期刊文献+
共找到1,120篇文章
< 1 2 56 >
每页显示 20 50 100
GEOMETRIC CONSTRUCTION OF ASSOCIATION SCHEMES FROM DEGENERATE QUADRICS INPROJECTIVE SPACES PG(2ν+δ+ι-1, Fq) FOR q ODD 被引量:1
1
作者 王恺顺 魏鸿增 《Acta Mathematica Scientia》 SCIE CSCD 2000年第1期35-43,共9页
Let Fq be a finite field with q elements, where q is a power of an odd prime,In this paperl the authors consider a projective space PG(2v + δ + l, Fq) with dimension 2v + δ + l, partitioned into an affine space AG(2... Let Fq be a finite field with q elements, where q is a power of an odd prime,In this paperl the authors consider a projective space PG(2v + δ + l, Fq) with dimension 2v + δ + l, partitioned into an affine space AG(2v + δ + l, Fq) of dimension 2v + δ + l and a hyperplane H = PG(2v + δ + l - 1, Fq) of dimension 2v + δ + l - 1 at infinity, where l ≠0.The points of the hyperplane H are next partitioned into four subsets. A pair of points a and b of the affine space is defined to belong to class i if the line ab meets the subsct i of H. Finally, a family of four-class association schemes are constructed, and parameters are also computed. 展开更多
关键词 projective space QUADRIC association scheme
在线阅读 下载PDF
Design of Water Disinfection Scheme for Rural Drinking Water Safety Project 被引量:1
2
作者 Qing Lu 《Meteorological and Environmental Research》 CAS 2013年第7期28-31,共4页
As further promotion of the rural drinking water safety project in whole country, small villages in vast countryside have been or will be equipped with safety drinking water project. We analyzed necessity of the rural... As further promotion of the rural drinking water safety project in whole country, small villages in vast countryside have been or will be equipped with safety drinking water project. We analyzed necessity of the rural drinking water disinfection, discussed disinfection method suitable for rural drinking water characteristics, and put forward disinfection schemes for different water supply sources. 展开更多
关键词 Rural drinking water safety project Disinfection method Disinfection scheme China
在线阅读 下载PDF
Superconvergence of nonconforming finite element penalty scheme for Stokes problem using L^2 projection method 被引量:3
3
作者 石东洋 裴丽芳 《Applied Mathematics and Mechanics(English Edition)》 SCIE EI 2013年第7期861-874,共14页
A modified penalty scheme is discussed for solving the Stokes problem with the Crouzeix-Raviart type nonconforming linear triangular finite element. By the L^2 projection method, the superconvergence results for the v... A modified penalty scheme is discussed for solving the Stokes problem with the Crouzeix-Raviart type nonconforming linear triangular finite element. By the L^2 projection method, the superconvergence results for the velocity and pressure are obtained with a penalty parameter larger than that of the classical penalty scheme. The numerical experiments are carried out to confirm the theoretical results. 展开更多
