期刊文献+
共找到681篇文章
< 1 2 35 >
每页显示 20 50 100
Review of Oil and Gas Development Life Cycle Project Management (LCPM)
1
作者 Yongqin Yan Haohan Liu 《Engineering(科研)》 2016年第3期74-78,共5页
The effective implementation of the project management plays a core roll in avoiding bad project use effect and waste of funds, caused by asset management planning and design errors or equipment selection errors;meanw... The effective implementation of the project management plays a core roll in avoiding bad project use effect and waste of funds, caused by asset management planning and design errors or equipment selection errors;meanwhile, it can effectively improve the operational efficiency of enterprise assets, lower operating costs and save resources. In June 1974, A. Gordon published a paper “3L Economics Concept” as the starting point, on the “Building and Quantity Surveying”, which is organized by the Royal Institution of Chartered Surveyors. In this paper, a review of domestic and foreign research, from 1974 to 2015, on the total life cycle management progress will be given, and then a comment on it will be established. After detailed investigation and analysis of related materials, we can draw a conclusion: the study of the oil and gas development project lifecycle management is just beginning now. Hence, building the whole life cycle planning index system in line with the characteristics of oil and gas development project is very necessary. 展开更多
关键词 project Life Cycle MANAGEMENT review
在线阅读 下载PDF
国家自然科学基金委员会交通与运载工程学科2025年度管理工作综述与展望
2
作者 王之中 印寅 +1 位作者 李智 陈俊杰 《交通运输工程学报》 北大核心 2026年第1期1-7,共7页
国家自然科学基金委员会交通与运载工程学科面向经济主战场与国家重大战略需求,持续强化“需求牵引、问题导向”,开展体系性、变革性、颠覆性、引领性研究;通过有组织科研,集聚学科力量,快速突破基础研究与应用落地的“技术峡谷”。概述... 国家自然科学基金委员会交通与运载工程学科面向经济主战场与国家重大战略需求,持续强化“需求牵引、问题导向”,开展体系性、变革性、颠覆性、引领性研究;通过有组织科研,集聚学科力量,快速突破基础研究与应用落地的“技术峡谷”。概述了2025年度交通与运载工程学科基金项目的申请、受理和资助情况,以重大、重点项目为牵引,剖析了学科开展体系性、颠覆性、原创性研究的典型案例,并解读了2026年度学科优先资助领域和重点项目指南。2026年度,学科拟重点资助以下方向:新型高效能载运工具设计与控制、多载运工具协同操作/作业、载运工具端到端自动驾驶测试、航空器一体化设计及其飞行控制、可重复使用航天运输系统/在轨加注等关键技术/关键装备,以及融合低空交通的综合立体交通网络规划与协同运行。 展开更多
