The results of an accident analysis for the loss of offsite power(LOOP)scenario in a reference Bushehr-1 VVER-1000/V446 nuclear power plant(NPP)are presented in this paper.This study attempted to provide a better anal...The results of an accident analysis for the loss of offsite power(LOOP)scenario in a reference Bushehr-1 VVER-1000/V446 nuclear power plant(NPP)are presented in this paper.This study attempted to provide a better analysis of LOOP accident management by integrating deterministic and probabilistic approaches.The RELAP5 code was used to investigate the occurrence of specific thermal–hydraulic phenomena.The probabilistic safety assessment of the LOOP accident is presented using the SAPHIRE software.LOOP accident data were extracted from the Bushehr NPP final safety analysis reports and probabilistic safety analysis reports.A deterministic approach was used to reduce the core damage frequency in the probabilistic analysis of LOOP accidents.The probabilistic approach was used to better observe the philosophy of defense in depth and safety margins in the deterministic analysis of the LOOP accident.The results show that the integration of the two approaches in LOOP accident investigations improved accident control.展开更多
An industrial park is one of the typical en ergy con sumption schemes in power systems owing to the heavy in dustrial loads and their abilities to resp ond to electricity price cha nges.Therefore,en ergy in tegrati on...An industrial park is one of the typical en ergy con sumption schemes in power systems owing to the heavy in dustrial loads and their abilities to resp ond to electricity price cha nges.Therefore,en ergy in tegrati on in the industrial sector is significant.Accordingly,the concept of industrial virtual power plant(IVPP)has been proposed to deal with such problems.This study demonstrates an IVPP model to man age resources in an eco-i ndustrial park,including en ergy storage systems,dema nd resp onse(DR)resources,and distributed energies.In addition,fuzzy theory is used to cha nge the deterministic system constraints to fuzzy parameters,considering the uncertainty of renewable energy,and fuzzy chance constraints are then set based on the credibility theory.By maximizi ng the daily ben efits of the IVPP owners in day-ahead markets,DR and energy storage systems can be scheduled economically.Therefore,the energy between the grid and IVPP can flow in both directions:the surplus renewable electricity of IVPP can be sold in the market;when the electricity gen erated in side IVPP is not enough for its use,IVPP can also purchase power through the market.Case studies based on three win d-level scenarios dem on strate the efficie nt syn ergies betwee n IVPP resources.The validatio n results indicate that IVPP can optimize the supply and demand resources in in dustrial parks,thereby decarbonizing the power systems.展开更多
Pakistan is facing acute energy crises since last few years. Due to shortage of fuel oil and its sky touching prices, it seems very uneconomical to generate electricity from fuel oil. In order to generate cheap electr...Pakistan is facing acute energy crises since last few years. Due to shortage of fuel oil and its sky touching prices, it seems very uneconomical to generate electricity from fuel oil. In order to generate cheap electricity we have to rely on renewable energy resources. To address these challenges, wind power generation is among the popular options in the world which is now being considered in Pakistan as well. However unremitting change in wind speed from calm to stormy introduces real challenges. Storing wind energy in batteries during the periods of low demand seems an expensive option, especially when dealing with large scale power generation. Due to incessantly varying nature of wind speed, it is not feasible to rely only on wind power for cheap power production. Also, it is not thriftily possible to construct separate transmission line. However if we integrate wind power with hydro power, we can utilize the maximum possible transmission capacity. Existing hydro power station operating in that area or pumped storage scheme can be used. This paper is an attempt to analyze coordination of wind generation with hydro power in those areas of Pakistan where both wind and hydro power sources exist. In this paper, different issues have been analyzed taking case study of Dargai. This paper is first attempt in Pakistan about integration of wind and hydro power to draw some general conclusions and to point out some areas in which further research can be done.展开更多
In this paper,high-power LED with many integrated chips is used as thermal resistance analysis research object, and we do thermal resistance testing technology research on it. We put forward the thermocouple point con...In this paper,high-power LED with many integrated chips is used as thermal resistance analysis research object, and we do thermal resistance testing technology research on it. We put forward the thermocouple point contact test method. According to the principle that LED forward voltage changes with temperature,LED heat sink to surface temperature distribution is studied directly in the test,and then we analyze the thermal resistance of high-power LED with many integrated chips when its secondary packaging is introduced. This method makes the measurement of thermal resistance of LED more rapid and convenient. It provides an effective assessment method for the analysis of high power LED device design and engineering application.展开更多