关键词 SUPERCONVERGENCE Crouzeix-Raviart type nonconforming finite element penalty scheme L^2 projection method
在线阅读 下载PDF
Two power projects under BOT funding scheme progressing smoothly
4
《Electricity》 1997年第1期48-48,共1页
关键词 BOT Two power projects under BOT funding scheme progressing smoothly
在线阅读 下载PDF
Velocity Projection with Upwind Scheme Based on the Discontinuous Galerkin Methods for the Two Phase Flow Problem
5
作者 Jiangyong Hou Wenjing Yan Jie Chen 《International Journal of Modern Nonlinear Theory and Application》 2015年第2期127-141,共15页
The upwind scheme is very important in the numerical approximation of some problems such as the convection dominated problem, the two-phase flow problem, and so on. For the fractional flow formulation of the two-phase... The upwind scheme is very important in the numerical approximation of some problems such as the convection dominated problem, the two-phase flow problem, and so on. For the fractional flow formulation of the two-phase flow problem, the Penalty Discontinuous Galerkin (PDG) methods combined with the upwind scheme are usually used to solve the phase pressure equation. In this case, unless the upwind scheme is taken into consideration in the velocity reconstruction, the local mass balance cannot hold exactly. In this paper, we present a scheme of velocity reconstruction in some H(div) spaces with considering the upwind scheme totally. Furthermore, the different ways to calculate the nonlinear coefficients may have distinct and significant effects, which have been investigated by some authors. We propose a new algorithm to obtain a more effective and stable approximation of the coefficients under the consideration of the upwind scheme. 展开更多
关键词 VELOCITY projectION UPWIND scheme PENALTY DISCONTINUOUS GALERKIN Methods Two Phase Flow in Porous Media
在线阅读 下载PDF
Estimating minimum ecological water required of the western route first stage project of China's south-to-north water transfer scheme for water exporting rivers
6
作者 MEN Bao-hui 《Journal of Environmental Science and Engineering》 2007年第1期19-24,共6页
It is well known that there is abundant water resources in basin of the Yangtze River, the first largest river in China, which is mainly located in Southern China. However, water resources is very scarce in the basin ... It is well known that there is abundant water resources in basin of the Yangtze River, the first largest river in China, which is mainly located in Southern China. However, water resources is very scarce in the basin of the Yellow River, which is mainly located in Northern China. So the western route project of south-north water transfer scheme (WRP-SNWTS) aims to transfer water from the Yangtze River to the Yellow River. The area of WRP-SNWT, located in the upper reaches of the Yangtze River and the main areas of Sichuan and the marginal areas of the