关键词 交通与运载工程学科 项目管理 综述 优先资助领域 重点研究方向
原文传递
医疗卫生机构抗肿瘤新药临床试验立项审查中的分析与思考——基于合规性评估视角
3
作者 冯钰 储天晴 +1 位作者 颜波 陈仲林 《医药导报》 北大核心 2026年第4期735-740,共6页
目的在医学科技创新的新形势下,基于临床试验药品审评审批制度改革,为积极应对创新加速可能带来的管理风险,从药物临床试验机构(简称“机构”)视角对抗肿瘤创新药品临床试验的立项审查要点进行分析和探讨。方法通过查询文献、政策解读... 目的在医学科技创新的新形势下,基于临床试验药品审评审批制度改革,为积极应对创新加速可能带来的管理风险,从药物临床试验机构(简称“机构”)视角对抗肿瘤创新药品临床试验的立项审查要点进行分析和探讨。方法通过查询文献、政策解读及工作实践,了解法规对于机构传统立项审查职责的要求,分析优先审评审批制度下机构立项审查要点的新变革所带来的合规性方面的挑战。结果当前,国家药品监督管理局(NMPA)批准创新药品注册临床试验的形式灵活多变,机构应当关注核心“批准文件”的五大属性,即特异性、阶段性、完整效力性、合理性和必要性,并准确识别相应的风险点,制定不同的审查策略。结论在国家行政审批部门灵活多样的准入模式下,机构应当积极思考如何制定一套高效且普适的审评机制,涵盖包括对“批准文件”的特异性、阶段性、完整效力性等多种属性的考量,以及对临床试验合理性和必要性等的评估,从而以多个维度确保临床试验的高质量发展和高水平安全。 展开更多
关键词 医学科技创新 临床试验 立项审查 合规性
暂未订购
2025年度国家自然科学基金力学学科评审工作综述
4
作者 陈猛 李涧青 +2 位作者 周岩 苗鸿臣 张攀峰 《力学进展》 北大核心 2026年第1期275-283,共9页
本文介绍了2025年度力学学科国家自然科学基金项目评审相关情况,统计分析了各类项目的申请和资助情况,阐述了2025年度评审工作中的改革举措和在评审过程中遇到的问题.期望引起力学科研人员的关注,共同做好力学学科国家自然科学基金的资... 本文介绍了2025年度力学学科国家自然科学基金项目评审相关情况,统计分析了各类项目的申请和资助情况,阐述了2025年度评审工作中的改革举措和在评审过程中遇到的问题.期望引起力学科研人员的关注,共同做好力学学科国家自然科学基金的资助工作. 展开更多
关键词 国家自然科学基金 力学学科 项目评审 资助情况
在线阅读 下载PDF
科学资助机构同行评议改革实践及启示
5
作者 谢鹏亚 任真 +2 位作者 徐进 邹丽雪 叶尔达纳·肯吉别克 《科技管理研究》 2026年第2期248-255,共8页
同行评议过程中存在马太效应、非共识项目难以胜出、效率低下和人工智能使用不规范等问题,不利于科学资助机构有效配置科研资源或是保障项目质量。为破解上述难题,本研究采用广泛调研与系统梳理相结合的方法,深入剖析近年来美国国家科... 同行评议过程中存在马太效应、非共识项目难以胜出、效率低下和人工智能使用不规范等问题,不利于科学资助机构有效配置科研资源或是保障项目质量。为破解上述难题,本研究采用广泛调研与系统梳理相结合的方法,深入剖析近年来美国国家科学基金会、英国研究与创新署等国外代表性科学资助机构在同行评议改革中的典型实践,梳理各类针对性解决措施。研究结果表明:规范生成式人工智能的使用、设立同行评议学院、合理使用评价指标、尝试抽签制和一票“复活”制,是我国同行评议制度改革的核心方向,将国际先进改革经验与我国现有制度进行创造性地本土化适配,是将其转化为切实可行实践方案的关键。该研究成果不仅为中国完善同行评议制度提供了兼具针对性与可操作性的启示建议,更有助于提升我国科学资助机构评议工作的透明度与公信力,为科研创新提供更优质的制度保障。 展开更多
关键词 同行评议 科学资助机构 项目评审 改革实践 国家自然科学基金委员会
在线阅读 下载PDF
基于项目化学习的“基因工程”专题复习教学实践
6