With the rapid development of wind power in China, the grid integration of wind energy systems has imposed lots of influences on the security and operation of power grids. This paper provides an overview of the charac...With the rapid development of wind power in China, the grid integration of wind energy systems has imposed lots of influences on the security and operation of power grids. This paper provides an overview of the characteristics of the wind power development in terms of distribution area, wind farm scale, integration voltage level and performance of wind turbines. The paper also presents an analysis of the problems and reasons emerging from the wind power integration in China and ends with putting forward some measures and suggestions about the wind power integration and operation for reference.展开更多
In this paper,we propose a joint power and frequency allocation algorithm considering interference protection in the integrated satellite and terrestrial network(ISTN).We efficiently utilize spectrum resources by allo...In this paper,we propose a joint power and frequency allocation algorithm considering interference protection in the integrated satellite and terrestrial network(ISTN).We efficiently utilize spectrum resources by allowing user equipment(UE)of terrestrial networks to share frequencies with satellite networks.In order to protect the satellite terminal(ST),the base station(BS)needs to control the transmit power and frequency resources of the UE.The optimization problem involves maximizing the achievable throughput while satisfying the interference protection constraints of the ST and the quality of service(QoS)of the UE.However,this problem is highly nonconvex,and we decompose it into power allocation and frequency resource scheduling subproblems.In the power allocation subproblem,we propose a power allocation algorithm based on interference probability(PAIP)to address channel uncertainty.We obtain the suboptimal power allocation solution through iterative optimization.In the frequency resource scheduling subproblem,we develop a heuristic algorithm to handle the non-convexity of the problem.The simulation results show that the combination of power allocation and frequency resource scheduling algorithms can improve spectrum utilization.展开更多
Power integrated isolation structures play a crucial role in the field of power electronics,especially in silicon carbide(SiC)devices,where challenges such as high leakage current and insufficient voltage endurance ar...Power integrated isolation structures play a crucial role in the field of power electronics,especially in silicon carbide(SiC)devices,where challenges such as high leakage current and insufficient voltage endurance are prevalent.This paper introduces a novel isolation technology based on vanadium ion implantation,achieving high-performance SiC monolithic integration through deep energy level trapping engineering and three-dimensional composite isolation design.The core technologies include:semi-insulating layer+dielectric trench co-isolation,high-precision process control,high-temperature compatibility optimization,ultra-high breakdown field strength,support for 10kV class IGBT/MOSFET integration,and a 30-50%increase in chip area utilization,combining high performance with low-cost advantages.展开更多
The Sine and Wormhole Energy Whale Optimization Algorithm(SWEWOA)represents an advanced solution method for resolving Optimal Power Flow(OPF)problems in power systems equipped with Flexible AC Transmission System(FACT...The Sine and Wormhole Energy Whale Optimization Algorithm(SWEWOA)represents an advanced solution method for resolving Optimal Power Flow(OPF)problems in power systems equipped with Flexible AC Transmission System(FACTS)devices which include Thyristor-Controlled Series Compensator(TCSC),Thyristor-Controlled Phase Shifter(TCPS),and Static Var Compensator(SVC).SWEWOA expands Whale Optimization Algorithm(WOA)through the integration of sine and wormhole energy features thus improving exploration and exploitation capabilities for efficient convergence in complex non-linear OPF problems.A performance evaluation of SWEWOA takes place on the IEEE-30 bus test system through static and dynamic loading scenarios where it demonstrates better results than five contemporary algorithms:Adaptive Chaotic WOA(ACWOA),WOA,Chaotic WOA(CWOA),Sine Cosine Algorithm Differential Evolution(SCADE),and Hybrid Grey Wolf Optimization(HGWO).The research shows that SWEWOA delivers superior generation cost reduction than other algorithms by reaching a minimum of 0.9%better performance.SWEWOA demonstrates superior power loss performance by achieving(P_(loss,min))at the lowest level compared to all other tested algorithms which leads to better system energy efficiency.The dynamic loading performance of SWEWOA leads to a 4.38%reduction in gross costs which proves its capability to handle different operating conditions.The algorithm achieves top performance in Friedman Rank Test(FRT)assessments through multiple performance metrics which verifies its consistent reliability and strong stability during changing power demands.The repeated simulations show that SWEWOA generates mean costs(C_(gen,min))and mean power loss values(P_(loss,min))with small deviations which indicate its capability to maintain cost-effective solutions in each simulation run.SWEWOA demonstrates great potential as an advanced optimization solution for power system operations through the results presented in this study.展开更多
