Critical Barriers to Traditional Project Progress Measurement: Perspectives of Ghanaian Construction Professionals
1
作者 James Cofie Danku Kofi Agyekum Francis Terkpertey Asare 《Journal of Building Construction and Planning Research》 2020年第2期119-137,共19页
Accurate project progress measurement is critical for effective project management. Besides guarantying smooth work progress, it affords project managers the chance to identify early warning signs for peremptory remed... Accurate project progress measurement is critical for effective project management. Besides guarantying smooth work progress, it affords project managers the chance to identify early warning signs for peremptory remedial actions to keep the project on schedule and to budget. However, pertinent barriers can suppress the realization of the benefits of an accurate assessment of construction progress. This study aims to identify, examine and prioritize the critical barriers militating against accurate project progress measurement in the Ghanaian construction industry. Sixteen barriers identified from the literature were administered in a questionnaire survey to professionals with tier one construction firms and consultants. Sixty experienced construction professionals practising with tier-one construction firms and consultancy services took part in the survey. The relative importance index technique was used to rank the factors and correlation in responses of the two parties tested by the Mann-Whitney <em>U</em> statistics. The most critical barriers perceived by the professionals were 1) Reliance on Supervisor’s Judgement, 2) Generic and Non-Systematic Approach, 3) Variable Quality of Data and 4) Intricate Measurement Reports. Other highly ranked barriers include 5) Lack of Timely Information, 6) Laborious Data Gathering and 7) Quality Integration Constraint. The findings underpin the need to minimize dependence on subjective opinions and mere experiences of supervisors for assessment of project progress in this age of information technology. Incorporation of a level of automation into traditional progress methods will not only reduce human errors introduced into manually collected data but facilitate visualization of progress reports. Contiguous to a clear specification of the method of progress measurement in the contract document, a system that conveniently integrates cost, time and scope of work into progress measurement must be pursued. Addressing these identified critical barriers will consolidate current construction progress management practices. 展开更多
关键词 project progress Measurement Critical Barriers Construction Professionals Traditional Methods Ghana
在线阅读 下载PDF
基于Project软件的多层级工程进度控制模型研究
2
作者 陈路 刘流 《自动化应用》 2025年第11期277-279,共3页
提出了一种基于Microsoft Project的软件多层级工程进度控制模型,结合Power BI、SQL Server、MATLAB和Python,提出动态闭环控制方法。通过任务管理、资源调度和进度跟踪等模块优化工程进度管理工作,显著提升进度管理精准性与效率,为复... 提出了一种基于Microsoft Project的软件多层级工程进度控制模型,结合Power BI、SQL Server、MATLAB和Python,提出动态闭环控制方法。通过任务管理、资源调度和进度跟踪等模块优化工程进度管理工作,显著提升进度管理精准性与效率,为复杂工程提供高效实用的决策支持。 展开更多
关键词 project软件 工程进度控制 多层级模型 仿真分析 系统测试
在线阅读 下载PDF
Changbei Project in Progress
3
《China Oil & Gas》 CAS 2000年第2期57-57,共1页
关键词 project Changbei project in progress CNPC
在线阅读 下载PDF
“Inverse Projection Method”Model in DEA to Measure Technological Progress
4
作者 安景文 徐向阳 《International Journal of Mining Science and Technology》 SCIE EI 1997年第2期73-76,共4页
