A hybrid inspection protocol is proposed,integrating A-CGPR(20 km/h)for rapid large-area screening and targeted G-CGPR(3 km/h)for high-resolution verification of identified anomalies.This framework enhances NDT efficiency while reducing estimated lifecycle inspection costs by 34%compared to G-CGPR alone.This research provides the first physics-derived quantitative detection thresholds for A-CGPR and G-CGPR in multi-rebar HSR tunnels,validated through field-correlated simulations.Future work will focus on multi-frequency antenna arrays and deep learning algorithms to mitigate reinforcement interference.The established performance boundaries and hybrid framework offer critical guidance for optimizing tunnel lining inspection strategies in extensive HSR networks. 展开更多
关键词 High-speed railway tunnel air-coupled GPR ground-coupled GPR lining void detection rebar interference nondestructive testing(NDT) quantitative performance boundaries finite-difference time-domain(FDTD) hybrid inspection
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部