期刊文献+
共找到893篇文章
< 1 2 45 >
每页显示 20 50 100
Critical Barriers to Traditional Project Progress Measurement: Perspectives of Ghanaian Construction Professionals
1
作者 James Cofie Danku Kofi Agyekum Francis Terkpertey Asare 《Journal of Building Construction and Planning Research》 2020年第2期119-137,共19页
Accurate project progress measurement is critical for effective project management. Besides guarantying smooth work progress, it affords project managers the chance to identify early warning signs for peremptory remed... Accurate project progress measurement is critical for effective project management. Besides guarantying smooth work progress, it affords project managers the chance to identify early warning signs for peremptory remedial actions to keep the project on schedule and to budget. However, pertinent barriers can suppress the realization of the benefits of an accurate assessment of construction progress. This study aims to identify, examine and prioritize the critical barriers militating against accurate project progress measurement in the Ghanaian construction industry. Sixteen barriers identified from the literature were administered in a questionnaire survey to professionals with tier one construction firms and consultants. Sixty experienced construction professionals practising with tier-one construction firms and consultancy services took part in the survey. The relative importance index technique was used to rank the factors and correlation in responses of the two parties tested by the Mann-Whitney <em>U</em> statistics. The most critical barriers perceived by the professionals were 1) Reliance on Supervisor’s Judgement, 2) Generic and Non-Systematic Approach, 3) Variable Quality of Data and 4) Intricate Measurement Reports. Other highly ranked barriers include 5) Lack of Timely Information, 6) Laborious Data Gathering and 7) Quality Integration Constraint. The findings underpin the need to minimize dependence on subjective opinions and mere experiences of supervisors for assessment of project progress in this age of information technology. Incorporation of a level of automation into traditional progress methods will not only reduce human errors introduced into manually collected data but facilitate visualization of progress reports. Contiguous to a clear specification of the method of progress measurement in the contract document, a system that conveniently integrates cost, time and scope of work into progress measurement must be pursued. Addressing these identified critical barriers will consolidate current construction progress management practices. 展开更多
关键词 project progress Measurement Critical Barriers Construction Professionals Traditional Methods Ghana
在线阅读 下载PDF
Changbei Project in Progress
2
《China Oil & Gas》 CAS 2000年第2期57-57,共1页
关键词 project Changbei project in progress CNPC
在线阅读 下载PDF
“Inverse Projection Method”Model in DEA to Measure Technological Progress
3
作者 安景文 徐向阳 《International Journal of Mining Science and Technology》 SCIE EI 1997年第2期73-76,共4页
In view of the problems in measuring technological progress by DEA model, premias for DEA application is analyzed in this paper. An extended model of DEA is also raised for the cases running counter to the premisess. ... In view of the problems in measuring technological progress by DEA model, premias for DEA application is analyzed in this paper. An extended model of DEA is also raised for the cases running counter to the premisess. And precision about the results of the two models is analyzed. 展开更多