Qinghai-Tibet Plateau, has sufficient water resources but fragile ecology and environment. Therefore, it is necessary for WRP-SNWT to analyze the ecology water required. Based on the planning principles of from low elevation to high elevation, from small to large, from short to long and from easy to difficulty, the WRP-SNWT will be constructed through three stage projects. The western route first stage project of the south-north water transfer scheme (WRFST-SNWTS) is planned to transfer 4×10^9m^3/a from six tributaries of the Yalong river and from Dadu river to Jiaqu of Yellow River.. Daqu river and Niqu river are the branches of Xianshui river. Sequ river, Duke river, Make river and Ake river are the branches of Dadu river, which account for 65-70% of the total river run-off. It need more research and the rest run-off can satisfy channel ecology water required. According to analysis ecological water required which mainly satisfy for aquicolous biology in water-exporting region, such as low air temperature. Fish and aquicolous biology main living from May to August, and rivers are iced up from December to March of next year, ecology water required mainly for fish and aquicolous biology. The flow criterion of Tennant method is modified. The ecology water required of WRFSP-SNWTS is estimated by the flow data of Zhuwo gauging station, Zhuba gauging station, Chuosijia gauging station and Zumuzu gauging station. The result show that the ecology water required calculated by modified Tennant less 1 l percent than that of Tennant. This estimating result can supply more water resources for transferring to Yellow River. Meanwhile, this can supply gist for research transferring water of WRFSP-SNWTS. 展开更多
关键词 Yangtze River Yellow River western route first stage project of the south-north water transfer scheme minimum ecological water required Tennant method
在线阅读 下载PDF
Eco-environmental benefit assessment of China's South-North Water Transfer Scheme——the middle route project
7
作者 DUANGuang-ming ZHAOJing-zhu LIUGuo-hua KEBing XIAOHan WUGang DENGHong-bing 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2004年第2期308-315,共8页
This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of ... This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of SNWT's middle route project. Some benefits were calculated in monetary units. To make sure that the results can be comparable with normal monetary indices, concrete assessment objects and the parameters are prudently selected according to the major characteristics of the project and its water import region. Primary assessment revealed that in different project construction stages, the benefit could be more than 13 07 billion RMB Yuan in 2010 and 19 79 billion RMB Yuan in 2030, respectively. The monetary value tends to increase with social-economic development. To realize these potential benefits, however, calls for more endeavors. 展开更多