In view of the problems in measuring technological progress by DEA model, premias for DEA application is analyzed in this paper. An extended model of DEA is also raised for the cases running counter to the premisess. ... In view of the problems in measuring technological progress by DEA model, premias for DEA application is analyzed in this paper. An extended model of DEA is also raised for the cases running counter to the premisess. And precision about the results of the two models is analyzed. 展开更多
关键词 DEA TECHNOLOGICAL progress inverse-projection method
在线阅读 下载PDF
Pengze Nuclear Power Project in steady progress
5
《Electricity》 2010年第4期13-13,共1页
At the end of September, the approach way and linkage roads of Pengze Nuclear Power Project, a project developed by China Power Investment Corporation in Jiangxi Province, were all linked up, laying a solid foundation... At the end of September, the approach way and linkage roads of Pengze Nuclear Power Project, a project developed by China Power Investment Corporation in Jiangxi Province, were all linked up, laying a solid foundation for the construction of the project. 展开更多
关键词 project Pengze Nuclear Power project in steady progress
在线阅读 下载PDF
Research on Construction Progress and Quality Supervision of Civil Construction Project
6
作者 ZHANGHaohao 《外文科技期刊数据库(文摘版)工程技术》 2022年第7期108-112,共5页
At the present stage, in the specific construction project management, the construction management mainly focuses on materials, personnel, machinery, space and other resources, and then try to ensure the construction ... At the present stage, in the specific construction project management, the construction management mainly focuses on materials, personnel, machinery, space and other resources, and then try to ensure the construction safety, construction quality, construction progress and construction civilization. Progress management and construction quality management are very important contents of the smooth development of civil engineering projects. The above is the analysis of the construction progress management and construction quality management of civil engineering projects, hoping to further improve the management level of civil engineering projects, and accelerate the development pace of Chinas construction industry. 展开更多
关键词 civil construction engineering project construction progress quality supervision
原文传递
Three Gorges Dam project in great progress as planned
7
《Electricity》 1996年第3期26-26,共1页
It hasn’t been easy, but almost all of the work on the Three Gorges Project is on schedule, according to a corporation overseeing construction of the dam. The China Yangtze Three Gorges Project Development Corporatio... It hasn’t been easy, but almost all of the work on the Three Gorges Project is on schedule, according to a corporation overseeing construction of the dam. The China Yangtze Three Gorges Project Development Corporation has reported that contractors and other staff are working hard to ensure that the flood season does not slow the dam project. The company recently detailed the mammoth tasks that have taken place so 展开更多
关键词 Three Gorges Dam project in great progress as planned
在线阅读 下载PDF
Two power projects under BOT funding scheme progressing smoothly
8
《Electricity》 1997年第1期48-48,共1页
关键词 BOT Two power projects under BOT funding scheme progressing smoothly