关键词 DEA TECHNOLOGICAL progress inverse-projection method
在线阅读 下载PDF
Pengze Nuclear Power Project in steady progress
4
《Electricity》 2010年第4期13-13,共1页
At the end of September, the approach way and linkage roads of Pengze Nuclear Power Project, a project developed by China Power Investment Corporation in Jiangxi Province, were all linked up, laying a solid foundation... At the end of September, the approach way and linkage roads of Pengze Nuclear Power Project, a project developed by China Power Investment Corporation in Jiangxi Province, were all linked up, laying a solid foundation for the construction of the project. 展开更多
关键词 project Pengze Nuclear Power project in steady progress
在线阅读 下载PDF
Research on Construction Progress and Quality Supervision of Civil Construction Project
5
作者 ZHANGHaohao 《外文科技期刊数据库(文摘版)工程技术》 2022年第7期108-112,共5页
At the present stage, in the specific construction project management, the construction management mainly focuses on materials, personnel, machinery, space and other resources, and then try to ensure the construction ... At the present stage, in the specific construction project management, the construction management mainly focuses on materials, personnel, machinery, space and other resources, and then try to ensure the construction safety, construction quality, construction progress and construction civilization. Progress management and construction quality management are very important contents of the smooth development of civil engineering projects. The above is the analysis of the construction progress management and construction quality management of civil engineering projects, hoping to further improve the management level of civil engineering projects, and accelerate the development pace of Chinas construction industry. 展开更多
关键词 civil construction engineering project construction progress quality supervision
原文传递
Three Gorges Dam project in great progress as planned
6
《Electricity》 1996年第3期26-26,共1页
It hasn’t been easy, but almost all of the work on the Three Gorges Project is on schedule, according to a corporation overseeing construction of the dam. The China Yangtze Three Gorges Project Development Corporatio... It hasn’t been easy, but almost all of the work on the Three Gorges Project is on schedule, according to a corporation overseeing construction of the dam. The China Yangtze Three Gorges Project Development Corporation has reported that contractors and other staff are working hard to ensure that the flood season does not slow the dam project. The company recently detailed the mammoth tasks that have taken place so 展开更多
关键词 Three Gorges Dam project in great progress as planned
在线阅读 下载PDF
Two power projects under BOT funding scheme progressing smoothly
7
《Electricity》 1997年第1期48-48,共1页
关键词 BOT Two power projects under BOT funding scheme progressing smoothly
在线阅读 下载PDF
The Urban and Rural Network Construction and Retrofit Projects Has Gained Great Progress
8
《Electricity》 2000年第2期48-48,共1页
关键词 The Urban and Rural Network Construction and Retrofit projects Has Gained Great progress
在线阅读 下载PDF
LATEST PROGRESS AND KEY ISSUES IN WEST-TO-EAST GAS TRANSMISSION PROJECT
9
《China Oil & Gas》 CAS 2000年第4期36-37,共2页
关键词 EAST LATEST progress AND KEY ISSUES IN WEST-TO-EAST GAS TRANSMISSION project GAS
在线阅读 下载PDF
PROJECTS WON 1998 CAS AWARDS FOR S&T PROGRESS AND FOR INVENTIONS
10