The interconnect temperature of very large scale integration(VLSI) circuits keeps rising due to self-heating and substrate temperature, which can increase the delay and power dissipation of interconnect wires. The t...The interconnect temperature of very large scale integration(VLSI) circuits keeps rising due to self-heating and substrate temperature, which can increase the delay and power dissipation of interconnect wires. The thermal vias are regarded as a promising method to improve the temperature performance of VLSI circuits. In this paper, the extra thermal vias were used to decrease the delay and power dissipation of interconnect wires of VLSI circuits. Two analytical models were presented for interconnect temperature, delay and power dissipation with adding extra dummy thermal vias. The influence of the number of thermal vias on the delay and power dissipation of interconnect wires was analyzed and the optimal via separation distance was investigated. The experimental results show that the adding extra dummy thermal vias can reduce the interconnect average temperature, maximum temperature, delay and power dissipation. Moreover, this method is also suitable for clock signal wires with a large root mean square current.展开更多
A steam power plant can work as a dual purpose plant for simultaneous production of steam and elec-trical power. In this paper we seek the optimum integration of a steam power plant as a source and a site utility sys-...A steam power plant can work as a dual purpose plant for simultaneous production of steam and elec-trical power. In this paper we seek the optimum integration of a steam power plant as a source and a site utility sys-tem as a sink of steam and power. Estimation for the cogeneration potential prior to the design of a central utility system for site utility systems is vital to the targets for site fuel demand as well as heat and power production. In this regard, a new cogeneration targeting procedure is proposed for integration of a steam power plant and a site utility consisting of a process plant. The new methodology seeks the optimal integration based on a new cogenera-tion targeting scheme. In addition, a modified site utility grand composite curve(SUGCC) diagram is proposed and compared to the original SUGCC. A gas fired steam power plant and a process site utility is considered in a case study. The applicability of the developed procedure is tested against other design methods(STAR? and Thermoflex software) through a case study. The proposed method gives comparable results, and the targeting method is used for optimal integration of steam levels. Identifying optimal conditions of steam levels for integration is important in the design of utility systems, as the selection of steam levels in a steam power plant and site utility for integration greatly influences the potential for cogeneration and energy recovery. The integration of steam levels of the steam power plant and the site utility system in the case study demonstrates the usefulness of the method for reducing the overall energy consumption for the site.展开更多
Based on the research of wind power development policies, this paper put forward the reform directions to improve the disadvantages of the policies. The wind power’s grid integration status quo is introduced, and the...Based on the research of wind power development policies, this paper put forward the reform directions to improve the disadvantages of the policies. The wind power’s grid integration status quo is introduced, and the bottle neck of grid integration is analyzed. By the study on the economic benefits of wind power integration in China’s present stage, the results indicate that the wind power industry is in good condition of profits and the profits are higher with the increase of the wind resources in the areas. Through expanding the difference of the power purchase prices in different resource areas, it is beneficial for the nationwide harmonious development of wind power. At last, the present and future benefits of the energy conservation and emission reduction from wind power integration are estimated, which shows that the environmental benefits of "wind-thermal exchange" will be more and more outstanding along with the expansion of the scale of wind power.展开更多