作者 柴志瑾 《生物学教学》 北大核心 2026年第2期31-35,共5页
以“探秘猪心移植人体”项目化学习,开展“基因工程”专题复习的教学实践。从围绕重要概念创设项目情境、聚焦驱动性问题搭建项目路径、依托反馈评价推进项目实施三个方面,探讨了如何黏合知识点间的联系,打破传统模块复习模式,高效落实... 以“探秘猪心移植人体”项目化学习,开展“基因工程”专题复习的教学实践。从围绕重要概念创设项目情境、聚焦驱动性问题搭建项目路径、依托反馈评价推进项目实施三个方面,探讨了如何黏合知识点间的联系,打破传统模块复习模式,高效落实高三生物学专题复习内容的教学策略和方法。 展开更多
关键词 专题复习 项目化学习 基因工程 心脏移植
在线阅读 下载PDF
专家库建设对科技项目评审的作用与优化研究
7
作者 余飞龙 龙小华 余成越 《江苏科技信息》 2026年第4期25-29,共5页
文章围绕科技项目评审专家库的建设与应用展开研究,阐述了专家库在保障评审专业性、公正性及提供决策依据方面的重要作用,系统剖析了当前专家库在选拔标准、信息管理、抽取机制与行为监督4个环节存在的主要问题。在此基础上,从优化遴选... 文章围绕科技项目评审专家库的建设与应用展开研究,阐述了专家库在保障评审专业性、公正性及提供决策依据方面的重要作用,系统剖析了当前专家库在选拔标准、信息管理、抽取机制与行为监督4个环节存在的主要问题。在此基础上,从优化遴选流程、加强信息维护、创新智能匹配、完善监督激励等方面,提出了提升专家库应用效能的具体策略。研究旨在为构建更加科学、高效、可靠的科技评审支撑体系提供参考,以助力科技创新高质量发展。 展开更多
关键词 专家库 项目评审 有效应用
在线阅读 下载PDF
基于层次分析法的项目评审研究
8
作者 张逊 周小易 《价值工程》 2026年第2期37-39,共3页
项目评审是确保项目可行性和成功实施的关键步骤。本文探讨了层次分析法(AHP)作为一种有效的决策分析工具进行评审研究。首先介绍了项目评审的重要性,接着阐述层次分析法的基本原理及其在决策分析中的优势。然后,以Y省设施农业项目评审... 项目评审是确保项目可行性和成功实施的关键步骤。本文探讨了层次分析法(AHP)作为一种有效的决策分析工具进行评审研究。首先介绍了项目评审的重要性,接着阐述层次分析法的基本原理及其在决策分析中的优势。然后,以Y省设施农业项目评审为例,详细描述了层次分析法在项目评审过程中的具体步骤和应用方法,包括问题的层次结构构建、指标和因素的权重确定、各方案的评估与比较等,以及其带来的决策支持和效果验证。最后讨论了AHP方法在实际操作中可能遇到的挑战和应对策略,并总结了其在项目评审中的局限性和改进空间。 展开更多
关键词 层次分析法 项目评审 决策分析 设施农业
在线阅读 下载PDF
高三化学单元复习课“水溶液中的离子反应与平衡”项目式教学——覆铜板刻蚀废液中铜离子含量测定方法的确定
9
作者 孙敏 佘平平 +1 位作者 温利权 安德成 《化学教育(中英文)》 北大核心 2026年第1期53-61,共9页
以“碘量法测定覆铜板刻蚀废液中铜离子的含量”为项目主题,拆解为碘量法“测定原理的建立”“测定过程的优化”“真实情境的应用”等3个子项目,设计层层递进的实验探究活动和微型滴定模拟实验,在实践应用中复习“水溶液中的离子反应与... 以“碘量法测定覆铜板刻蚀废液中铜离子的含量”为项目主题,拆解为碘量法“测定原理的建立”“测定过程的优化”“真实情境的应用”等3个子项目,设计层层递进的实验探究活动和微型滴定模拟实验,在实践应用中复习“水溶液中的离子反应与平衡”的知识,梳理形成分析水溶液中复杂反应的思维模型,进一步发展微粒观、变化观和平衡观,提高解决复杂实际问题的能力,提升对化学学科价值的认识,发展化学核心素养。 展开更多
关键词 碘量法 项目化学习 离子反应与平衡 单元复习
原文传递
危大工程专项施工方案监理审查要点与智能化监管研究
10
作者 罗孝清 《智能城市应用》 2026年第2期74-77,共4页
危险性较大的分部分项工程(以下简称“危大工程”)的安全管理作为建筑工程领域安全生产的重要环节,专项施工方案的合规性与科学性对施工的安全成效有着直接的关联。监理单位作为工程安全管控体系中的重要主体,其对于专项施工方案的审查... 危险性较大的分部分项工程(以下简称“危大工程”)的安全管理作为建筑工程领域安全生产的重要环节,专项施工方案的合规性与科学性对施工的安全成效有着直接的关联。监理单位作为工程安全管控体系中的重要主体,其对于专项施工方案的审查质量对工程建设的稳定性、合规性、安全性以及建筑行业的发展有着直接的影响。文中对目前监理审查及监管工作中所存在的问题进行了深入分析,在此基础上融入智能化技术,为提升危大工程监理审查效率和监管水平提供参考,从而推动建筑行业高质量发展。 展开更多