关键词 China's South-North Water Transfer scheme(SNWT) the middle route project of South-North Water Transfer(MRPSNWT) assessment ecosystem services monetary indices
在线阅读 下载PDF
复杂艰险地区隧道工程施工方案优选决策研究
8
作者 段晓晨 周龙 +2 位作者 段鹏鑫 杨晓雪 苏丹娜 《铁道工程学报》 北大核心 2025年第7期72-76,共5页
研究目的:为解决目前西南复杂艰险地区隧道工程施工方案优化中没有很好兼顾环保、安全、质量导致一系列事故问题,本文综合考虑施工工期、成本、质量、安全、环保五个施工重要指标,在网络计划技术合理划分施工活动基础上,运用模糊群方法... 研究目的:为解决目前西南复杂艰险地区隧道工程施工方案优化中没有很好兼顾环保、安全、质量导致一系列事故问题,本文综合考虑施工工期、成本、质量、安全、环保五个施工重要指标,在网络计划技术合理划分施工活动基础上,运用模糊群方法,用三角模糊数的形式表示五大指标,定义模糊多属性优属度,并利用直觉模糊集进行评价,建立综合工期-成本-质量-安全-环保的模糊优化群决策模型,并用遗传算法求得最佳作业模式组合,实现施工方案的优选决策。研究结论:(1)将模型求出的施工方案在案例隧道工程中实施,根据真实工程试验结果,在满足质量、安全、环保、工期、成本的要求基础上,工期缩短20天,成本低于预算5%,提升了工程的综合效益;(2)方法应用于隧道工程施工方案的优选决策,实现了工期、质量、成本、安全、环保等目标的均衡优化,可为隧道工程施工方案决策提供方法、数据支持和依据。 展开更多
关键词 隧道工程 模糊综合优化 遗传算法 方案优选
在线阅读 下载PDF
基于改进灰色关联投影模型的滑坡治理方案决策研究
9
作者 郑明新 卢乐意 +1 位作者 李东 阮钰华 《中国安全生产科学技术》 北大核心 2025年第5期102-110,共9页
为解决滑坡治理方案决策的多维复杂性问题,提出1种融合组合赋权与动态分辨系数的改进灰色关联投影模型。首先,构建包含滑坡地质特征认识、滑坡治理措施、经济与环境4大因素的16项决策指标,并通过分级标准实现指标定量化。然后,采用层次... 为解决滑坡治理方案决策的多维复杂性问题,提出1种融合组合赋权与动态分辨系数的改进灰色关联投影模型。首先,构建包含滑坡地质特征认识、滑坡治理措施、经济与环境4大因素的16项决策指标,并通过分级标准实现指标定量化。然后,采用层次分析法(AHP)和CRITIC分别确定主观和客观权重,基于博弈论组合赋权计算综合权重。进一步引入动态分辨系数,优化传统灰色关联投影法,提升指标区分度,最终建立滑坡治理方案决策模型。研究结果表明:改进模型具有较高的决策适用性和稳定性,稳定性提升约13.01%,优于传统模型。研究结果可为工程实践中合理选择治理措施提供更加精准的决策支持。 展开更多
关键词 滑坡治理 方案决策 组合赋权 分辨系数 灰色关联投影法
在线阅读 下载PDF
基于Triangle模型的下肢静脉溃疡患者分层分级管理方案的构建及应用
10
作者 顾飞 王娴 +2 位作者 周盼盼 周旭 王燕 《护士进修杂志》 2025年第12期1249-1257,共9页
目的构建基于Triangle模型的下肢静脉溃疡(venous leg ulcer,VLU)患者分层分级管理方案并评价其应用效果。方法于2024年1—4月采用文献回顾、小组讨论、专家会议方法构建包含低、中、高危分层标准及各级管理措施的方案,并选取于2024年5... 目的构建基于Triangle模型的下肢静脉溃疡(venous leg ulcer,VLU)患者分层分级管理方案并评价其应用效果。方法于2024年1—4月采用文献回顾、小组讨论、专家会议方法构建包含低、中、高危分层标准及各级管理措施的方案,并选取于2024年5—6月入院的36例患者为对照组,2024年7—8月入院的36例VLU患者为观察组,对照组给予患者常规治疗及护理管理措施,并为患者实施常规健康教育;观察组在对照组的基础上,实施基于Triangle模型的VLU患者分层分级管理。比较2组患者干预前、干预后溃疡面积、溃疡愈合效果、溃疡愈合总有效率、治疗依从性和自我管理能力。结果干预后,观察组的溃疡面积显著小于对照组(P<0.05)、溃疡愈合效果显著优于对照组(P<0.05);观察组的溃疡愈合总有效率为86.11%,高于对照组的63.89%,2组比较差异有统计学意义(P<0.05);观察组的治疗依从性和自我管理能力显著优于对照组(P<0.05)。结论本研究构建的基于Triangle模型的VLU患者分层分级管理方案能够为患者提供科学有效的管理,促进患者溃疡愈合,提高患者的治疗依从性和自我管理能力。 展开更多
关键词 Triangle分层分级管理模型 下肢静脉溃疡 方案构建 方案应用 护理
暂未订购
宝鹏通道简上路—龙景立交段方案优化
11
作者 郝强 《天津建设科技》 2025年第1期23-25,62,共4页
以实际工程为案例,分析了大型工程如何在复杂建设条件下,考虑各方诉求,并保证项目技术标准和功能的前提下,从多个角度优化方案,从而节省工程投资。
关键词 大型工程 方案优化 立交
在线阅读 下载PDF
横沙南围泵闸方案比选及结构设计
12
作者 王彬 《海河水利》 2025年第10期41-45,共5页
泵闸为防洪调度和排涝减灾的关键工程,水闸和泵站的布置、选型对工程的质量和效益都格外重要,泵闸选址合理和优化总体布置对改善区域水环境以及提高整体排水除涝和蓄滞洪水的能力具有显著影响。为开展城镇排涝泵闸的设计工作,以横沙南... 泵闸为防洪调度和排涝减灾的关键工程,水闸和泵站的布置、选型对工程的质量和效益都格外重要,泵闸选址合理和优化总体布置对改善区域水环境以及提高整体排水除涝和蓄滞洪水的能力具有显著影响。为开展城镇排涝泵闸的设计工作,以横沙南围泵闸为例,对工程选址、水泵类型、建筑物选型、管理房布置方式等进行方案比选,并进行结构设计和稳定计算,提出了泵闸工程施工的研究思路及方法,研究成果可为类似工程提供参考。 展开更多
关键词 横沙南围泵站 泵闸工程 方案比选 结构设计
在线阅读 下载PDF
三门县健跳塘提升改造工程海塘建设方案研究
13
作者 邹战军 《云南水力发电》 2025年第9期145-148,180,共5页