Information resources integration for enterprises at present is fairly hot in the course of information construction, as well as difficult. To achieve this goal, different developers adopt different technical means an...Information resources integration for enterprises at present is fairly hot in the course of information construction, as well as difficult. To achieve this goal, different developers adopt different technical means and their implementation results are also diversified for various reasons. Hereunder, the article, taking the information construction and resources integration activities by Electric Power of Henan (EPH) as an example, deploys a deep analysis and discussion on necessity and essential factors and how to ensure high effect in the process of information integration.展开更多
This study presents a comprehensive impact analysis of the rotor angle stability of a proposed international connection between the Philippines and Sabah,Malaysia,as part of the Association of Southeast Asian Nations(...This study presents a comprehensive impact analysis of the rotor angle stability of a proposed international connection between the Philippines and Sabah,Malaysia,as part of the Association of Southeast Asian Nations(ASEAN)Power Grid.This study focuses on modeling and evaluating the dynamic performance of the interconnected system,considering the high penetration of renewable sources.Power flow,small signal stability,and transient stability analyses were conducted to assess the ability of the proposed linked power system models to withstand small and large disturbances,utilizing the Power Systems Analysis Toolbox(PSAT)software in MATLAB.All components used in the model are documented in the PSAT library.Currently,there is a lack of publicly available studies regarding the implementation of this specific system.Additionally,the study investigates the behavior of a system with a high penetration of renewable energy sources.Based on the findings,this study concludes that a system is generally stable when interconnection is realized,given its appropriate location and dynamic component parameters.Furthermore,the critical eigenvalues of the system also exhibited improvement as the renewable energy sources were augmented.展开更多
In the contemporary era,the global expansion of electrical grids is propelled by various renewable energy sources(RESs).Efficient integration of stochastic RESs and optimal power flow(OPF)management are critical for n...In the contemporary era,the global expansion of electrical grids is propelled by various renewable energy sources(RESs).Efficient integration of stochastic RESs and optimal power flow(OPF)management are critical for network optimization.This study introduces an innovative solution,the Gaussian Bare-Bones Levy Cheetah Optimizer(GBBLCO),addressing OPF challenges in power generation systems with stochastic RESs.The primary objective is to minimize the total operating costs of RESs,considering four functions:overall operating costs,voltage deviation management,emissions reduction,voltage stability index(VSI)and power loss mitigation.Additionally,a carbon tax is included in the objective function to reduce carbon emissions.Thorough scrutiny,using modified IEEE 30-bus and IEEE 118-bus systems,validates GBBLCO’s superior performance in achieving optimal solutions.Simulation results demonstrate GBBLCO’s efficacy in six optimization scenarios:total cost with valve point effects,total cost with emission and carbon tax,total cost with prohibited operating zones,active power loss optimization,voltage deviation optimization and enhancing voltage stability index(VSI).GBBLCO outperforms conventional techniques in each scenario,showcasing rapid convergence and superior solution quality.Notably,GBBLCO navigates complexities introduced by valve point effects,adapts to environmental constraints,optimizes costs while considering prohibited operating zones,minimizes active power losses,and optimizes voltage deviation by enhancing the voltage stability index(VSI)effectively.This research significantly contributes to advancing OPF,emphasizing GBBLCO’s improved global search capabilities and ability to address challenges related to local minima.GBBLCO emerges as a versatile and robust optimization tool for diverse challenges in power systems,offering a promising solution for the evolving needs of renewable energy-integrated power grids.展开更多
Based on conventional static line rating method, the actual current carrying capability of overhead conductors cannot be judged. Due to continuous increment in electricity demand and the difficulties associated with n...Based on conventional static line rating method, the actual current carrying capability of overhead conductors cannot be judged. Due to continuous increment in electricity demand and the difficulties associated with new line constructions, the overhead lines are therefore required to be rated based on a method that should establish their real-time capability in terms of electricity transmission. The method used to determine the real-time ampacity of overhead conductors not only can enhance their transmission capacity but can also help in allowing excessive renewable generation in the electricity network. In this research work, the issues related to analyzing an impact of wind power on periodical loading of overhead line as well as