关键词 危大工程 专项施工方案 监理审查 智能化监管 安全管控
在线阅读 下载PDF
周家门沟泥石流特征及防治方案建议
11
作者 魏小斌 《全面腐蚀控制》 2026年第2期167-169,共3页
泥石流破坏力大,严重威胁山区安全,本文以漳县周家门沟泥石流为研究对象,分析其发育特征、成灾机理。针对既有工程过流不足等问题,提出“拦挡坝+排导渠”综合治理方案。结果表明,此方案通过中上游拦粗排细及下游规顺流路,显著控制风险,... 泥石流破坏力大,严重威胁山区安全,本文以漳县周家门沟泥石流为研究对象,分析其发育特征、成灾机理。针对既有工程过流不足等问题,提出“拦挡坝+排导渠”综合治理方案。结果表明,此方案通过中上游拦粗排细及下游规顺流路,显著控制风险,确保居民安全,为同类治理提供参考。 展开更多
关键词 周家门沟 泥石流特征 既有工程评述 防治方案
在线阅读 下载PDF
PERT and CPM in Project Management with Practical Examples
12
作者 Karibo Benaiah Bagshaw 《American Journal of Operations Research》 2021年第4期215-226,共12页
This paper reviewed the concepts of Project Evaluation Review Technique and<span style="font-family:Verdana;"> Critical Path Method in project management with practical examples. The methods and succes... This paper reviewed the concepts of Project Evaluation Review Technique and<span style="font-family:Verdana;"> Critical Path Method in project management with practical examples. The methods and success of quantitative decision-making approaches in project management through t</span><span style="font-family:Verdana;">he use of project evaluation review technique and the critical path method as regards project duration and critical activities of a project, were discussed. The review found that while both methods are effective in achieving success in project management, the relationship and connectivity of activities involved in a project life cycle are key aspects. The paper concludes that the project evaluation review technique is more effective when the duration of the project is uncertain, while the critical path method is effective when the project’s end time is certain. The paper, therefore, recommends that to achieve maximum operative efficiency in utilizing