《Bulletin of the Chinese Academy of Sciences》 1999年第1期33-49,共17页
The CAS Awards for S&T Progress and the CAS Awards for Inventions are two major awards issued by the Chinese Academy of Sciences to recognize major research results and inventions produced by CAS scientists that h... The CAS Awards for S&T Progress and the CAS Awards for Inventions are two major awards issued by the Chinese Academy of Sciences to recognize major research results and inventions produced by CAS scientists that have contributed greatly to the promotion of S&T progress, and social and economic development. In 1998, 12 research works won the CAS Awards for Inventions and 94 works won the CAS Awards for S&T Progress. The following are profiles of some of the prize-wining projects. 展开更多
关键词 projectS WON 1998 CAS AWARDS FOR S&T progress AND FOR INVENTIONS CAS HIGH
在线阅读 下载PDF
Project on Interaction between Agro-ecosystems and Global Change Making Progress
11
《Bulletin of the Chinese Academy of Sciences》 2000年第3期143-145,共3页
A research project on interaction between agroecosystems and global change has been accepted as a Category Ⅰ contribution to IGBP-GCTE (International Geosphere-Biosphere Programme-Global Change & Terrestrial Ecos... A research project on interaction between agroecosystems and global change has been accepted as a Category Ⅰ contribution to IGBP-GCTE (International Geosphere-Biosphere Programme-Global Change & Terrestrial Ecosystems) Core Research, the highest-level support GCTE has offered to an individual research project so far. This was confirmed by Prof. Noble, GCTE Chairman, in a letter to Prof. Peng Shaolin, Principal Investigator of 展开更多
关键词 project on Interaction between Agro-ecosystems and Global Change Making progress In IGBP GCTE
在线阅读 下载PDF
PROJECTS WON 1997 CAS AWARDS FOR NATURAL SCIENCES AND FOR S&T PROGRESS
12
《Bulletin of the Chinese Academy of Sciences》 1998年第2期97-109,共13页
The CAS Awards for Natural Sciences and the CAS Awards for S&T Progress are two major awards issued by the Chinese Academy of Sciences. The former is to recognize the scientific findings and research results by wh... The CAS Awards for Natural Sciences and the CAS Awards for S&T Progress are two major awards issued by the Chinese Academy of Sciences. The former is to recognize the scientific findings and research results by which CAS scientists bring to light natural phenomena, laws and properties in their basic and applied basic research. The latter is to award major inventions or research results produced by CAS scientists that have contributed greatly to the promotion of S&T progress, and social and economic development. In 1997, 68 research projects won the CAS Awards for Natural Sciences, and 106 research works won CAS Awards for S&T Progress. The following are profiles of some of the prize-wining projects. 展开更多
关键词 projectS WON 1997 CAS AWARDS FOR NATURAL SCIENCES AND FOR S&T progress CAS HIGH
在线阅读 下载PDF
基于Project软件的多层级工程进度控制模型研究
13
作者 陈路 刘流 《自动化应用》 2025年第11期277-279,共3页
提出了一种基于Microsoft Project的软件多层级工程进度控制模型,结合Power BI、SQL Server、MATLAB和Python,提出动态闭环控制方法。通过任务管理、资源调度和进度跟踪等模块优化工程进度管理工作,显著提升进度管理精准性与效率,为复... 提出了一种基于Microsoft Project的软件多层级工程进度控制模型,结合Power BI、SQL Server、MATLAB和Python,提出动态闭环控制方法。通过任务管理、资源调度和进度跟踪等模块优化工程进度管理工作,显著提升进度管理精准性与效率,为复杂工程提供高效实用的决策支持。 展开更多
关键词 project软件 工程进度控制 多层级模型 仿真分析 系统测试
在线阅读 下载PDF
OKR-STEP双引擎驱动的混合式教学模式设计与实践
14
作者 马丽 高敬礼 +1 位作者 李真 吕海莲 《计算机教育》 2026年第3期334-340,共7页