finding its static and dynamic ampacities with line current are investigated in detail. Moreover, the investigation related to finding a suitable location for the construction of a 60 MW wind farm is taken on board. Thereafter, the wind park is integrated with a regional grid, owned by Fortum Distribution AB. In addition to that, the electricity generated from the wind park is also calculated in this project. Later on, the work is devoted to finding the static and dynamic line ratings for “VL3” overhead conductor by using IEEE-738-2006 standard. Furthermore, the project also deals with finding the line current and making its comparison with maximum capacity of overhead conductor (VL3) for loading it in such a way that no any violation of safe ground clearance requirements is observed at all. Besides, the line current, knowing the conductor temperature when it transmits the required electricity in the presence of wind power generation is also an important factor to be taken into consideration. Therefore, based on real-time ambient conditions with actual line loading and with the help of IEEE-738-2006 standard, the conductor temperature is also calculated in this project. At the end, an economic analysis is performed to evaluate the financial advantages related to applying the dynamic line ratings approach in place of traditional static line ratings technique across an overhead conductor (VL3) and to know how much beneficial it is to temporarily postpone the rebuilding and/or construction of a new transmission line. Furthermore, an economic analysis related to wind power system is taken into consideration as well to get familiar with the costs related to building and connecting a 60 MW wind farm with the regional grid.展开更多
Appropriate wind power integration standards are of great importance to standardize wind power integration and guarantee the safety and stability of the power system. This article describes the wind power integration ...Appropriate wind power integration standards are of great importance to standardize wind power integration and guarantee the safety and stability of the power system. This article describes the wind power integration standards of China explicitly and explains several important points of the newly revised wind power integration standards of China in comparison with standards of Germany, Denmark, etc. The newly revised standards can meet the technical demand of China's large-scale centralized development of wind power, and guarantee the safety, stability and economy of the grid and wind farm.展开更多
Under this historical background, significant changes have taken place in many industries, especially in the material supply management of power companies. In this paper, the basic concepts and characteristics of the ...Under this historical background, significant changes have taken place in many industries, especially in the material supply management of power companies. In this paper, the basic concepts and characteristics of the supplier management system are firstly discussed, then the problems in the material supply process of the power company are discussed, and finally the right is given, and the reference is tried to provide for the relevant social people to promote the sustainable development of the power supply industry.展开更多
Denmark’ goal of being independent of fossil energy sources in 2050 puts forward great demands on all energy subsystems (electricity, heat, gas and transport, etc.) to be operated in a holistic manner. The Danish exp...Denmark’ goal of being independent of fossil energy sources in 2050 puts forward great demands on all energy subsystems (electricity, heat, gas and transport, etc.) to be operated in a holistic manner. The Danish experience and challenges of wind power integration and the development of district heating systems are summarized in this paper. How to optimally use the cross-sectoral flexibility by intelligent control (model predictive control-based) of the key coupling components in an integrated heat and power system including electrical heat pumps in the demand side, and thermal storage applications in buildings is investigated.展开更多
文摘The results of an accident analysis for the loss of offsite power(LOOP)scenario in a reference Bushehr-1 VVER-1000/V446 nuclear power plant(NPP)are presented in this paper.This study attempted to provide a better analysis of LOOP accident management by integrating deterministic and probabilistic approaches.The RELAP5 code was used to investigate the occurrence of specific thermal–hydraulic phenomena.The probabilistic safety assessment of the LOOP accident is presented using the SAPHIRE software.LOOP accident data were extracted from the Bushehr NPP final safety analysis reports and probabilistic safety analysis reports.A deterministic approach was used to reduce the core damage frequency in the probabilistic analysis of LOOP accidents.The probabilistic approach was used to better observe the philosophy of defense in depth and safety margins in the deterministic analysis of the LOOP accident.The results show that the integration of the two approaches in LOOP accident investigations improved accident control.