resources in project management, p</span><span style="font-family:Verdana;">rior to commencing the execution of a project, all required resources to cover every activity must be assembled and prioritized to eliminate interruptions that could bring delay and unnecessary cost implications. Again, policies focused on improving project execution should be implemented in developing nations to minimize the many cases of failed and delayed projects. Subsequently, stakeholders in projects must be given the right, under the law, to prosecute the government, its agencies and/or the executors of projects for failure to execute a project on schedule.</span> 展开更多
关键词 ACTIVITIES Critical Path Method project Evaluation review Technique project Management
在线阅读 下载PDF
基于总-详分层管控的建设项目用地合规性审查机制研究 被引量:1
13
作者 邓木林 朱江 +2 位作者 欧阳效福 周艺霖 夏剑琴 《西部人居环境学刊》 北大核心 2025年第1期188-194,共7页
国土空间用途管制是国土空间规划实施的关键环节和国土空间开发与保护的核心制度。建设项目用地合规性审查是国土空间用途管制制度改革的重要内容。过去由于城乡规划和土地利用规划的管控对象和机制不同,造成建设项目在规划审批上存在... 国土空间用途管制是国土空间规划实施的关键环节和国土空间开发与保护的核心制度。建设项目用地合规性审查是国土空间用途管制制度改革的重要内容。过去由于城乡规划和土地利用规划的管控对象和机制不同,造成建设项目在规划审批上存在较多不协调,带来建设项目难以落地的问题。随着国土空间规划体系建立和实施,在“多规合一”和全域全要素管控要求下,如何建立统一的建设项目用地合规性审查机制是各级自然资源管理部门关注的重点问题。本研究在梳理过去城乡规划和土地利用规划管控机制特点的基础上,对新时期国土空间体系下建设项目用地合规性审查机制进行了探索,提出基于总—详分层,城镇开发边界内外差异化的项目用地管控思路,并建议按技术修正、一般调整和重大调整等情形分类确定项目用地规划调整方式,为我国国土空间用途管制制度完善提供思路建议。 展开更多
关键词 国土空间用途管制 国土空间规划 总—详分层管控 建设项目 审查机制
在线阅读 下载PDF
评审方式选择对科技项目评审结果的影响——以省级科技计划项目为例 被引量:1
14
作者 夏野 蔡萌 王守文 《科技创新发展战略研究》 2025年第3期27-38,共12页
随着科技体制改革深化与创新驱动发展战略推进,我国科研经费投入逐年增加,科技项目规模持续扩大,对科技项目遴选机制提出更高要求。当前,专家评审制在我国科技项目遴选中被广泛应用,是实现国家治理体系和治理能力现代化的内在要求,也是... 随着科技体制改革深化与创新驱动发展战略推进,我国科研经费投入逐年增加,科技项目规模持续扩大,对科技项目遴选机制提出更高要求。当前,专家评审制在我国科技项目遴选中被广泛应用,是实现国家治理体系和治理能力现代化的内在要求,也是提升科学决策质量和优化科技资源配置的重要支撑。然而,专家评审过程中的主观性和差异性可能影响到评审结果的科学性与公正性。针对这一问题,采用双因素方差分析方法,以省级科技项目评审数据为样本,比较会议评审、通信评审和“双盲”评审对科技项目评审结果的影响。研究发现,评审方式的选择对评审结果影响显著,其中,双盲评审方式下,项目自身因素的方差解释率最优,能最大程度减少专家主观因素干扰,反映项目真实水平。此外,针对专家评审中打分离散度较大的问题,提出偏离值优化策略并进行检验,结果表明能够进一步提升评审结果的准确性。 展开更多