在线阅读 下载PDF
The Urban and Rural Network Construction and Retrofit Projects Has Gained Great Progress
9
《Electricity》 2000年第2期48-48,共1页
关键词 The Urban and Rural Network Construction and Retrofit projects Has Gained Great progress
在线阅读 下载PDF
LATEST PROGRESS AND KEY ISSUES IN WEST-TO-EAST GAS TRANSMISSION PROJECT
10
《China Oil & Gas》 CAS 2000年第4期36-37,共2页
关键词 EAST LATEST progress AND KEY ISSUES IN WEST-TO-EAST GAS TRANSMISSION project GAS
在线阅读 下载PDF
PROJECTS WON 1998 CAS AWARDS FOR S&T PROGRESS AND FOR INVENTIONS
11
《Bulletin of the Chinese Academy of Sciences》 1999年第1期33-49,共17页
The CAS Awards for S&T Progress and the CAS Awards for Inventions are two major awards issued by the Chinese Academy of Sciences to recognize major research results and inventions produced by CAS scientists that h... The CAS Awards for S&T Progress and the CAS Awards for Inventions are two major awards issued by the Chinese Academy of Sciences to recognize major research results and inventions produced by CAS scientists that have contributed greatly to the promotion of S&T progress, and social and economic development. In 1998, 12 research works won the CAS Awards for Inventions and 94 works won the CAS Awards for S&T Progress. The following are profiles of some of the prize-wining projects. 展开更多
关键词 projectS WON 1998 CAS AWARDS FOR S&T progress AND FOR INVENTIONS CAS HIGH
在线阅读 下载PDF
Project on Interaction between Agro-ecosystems and Global Change Making Progress
12
《Bulletin of the Chinese Academy of Sciences》 2000年第3期143-145,共3页
A research project on interaction between agroecosystems and global change has been accepted as a Category Ⅰ contribution to IGBP-GCTE (International Geosphere-Biosphere Programme-Global Change & Terrestrial Ecos... A research project on interaction between agroecosystems and global change has been accepted as a Category Ⅰ contribution to IGBP-GCTE (International Geosphere-Biosphere Programme-Global Change & Terrestrial Ecosystems) Core Research, the highest-level support GCTE has offered to an individual research project so far. This was confirmed by Prof. Noble, GCTE Chairman, in a letter to Prof. Peng Shaolin, Principal Investigator of 展开更多
关键词 project on Interaction between Agro-ecosystems and Global Change Making progress In IGBP GCTE
在线阅读 下载PDF
PROJECTS WON 1997 CAS AWARDS FOR NATURAL SCIENCES AND FOR S&T PROGRESS
13
《Bulletin of the Chinese Academy of Sciences》 1998年第2期97-109,共13页
The CAS Awards for Natural Sciences and the CAS Awards for S&T Progress are two major awards issued by the Chinese Academy of Sciences. The former is to recognize the scientific findings and research results by wh... The CAS Awards for Natural Sciences and the CAS Awards for S&T Progress are two major awards issued by the Chinese Academy of Sciences. The former is to recognize the scientific findings and research results by which CAS scientists bring to light natural phenomena, laws and properties in their basic and applied basic research. The latter is to award major inventions or research results produced by CAS scientists that have contributed greatly to the promotion of S&T progress, and social and economic development. In 1997, 68 research projects won the CAS Awards for Natural Sciences, and 106 research works won CAS Awards for S&T Progress. The following are profiles of some of the prize-wining projects. 展开更多