针对目前混合式教学中存在的目标不够明确、过程管理薄弱、实践不足、评价单一等问题,提出OKR-STEP双引擎驱动的混合式教学模式,以软件工程课程为例,从OKR-STEP模式内涵、课程OKR体系构建、混合式教学模式设计等方面,介绍该模式的实施过... 针对目前混合式教学中存在的目标不够明确、过程管理薄弱、实践不足、评价单一等问题,提出OKR-STEP双引擎驱动的混合式教学模式,以软件工程课程为例,从OKR-STEP模式内涵、课程OKR体系构建、混合式教学模式设计等方面,介绍该模式的实施过程,最后说明模式改革成效。 展开更多
关键词 OKR-STEP 项目驱动 混合式教学 能力进阶
在线阅读 下载PDF
基于PROJECT BUS驱动的机械类本科生创新能力培养 被引量:6
15
作者 蒙艳玫 卢福宁 +3 位作者 唐治宏 董振 陈远玲 陆冠成 《实验室研究与探索》 CAS 北大核心 2014年第2期194-198,共5页
研究了基于PROJECT BUS(项目总线)驱动的机械类本科生创新能力培养模式,以市场需求定制人才培养目标,以实验中心开放性实验室和本科生专业导师制为依托,以面向工程实际的产学研真实项目研发作为学习载体,将知识的拓展与项目研究开发过... 研究了基于PROJECT BUS(项目总线)驱动的机械类本科生创新能力培养模式,以市场需求定制人才培养目标,以实验中心开放性实验室和本科生专业导师制为依托,以面向工程实际的产学研真实项目研发作为学习载体,将知识的拓展与项目研究开发过程的迭代相结合,用项目研发的渐进思想与知识构建的思路相对应组织自主实践内容,通过项目BUS贯穿机械专业主干课程知识和创新能力培养过程的始终。有效解决了目前机械类本科生缺乏实际项目研发经验和团队合作精神,创新实践能力弱的关键问题,在理论研究和实践探索取得了显著成效。 展开更多
关键词 project BUS驱动 渐进式项目团队 金字塔型导师队伍 创新能力培养模式 机械类本科生
在线阅读 下载PDF
Microsoft Project 2003在工程建设进度管理中的应用 被引量:2
16
作者 张振虎 孙虹 《江苏建筑》 2011年第4期106-107,117,共3页
目前可供工程建设人员使用的项目管理软件很多。Microsoft Project 2003作为一款功能强大,使用灵活、方便的项目管理软件,可以帮助用户有效地计划、设计和管理项目。文章结合工程实例论述了如何使用Project 2003编制工程建设进度计划,... 目前可供工程建设人员使用的项目管理软件很多。Microsoft Project 2003作为一款功能强大,使用灵活、方便的项目管理软件,可以帮助用户有效地计划、设计和管理项目。文章结合工程实例论述了如何使用Project 2003编制工程建设进度计划,如何对工程建设进度计划的执行情况进行监督控制。 展开更多
关键词 MICROSOFT project 2003 工程建设 进度管理 进度计划 进度控制
在线阅读 下载PDF
基于3D点云的智慧光伏工程进度无人机监控
17
作者 舒茂龙 赵二保 +1 位作者 邱明 耿耿 《计算机仿真》 2026年第1期147-151,共5页
光伏工地处于户外,环境复杂,范围普遍较大,监控工程进度的决策变量选取难度大。传统无人机对工程进度的监控大多是直接利用二维数据实现,缺乏空间性分析,无人机飞行路径代价较大,对关键三维形态指标无法及时提取,导致对施工工期和强度... 光伏工地处于户外,环境复杂,范围普遍较大,监控工程进度的决策变量选取难度大。传统无人机对工程进度的监控大多是直接利用二维数据实现,缺乏空间性分析,无人机飞行路径代价较大,对关键三维形态指标无法及时提取,导致对施工工期和强度的测算出现一定误差。为此,提出基于3D点云的智慧光伏工程进度无人机监控方法。构建无人机最优路径总代价函数并对其完成寻优。引入灰狼优化算法完成无人机飞行路径规划并采集光伏工程3D点云数据;分析采集到的3D点云数据匹配偏差,提取最小二乘形态指标,拼接3D点云数据获得智慧光伏工程三维模型;利用投影技术将模型映射到二维平面,叠加生成视图与施工图像位移误差,实现智慧光伏工程进度监控。实验结果表明,所提方法可有效测算施工工期和强度,数据处理吞吐量较高,波动范围为250MB/s~350MB/s。以上测试结果证明了上述方法可实现高效便捷的获取智慧光伏工程进度。 展开更多
关键词 智慧光伏 工程进度 无人机 三维点云 遗传算法
在线阅读 下载PDF
基于开源互动项目的人工智能导论四阶段教学改革
18
作者 董丽 张博闻 +1 位作者 陈钒 王鑫 《计算机教育》 2026年第2期217-220,共4页
针对人工智能导论课程中学生对前沿技术接受度低、教学内容更新滞后及实践资源受限的问题,提出基于开源互动项目的人工智能导论四阶段教学改革思路,阐述如何以开源互动项目为核心进行融“了解、入门、理解、实践”于一体的四阶段渐进式... 针对人工智能导论课程中学生对前沿技术接受度低、教学内容更新滞后及实践资源受限的问题,提出基于开源互动项目的人工智能导论四阶段教学改革思路,阐述如何以开源互动项目为核心进行融“了解、入门、理解、实践”于一体的四阶段渐进式教学改革,最后说明教学改革效果。 展开更多
关键词 人工智能导论 教学改革 开源互动项目 渐进式教学
在线阅读 下载PDF
LIM技术在风景园林项目中的应用进展
19
作者 刘瑞生 龚晨 +2 位作者 廖谋祺 麦湘颖 高伟 《广州建筑》 2026年第3期113-120,共8页
风景园林信息模型(LIM)技术作为BIM在风景园林领域的延伸,通过多源数据整合与全生命周期管理能力,为风景园林的数字化转型提供了新范式。本文旨在系统梳理LIM技术在风景园林项目中的应用进展,明确其优势与局限,为行业数字化转型提供可... 风景园林信息模型(LIM)技术作为BIM在风景园林领域的延伸,通过多源数据整合与全生命周期管理能力,为风景园林的数字化转型提供了新范式。本文旨在系统梳理LIM技术在风景园林项目中的应用进展,明确其优势与局限,为行业数字化转型提供可参考的技术路径。采用文献综述与案例列举相结合的方法,首先总结LIM的技术体系构成,进而结合设计、施工、运维三个项目阶段梳理LIM技术的具体应用路径。研究发现,LIM技术在设计阶段需协同6类软件平台,实现从点云处理、微气候模拟到信息模型构建的全流程整合;在施工阶段,可通过虚拟建造与碰撞监测,实现涵盖进度、安全、成本的动态报表生成;在运维阶段,需整合6类结构化数据,以及6类非结构化数据,形成可检索、可调用的项目数据库。同时,当前LIM在数据格式兼容性、植被参数化建模、跨平台协同等方面仍存在明显短板。LIM技术虽已初步形成技术框架,但其标准化体系尚未成熟,亟需建立统一的标准化语义框架、参数化模型库与数据接口。未来应加强LIM与GIS、BIM、IOT的深度融合,通过地域性实践,推动“数据驱动”设计范式转型。 展开更多
关键词 LIM技术 风景园林项目 全生命周期 数字化 应用进展
在线阅读 下载PDF
培养工程思维的实践:载体、路径与策略——以“船的研究”为例
20
作者 邓李君 潘琪琪 《教育与装备研究》 2026年第3期26-30,共5页
在加强科技教育的背景下,工程思维的培育具有重要的价值,工程设计与制作是链接科学、技术、数学、人文艺术的关键环节。在小学科学大单元、长周期且以“产品制作”为主题的学习中,可以通过进阶式跨学科主题项目式学习的载体培养工程思... 在加强科技教育的背景下,工程思维的培育具有重要的价值,工程设计与制作是链接科学、技术、数学、人文艺术的关键环节。在小学科学大单元、长周期且以“产品制作”为主题的学习中,可以通过进阶式跨学科主题项目式学习的载体培养工程思维。该研究以小学科学五年级大单元课程《船的研究》为例,提炼出“四维链式”进阶学习路径,通过大概念统摄的“需求链”、项目式学习推进的“驱动链”、工程思维贯穿的“晋级链”、跨学科主题融合的“知识链”,遵循情感激发、实践创新、迭代改进的策略,能够降低工程造物的难度,展现工程思维培养的进阶性,从而更扎实地提高学生工程思维能力,提高学生科技素养。 展开更多
关键词 工程思维 学习进阶 跨学科主题项目式学习
在线阅读 下载PDF
上一页 1 2 45 下一页 到第
使用帮助 返回顶部