关键词 科技项目 项目评审 专家评审制 评审方式 双因素方差分析 “双盲”评审 同行评议
在线阅读 下载PDF
联合三支决策与熵权TOPSIS的专家反评估模型 被引量:2
15
作者 余鹰 朱锋 +3 位作者 付红剑 罗逸文 钱进 郑宇超 《计算机应用》 北大核心 2025年第5期1424-1431,共8页
在科技项目评审活动中,评审专家的评审质量对于最终评价结果的准确性和公信力具有十分重要的影响。为确保评价结果的公正客观,对评审专家进行反评估显得尤为必要。通过对评审专家的个人基本情况、专业水平和评审业绩3个方面进行分析,构... 在科技项目评审活动中,评审专家的评审质量对于最终评价结果的准确性和公信力具有十分重要的影响。为确保评价结果的公正客观,对评审专家进行反评估显得尤为必要。通过对评审专家的个人基本情况、专业水平和评审业绩3个方面进行分析,构建了一套专家反评估评价指标体系。在此基础上,提出一种联合三支决策与基于熵权的逼近理想解排序法(TOPSIS)的专家反评估模型。该模型利用三支决策理论解决由于熵权法对数据的过度依赖而造成的权重失真问题。当指标权重出现异常时,模型将根据设定的阈值将待评估专家集合划分为正域、负域和边界域,并分别实施专家入库、专家出库和延迟评价策略;当指标权重正常或者得到修正后,则采用TOPSIS对评审专家进行评分排序。通过对某企业科技项目历史评审数据的实证分析可知,所提模型可以融合决策者的经验判断与待评专家的固有信息,实现主客观的统一,从而确保对评审专家进行科学、公正的评价,为构建高质量的专家库提供决策参考。 展开更多
关键词 三支决策 熵权法 逼近理想解排序法 科技项目评审 专家反评估
在线阅读 下载PDF
2025年度地球化学学科国家自然科学基金项目申请、评审与资助成果分析
16
作者 郑袁明 肖军 孙杨 《地球科学进展》 北大核心 2025年第10期1032-1041,共10页
对国家自然科学基金委员会地球科学部地球化学学科(申请代码D03)2025年度各类基金项目的申报情况和2024年底结题项目的情况进行了系统分析。相较于2024年度,2025年度地区科学基金项目的申请数量有所增加,面上项目和青年科学基金项目(C类... 对国家自然科学基金委员会地球科学部地球化学学科(申请代码D03)2025年度各类基金项目的申报情况和2024年底结题项目的情况进行了系统分析。相较于2024年度,2025年度地区科学基金项目的申请数量有所增加,面上项目和青年科学基金项目(C类)略有减少;青年科学基金项目(C类)连续2年的申请量明显低于面上项目。近5年来,申请项目依托单位的总数量连续增长,表层地球化学(D0310)继续成为学科新的增长点。2025年度地球化学学科4项项目因未按要求提供相关材料而未予受理。2025年度地球化学学科面上项目、青年科学基金项目(C类)和地区科学基金项目的送审率分别为154.7%、154.7%和141.7%,资助率分别为17.9%、18.4%和11.1%,平均资助金额分别为53.1万元/项、30.0万元/项和30.9万元/项。2024年度面上项目、青年科学基金项目(C类)和地区科学基金项目的结题项目以及2021年度立项的青年科学基金项目(B类)结题成果和第一标注成果有待加强。近年来,地球化学学科申请体量小、增长慢的特点仍未改观。未来应在保证地球化学学科优势方向的基础上,加强基础研究与目标导向和国家需求的深入结合,促进学科内交叉、跨学科交叉和跨学部交叉研究,拓展地球化学学科研究的深度与广度。 展开更多
关键词 地球化学 项目申请 项目评审 资助方案 项目结题
原文传递
基于历史评价离群度量的专家评分动态赋权模型
17
作者 孟恭 斯庆托雅 《工程技术研究》 2025年第13期41-43,共3页
在装备研制项目评审过程中,评审专家组成员来自不同的领域,对不同评审项目的熟悉程度不同。常规的均值评分方法存在对某领域不熟悉的专家给出不恰当评分的现象。基于此,文章提出一种基于专家历史评价离群度量的评分汇总方法,基于每位专... 在装备研制项目评审过程中,评审专家组成员来自不同的领域,对不同评审项目的熟悉程度不同。常规的均值评分方法存在对某领域不熟悉的专家给出不恰当评分的现象。基于此,文章提出一种基于专家历史评价离群度量的评分汇总方法,基于每位专家的历史评审记录与最终评分结果,估计该专家对不同项目评审领域的熟悉程度,从而为专家组成员的分项打分赋予不同的权重。基于具体案例,证明了该方法能够有效避免专家对项目给出不当评审结论,有助于评审项目合理、公平推进。 展开更多