基金Department of Science and Technology of Guangdong Province(Project 2019B0909011001).
文摘An industrial park is one of the typical en ergy con sumption schemes in power systems owing to the heavy in dustrial loads and their abilities to resp ond to electricity price cha nges.Therefore,en ergy in tegrati on in the industrial sector is significant.Accordingly,the concept of industrial virtual power plant(IVPP)has been proposed to deal with such problems.This study demonstrates an IVPP model to man age resources in an eco-i ndustrial park,including en ergy storage systems,dema nd resp onse(DR)resources,and distributed energies.In addition,fuzzy theory is used to cha nge the deterministic system constraints to fuzzy parameters,considering the uncertainty of renewable energy,and fuzzy chance constraints are then set based on the credibility theory.By maximizi ng the daily ben efits of the IVPP owners in day-ahead markets,DR and energy storage systems can be scheduled economically.Therefore,the energy between the grid and IVPP can flow in both directions:the surplus renewable electricity of IVPP can be sold in the market;when the electricity gen erated in side IVPP is not enough for its use,IVPP can also purchase power through the market.Case studies based on three win d-level scenarios dem on strate the efficie nt syn ergies betwee n IVPP resources.The validatio n results indicate that IVPP can optimize the supply and demand resources in in dustrial parks,thereby decarbonizing the power systems.
文摘Pakistan is facing acute energy crises since last few years. Due to shortage of fuel oil and its sky touching prices, it seems very uneconomical to generate electricity from fuel oil. In order to generate cheap electricity we have to rely on renewable energy resources. To address these challenges, wind power generation is among the popular options in the world which is now being considered in Pakistan as well. However unremitting change in wind speed from calm to stormy introduces real challenges. Storing wind energy in batteries during the periods of low demand seems an expensive option, especially when dealing with large scale power generation. Due to incessantly varying nature of wind speed, it is not feasible to rely only on wind power for cheap power production. Also, it is not thriftily possible to construct separate transmission line. However if we integrate wind power with hydro power, we can utilize the maximum possible transmission capacity. Existing hydro power station operating in that area or pumped storage scheme can be used. This paper is an attempt to analyze coordination of wind generation with hydro power in those areas of Pakistan where both wind and hydro power sources exist. In this paper, different issues have been analyzed taking case study of Dargai. This paper is first attempt in Pakistan about integration of wind and hydro power to draw some general conclusions and to point out some areas in which further research can be done.
基金Sponsored by the Heilongjiang Provincial Project(Grant No.12511121)the Harbin City Innovation Talent Project(Grant No.2011RFXXG019)the National Science and Technology Support Project(Grant No.2012BAH28F02)
文摘In this paper,high-power LED with many integrated chips is used as thermal resistance analysis research object, and we do thermal resistance testing technology research on it. We put forward the thermocouple point contact test method. According to the principle that LED forward voltage changes with temperature,LED heat sink to surface temperature distribution is studied directly in the test,and then we analyze the thermal resistance of high-power LED with many integrated chips when its secondary packaging is introduced. This method makes the measurement of thermal resistance of LED more rapid and convenient. It provides an effective assessment method for the analysis of high power LED device design and engineering application.
文摘With the rapid development of wind power in China, the grid integration of wind energy systems has imposed lots of influences on the security and operation of power grids. This paper provides an overview of the characteristics of the wind power development in terms of distribution area, wind farm scale, integration voltage level and performance of wind turbines. The paper also presents an analysis of the problems and reasons emerging from the wind power integration in China and ends with putting forward some measures and suggestions about the wind power integration and operation for reference.