三门县健跳塘已按50年一遇防潮标准建成,海塘塘身为混合式土石结构,迎潮面镇压层以上塘身采用混凝土护面,现状健跳塘存在塘身型式单一、沿岸环境较为杂乱、沿线局部垃圾堆积等问题,需对海塘进行提升改造。文章在分析海塘现状及问题的基... 三门县健跳塘已按50年一遇防潮标准建成,海塘塘身为混合式土石结构,迎潮面镇压层以上塘身采用混凝土护面,现状健跳塘存在塘身型式单一、沿岸环境较为杂乱、沿线局部垃圾堆积等问题,需对海塘进行提升改造。文章在分析海塘现状及问题的基础上,进行海塘建设方案研究,主要包括海塘选址、选线、海塘提升改造选型,以及海塘总体布置方案、地基处理方式、海塘整体稳定性等。 展开更多
关键词 健跳塘提升改造 方案比选 总体布置 工程设计 稳定计算
在线阅读 下载PDF
甜水堡调蓄引水工程施工方案分析
14
作者 刘红娟 《云南水力发电》 2025年第4期128-130,共3页
为更好地组织和开展工程施工,文章在分析甜水堡调蓄引水项目工程区交通、供电、供水及天然建主材料等施工条件的基础上,对工程施工的重点难点进行分析,并提出相应的解决措施,进一步对施工导流、坝体填筑、放空管以及库区开挖施工等施工... 为更好地组织和开展工程施工,文章在分析甜水堡调蓄引水项目工程区交通、供电、供水及天然建主材料等施工条件的基础上,对工程施工的重点难点进行分析,并提出相应的解决措施,进一步对施工导流、坝体填筑、放空管以及库区开挖施工等施工方案进行论述探讨。 展开更多
关键词 甜水堡 调蓄 引水工程 施工方案
在线阅读 下载PDF
软土地基中深基坑预制型钢预应力组合支撑施工技术研究与应用
15
作者 杨雁 《建筑施工》 2025年第5期777-781,786,共6页
在软土地基及复杂城市环境中进行深基坑施工,往往面临周边环境保护要求高、施工平面布置难、基坑变形控制因素多等问题,现有研究尚存在不足。为此,以上海创远基石用房一期项目为例,通过工程重难点分析、基坑支护方案优化选择,探析预制... 在软土地基及复杂城市环境中进行深基坑施工,往往面临周边环境保护要求高、施工平面布置难、基坑变形控制因素多等问题,现有研究尚存在不足。为此,以上海创远基石用房一期项目为例,通过工程重难点分析、基坑支护方案优化选择,探析预制型钢预应力组合支撑在软土地基中的应用效果与优势。通过工程实践及监测数据,证明该技术能有效控制支护结构和基坑的变形,安全稳定,验证了设计与施工方法的合理性,并以其施工便捷、工期短、减少建筑垃圾和施工场地占用、对周边环境影响小等优势,可为同类软土工况下的深基坑工程提供参考。 展开更多
关键词 软土地基 复杂环境 深基坑工程 支护方案优化 预制型钢预应力组合支撑
在线阅读 下载PDF
建设工程设计方案数字化审查技术与应用研究
16
作者 李佳雪 王履华 +1 位作者 郑光辉 沈健 《自然资源信息化》 2025年第2期19-24,共6页
审查技术是实施“多规合一”的关键支撑技术。为了提升建设工程设计方案数字化审查的效率和准确性,本文基于规则引擎、空间数据管理、多CAD平台适配等技术,设计了审查规则可扩展、具备跨CAD平台能力的快速数字化审查技术路线,并研发了... 审查技术是实施“多规合一”的关键支撑技术。为了提升建设工程设计方案数字化审查的效率和准确性,本文基于规则引擎、空间数据管理、多CAD平台适配等技术,设计了审查规则可扩展、具备跨CAD平台能力的快速数字化审查技术路线,并研发了建设工程设计方案数字化审查系统。该系统利用数字化技术,对建设工程设计方案进行编制、标准化、审查,提供建设工程设计方案编制、审查、入库一体化等功能,并在开发环境实现了建设工程设计方案辅助编制、图形质检、成果检查、成果入库等流程,验证了技术路线的可行性,为建设工程设计方案的数字化审查提供了有效的技术支持。 展开更多
关键词 国土空间规划 建设工程 设计方案 规则引擎 适配器模式 数字化审查
在线阅读 下载PDF
水库枢纽工程中无人机倾斜摄影技术的应用研究
17
作者 张学中 《工程建设与设计》 2025年第18期85-87,共3页
针对传统测绘技术精度低、可视化不足等问题,分析了无人机倾斜摄影技术的实景模型重构过程,并以某水库枢纽工程为研究对象,探讨了无人机倾斜摄影技术的测绘精度。结果表明,无人机倾斜摄影技术在水库枢纽工程的基本地形图测绘中解译进度... 针对传统测绘技术精度低、可视化不足等问题,分析了无人机倾斜摄影技术的实景模型重构过程,并以某水库枢纽工程为研究对象,探讨了无人机倾斜摄影技术的测绘精度。结果表明,无人机倾斜摄影技术在水库枢纽工程的基本地形图测绘中解译进度较快,适用性较好。 展开更多
关键词 无人机倾斜摄影技术 三维重构 水库枢纽工程 测绘方案
在线阅读 下载PDF
河道整治工程护岸设计方案比选研究
18
作者 谭健敏 《云南水力发电》 2025年第5期77-80,共4页
本研究通过对方案1和方案2的护岸设计进行比选研究,旨在探讨不同设计方案在河道整治工程中的适用性。实验利用两种不同形态的圆砾石材料,并在小型河道中模拟标准波浪条件下的波浪作用。通过对护岸形态演变、沙砾界面高程、潮间带变化以... 本研究通过对方案1和方案2的护岸设计进行比选研究,旨在探讨不同设计方案在河道整治工程中的适用性。实验利用两种不同形态的圆砾石材料,并在小型河道中模拟标准波浪条件下的波浪作用。通过对护岸形态演变、沙砾界面高程、潮间带变化以及砾石运动等方面的细致观察和分析,揭示方案1和方案2在护岸稳定性、形态特征和砾石运动等方面的异同。 展开更多
关键词 河道整治工程 护岸设计 方案比选 实验
在线阅读 下载PDF
受限空间下龙头山二线船闸建设方案与运行方式研究
19
作者 王志鹏 吴凌波 +2 位作者 范红霞 邓伟 胡鹏 《水运工程》 2025年第7期143-149,214,共8页
已建赣江龙头山枢纽位于弯道段,右岸一线船闸上下游引航道位于主流区,受枢纽运行和施工不完善影响,通航水流条件较为恶劣。拟在一线船闸右侧新建二线船闸,综合考虑对一线船闸的完善,提出降低现有隔流墙透空率并延长、增建一线船闸导航... 已建赣江龙头山枢纽位于弯道段,右岸一线船闸上下游引航道位于主流区,受枢纽运行和施工不完善影响,通航水流条件较为恶劣。拟在一线船闸右侧新建二线船闸,综合考虑对一线船闸的完善,提出降低现有隔流墙透空率并延长、增建一线船闸导航墙与靠船墩、新建下游护岸和辅以疏浚等措施,统筹优化二线船闸布置方案。采用整体物理模型试验的技术手段,在厂坝联合调度典型工况下验证两座船闸通航水流条件。结果表明,采用新型结构将隔流墙透空率降低至20%以内,同时泄水闸尽可能采用均匀开启方式,尤其是2 a一遇流量泄洪时,靠近船闸的20#~24#闸孔只能局开,可将一线船闸最大通航流量自5 000 m^(3)/s提高至5 a一遇的15 100 m^(3)/s,同时二线船闸最大通航流量也可达到5 a一遇。 展开更多
关键词 龙头山枢纽 受限条件 一线船闸完善工程 二线船闸 建设方案 运行方式
在线阅读 下载PDF
上一页 1 2 56 下一页 到第
使用帮助 返回顶部