关键词 工程装备 项目评审 专家评审 离群度量 动态加权
在线阅读 下载PDF
医疗新技术新项目院感审查流程化管理实践探索 被引量:1
18
作者 杨璐 朱越献 +3 位作者 王敏芳 丁黎敏 叶文怡 干铁儿 《中华医院感染学杂志》 北大核心 2025年第6期956-960,共5页
目的对医疗新技术新项目的医院感染管理(以下简称“院感”)审查流程化管理实践进行总结,为其他医疗机构提供参考依据。方法收集浙江省中医院2018-2023年院感审查的新技术新项目相关资料,对审查流程和管理实践进行总结。通过构建医疗新... 目的对医疗新技术新项目的医院感染管理(以下简称“院感”)审查流程化管理实践进行总结,为其他医疗机构提供参考依据。方法收集浙江省中医院2018-2023年院感审查的新技术新项目相关资料,对审查流程和管理实践进行总结。通过构建医疗新技术新项目的医院感染管理评价指标、开展院感审查流程化管理,对可能带来的感染风险进行评估,明确相应的感染防控措施,对已经实施的新技术新项目进行追踪闭环管理。结果629项医疗新技术新项目进行了院感审核和追踪闭环管理,其中医技药499项(占比79.33%)、护理130项(占比20.67%)。审核结果中606项为同意(占比96.34%)、14项为修改后同意(占比2.23%)、3项为重审后同意(占比0.48%)、6项不同意(占比0.95%)。风险评估中5项为高风险项目(占比0.79%)、624项为低风险项目(占比99.21%),审核通过的项目在临床应用追踪中未发现严重医院感染或感染聚集事件。结论该实践从源头上控制了医院感染风险,进一步规范了新技术新项目的临床应用,为促进医疗机构新技术新项目规范化应用提供参考。 展开更多
关键词 医疗新技术 医疗新项目 院感审查 评价指标
原文传递
利益相关者视域下科研项目同行评议质量优化研究 被引量:1
19
作者 张琳 何善平 徐干城 《河南师范大学学报(自然科学版)》 北大核心 2025年第6期136-144,F0002,共10页
科研项目的同行评议质量直接影响科研资源配置的公正性与有效性.基于利益相关者理论,运用“权力-合法性-紧迫性”的三维识别框架,系统识别评议过程中的多元参与主体,并分析其利益诉求与治理困境.研究发现,在当前优化科研项目同行评议的... 科研项目的同行评议质量直接影响科研资源配置的公正性与有效性.基于利益相关者理论,运用“权力-合法性-紧迫性”的三维识别框架,系统识别评议过程中的多元参与主体,并分析其利益诉求与治理困境.研究发现,在当前优化科研项目同行评议的过程中需要继续明确流程规范、建设文化生态、规避过程干扰、保障资源投入、落实监督评估.提出以“多元主体共治”为导向的优化路径,强调自上而下的机制改革与自下而上的主体参与协同推进,形成多元主体共建共享的治理格局,推动科研项目同行评议向高质量、协同化方向发展. 展开更多
关键词 利益相关者 科研项目 同行评议 质量优化
在线阅读 下载PDF
科研项目评审中的专家基础性制度研究 被引量:2
20
作者 杨好 肖小溪 《科学学研究》 北大核心 2025年第7期1526-1533,1568,共9页
科研项目评审中的专家基础性制度是指与评审专家的遴选、评价和激励相关的基础制度安排,在保障科研项目评审有效性中发挥着基础和核心作用。本文基于国际案例分析,梳理形成了美、英、加、德、澳等国科研项目资助机构在开展项目评审中与... 科研项目评审中的专家基础性制度是指与评审专家的遴选、评价和激励相关的基础制度安排,在保障科研项目评审有效性中发挥着基础和核心作用。本文基于国际案例分析,梳理形成了美、英、加、德、澳等国科研项目资助机构在开展项目评审中与专家遴选和激励有关的管理细节,主要涉及专家入库遴选和管理、利益冲突规避和专家评审行为的后评价三大方面,并对这些管理细节的合理性分别开展了比较和辨析,以期为我国科研项目资助机构进一步完善和健全我国科研项目评审中的专家基础制度、提升科研项目评审有效性提供支撑和参考。 展开更多
关键词 项目评审 专家入库和管理 利益冲突 专家评审行为
原文传递
上一页 1 2 35 下一页 到第
使用帮助 返回顶部