关键词 projectS WON 1997 CAS AWARDS FOR NATURAL SCIENCES AND FOR S&T progress CAS HIGH
在线阅读 下载PDF
基于小任务大挑战的项目进阶教学模式探讨——以传感器课程为例 被引量:1
14
作者 杨健晟 杨兴 +1 位作者 张梅 党长青 《高教学刊》 2025年第11期120-123,共4页
该研究探讨一种新的项目式教学(PBL)模式,旨在通过“大挑战”引领“小任务”的进阶方式,替代传统的多个简单项目重复的教学模式。该文首先分析当前项目式教学中存在的问题,如项目与实际工程脱节和过度关注项目数量。针对这些问题,研究... 该研究探讨一种新的项目式教学(PBL)模式,旨在通过“大挑战”引领“小任务”的进阶方式,替代传统的多个简单项目重复的教学模式。该文首先分析当前项目式教学中存在的问题,如项目与实际工程脱节和过度关注项目数量。针对这些问题,研究提出个人任务、小组任务和大组任务的三层次任务结构,以促进学生的知识掌握、团队协作和系统思维能力。该模式的实施不仅提升学生的技术技能,还增强他们的沟通能力和批判性思维能力。研究表明,深度项目能够更好地满足现代工程的复杂性需求,为学生未来的职业发展奠定基础。该文为教育工作者提供切实的理论与实践指导,以引入深度项目,从而培养学生的综合能力。 展开更多
关键词 项目式教学 深度项目 进阶学习 工程应用能力 传感器
在线阅读 下载PDF
基于PROJECT BUS驱动的机械类本科生创新能力培养 被引量:6
15
作者 蒙艳玫 卢福宁 +3 位作者 唐治宏 董振 陈远玲 陆冠成 《实验室研究与探索》 CAS 北大核心 2014年第2期194-198,共5页
研究了基于PROJECT BUS(项目总线)驱动的机械类本科生创新能力培养模式,以市场需求定制人才培养目标,以实验中心开放性实验室和本科生专业导师制为依托,以面向工程实际的产学研真实项目研发作为学习载体,将知识的拓展与项目研究开发过... 研究了基于PROJECT BUS(项目总线)驱动的机械类本科生创新能力培养模式,以市场需求定制人才培养目标,以实验中心开放性实验室和本科生专业导师制为依托,以面向工程实际的产学研真实项目研发作为学习载体,将知识的拓展与项目研究开发过程的迭代相结合,用项目研发的渐进思想与知识构建的思路相对应组织自主实践内容,通过项目BUS贯穿机械专业主干课程知识和创新能力培养过程的始终。有效解决了目前机械类本科生缺乏实际项目研发经验和团队合作精神,创新实践能力弱的关键问题,在理论研究和实践探索取得了显著成效。 展开更多
关键词 project BUS驱动 渐进式项目团队 金字塔型导师队伍 创新能力培养模式 机械类本科生
在线阅读 下载PDF
新加坡记忆工程实践的最新进展及经验启示
16
作者 牟沁妍 加小双 《北京档案》 北大核心 2025年第7期30-35,共6页
新加坡记忆工程作为国家记忆工程的经典案例之一,在启动十二周年之际推出了全新的门户网站,标志着工程迈入新的发展阶段。论文通过内容分析法与比较分析法,对比分析了新加坡记忆工程在旧门户网站阶段与新门户网站阶段的不同特征。研究表... 新加坡记忆工程作为国家记忆工程的经典案例之一,在启动十二周年之际推出了全新的门户网站,标志着工程迈入新的发展阶段。论文通过内容分析法与比较分析法,对比分析了新加坡记忆工程在旧门户网站阶段与新门户网站阶段的不同特征。研究表明,新阶段的记忆工程更加注重多模态资源的收集,公众参与程度得到进一步深化,记忆主题呈现多元化趋势,机构间协调配合进一步深化,并且在门户网页设计上更加注重用户体验。基于此,论文总结出四条重要经验启示:推动记忆资源收集多模态化、注重反映社会真实记忆与多元声音、兼顾主流叙事与社会叙事、充分发挥协同合作潜力。这些启示为我国记忆工程的发展提供了有力参考。 展开更多
关键词 新加坡记忆工程 最新进 展记忆工程
在线阅读 下载PDF
工程项目进度管理与造价控制的协同机制探讨 被引量:2
17
作者 景羿乔 《工程造价管理》 2025年第1期57-61,共5页
研究聚焦于工程项目中进度管理与造价控制的协同机制。文章通过实现一个实时信息共享平台,显著提高了项目的数据透明度和响应速度。同时,通过定期举办的风险管理工作坊,项目团队得以系统地识别和应对潜在风险,增强了项目的适应性和灵活... 研究聚焦于工程项目中进度管理与造价控制的协同机制。文章通过实现一个实时信息共享平台,显著提高了项目的数据透明度和响应速度。同时,通过定期举办的风险管理工作坊,项目团队得以系统地识别和应对潜在风险,增强了项目的适应性和灵活性。案例分析揭示了这些策略在实际应用中的有效性,展示了如何通过协同管理实践减少项目延误和成本超支,有效提升了工程项目管理的整体效率和经济效益。 展开更多
关键词 工程项目管理 进度管理 造价控制 协同机制
在线阅读 下载PDF
基于BIM+GIS的引调水工程施工进度管理 被引量:1
18
作者 侯征军 覃家皓 +1 位作者 朱晓斌 张荣 《水利水电快报》 2025年第5期132-135,共4页
引调水工程具有工程规模大、建设周期长、施工条件复杂、协调难度大等特点。为解决传统进度管理存在的信息不对称、数据更新滞后、无法动态调优等问题,以珠江三角洲水资源配置工程为例,通过将BIM+GIS技术与进度管理业务融合,建立数据共... 引调水工程具有工程规模大、建设周期长、施工条件复杂、协调难度大等特点。为解决传统进度管理存在的信息不对称、数据更新滞后、无法动态调优等问题,以珠江三角洲水资源配置工程为例,通过将BIM+GIS技术与进度管理业务融合,建立数据共享标准与通道,利用施工工效计算动态推演关键线路。结果表明:该技术可及时预警滞后线路,结合BIM+GIS的可视化表达,提高了工程进度分析决策效率,可助力工程安全、高效完工。研究成果可为引调水工程进度管理提供参考。 展开更多
关键词 引调水工程 施工进度管理 施工工效 BIM+GIS 珠江三角洲水资源配置工程
在线阅读 下载PDF
Microsoft Project 2003在工程建设进度管理中的应用 被引量:2
19
作者 张振虎 孙虹 《江苏建筑》 2011年第4期106-107,117,共3页
目前可供工程建设人员使用的项目管理软件很多。Microsoft Project 2003作为一款功能强大,使用灵活、方便的项目管理软件,可以帮助用户有效地计划、设计和管理项目。文章结合工程实例论述了如何使用Project 2003编制工程建设进度计划,... 目前可供工程建设人员使用的项目管理软件很多。Microsoft Project 2003作为一款功能强大,使用灵活、方便的项目管理软件,可以帮助用户有效地计划、设计和管理项目。文章结合工程实例论述了如何使用Project 2003编制工程建设进度计划,如何对工程建设进度计划的执行情况进行监督控制。 展开更多
关键词 MICROSOFT project 2003 工程建设 进度管理 进度计划 进度控制
在线阅读 下载PDF
新形势下新能源项目进度目标顺利实现的措施 被引量:1
20
作者 金诚 《云南水力发电》 2025年第2期161-165,共5页
进度管理是工程管理的重要方面之一。当前形势下,新能源建设项目如何顺利实现进度目标,是工程建设管理人员必须考虑的问题。总结了新能源建设项目的特点,分析了影响工程进度的因素,提出“严格建设程序、争取各方支持、统筹工程管理、技... 进度管理是工程管理的重要方面之一。当前形势下,新能源建设项目如何顺利实现进度目标,是工程建设管理人员必须考虑的问题。总结了新能源建设项目的特点,分析了影响工程进度的因素,提出“严格建设程序、争取各方支持、统筹工程管理、技术支持保障、及时解决问题”的措施,取得良好成效。 展开更多
关键词 新能源建设 进度管理 进度目标 项目特点