基金funded by State Key Laboratory of Micro-Spacecraft Rapid Design and Intelligent Cluster under Grant MS01240103the National Natural Science Foundation of China under Grant 62071146National 2011 Collaborative Innovation Center of Wireless Communication Technologies under Grant 2242022k60006.
文摘In this paper,we propose a joint power and frequency allocation algorithm considering interference protection in the integrated satellite and terrestrial network(ISTN).We efficiently utilize spectrum resources by allowing user equipment(UE)of terrestrial networks to share frequencies with satellite networks.In order to protect the satellite terminal(ST),the base station(BS)needs to control the transmit power and frequency resources of the UE.The optimization problem involves maximizing the achievable throughput while satisfying the interference protection constraints of the ST and the quality of service(QoS)of the UE.However,this problem is highly nonconvex,and we decompose it into power allocation and frequency resource scheduling subproblems.In the power allocation subproblem,we propose a power allocation algorithm based on interference probability(PAIP)to address channel uncertainty.We obtain the suboptimal power allocation solution through iterative optimization.In the frequency resource scheduling subproblem,we develop a heuristic algorithm to handle the non-convexity of the problem.The simulation results show that the combination of power allocation and frequency resource scheduling algorithms can improve spectrum utilization.
文摘Power integrated isolation structures play a crucial role in the field of power electronics,especially in silicon carbide(SiC)devices,where challenges such as high leakage current and insufficient voltage endurance are prevalent.This paper introduces a novel isolation technology based on vanadium ion implantation,achieving high-performance SiC monolithic integration through deep energy level trapping engineering and three-dimensional composite isolation design.The core technologies include:semi-insulating layer+dielectric trench co-isolation,high-precision process control,high-temperature compatibility optimization,ultra-high breakdown field strength,support for 10kV class IGBT/MOSFET integration,and a 30-50%increase in chip area utilization,combining high performance with low-cost advantages.
文摘The Sine and Wormhole Energy Whale Optimization Algorithm(SWEWOA)represents an advanced solution method for resolving Optimal Power Flow(OPF)problems in power systems equipped with Flexible AC Transmission System(FACTS)devices which include Thyristor-Controlled Series Compensator(TCSC),Thyristor-Controlled Phase Shifter(TCPS),and Static Var Compensator(SVC).SWEWOA expands Whale Optimization Algorithm(WOA)through the integration of sine and wormhole energy features thus improving exploration and exploitation capabilities for efficient convergence in complex non-linear OPF problems.A performance evaluation of SWEWOA takes place on the IEEE-30 bus test system through static and dynamic loading scenarios where it demonstrates better results than five contemporary algorithms:Adaptive Chaotic WOA(ACWOA),WOA,Chaotic WOA(CWOA),Sine Cosine Algorithm Differential Evolution(SCADE),and Hybrid Grey Wolf Optimization(HGWO).The research shows that SWEWOA delivers superior generation cost reduction than other algorithms by reaching a minimum of 0.9%better performance.SWEWOA demonstrates superior power loss performance by achieving(P_(loss,min))at the lowest level compared to all other tested algorithms which leads to better system energy efficiency.The dynamic loading performance of SWEWOA leads to a 4.38%reduction in gross costs which proves its capability to handle different operating conditions.The algorithm achieves top performance in Friedman Rank Test(FRT)assessments through multiple performance metrics which verifies its consistent reliability and strong stability during changing power demands.The repeated simulations show that SWEWOA generates mean costs(C_(gen,min))and mean power loss values(P_(loss,min))with small deviations which indicate its capability to maintain cost-effective solutions in each simulation run.SWEWOA demonstrates great potential as an advanced optimization solution for power system operations through the results presented in this study.
基金Supported by the Guangdong Provincial Natural Science Foundation of China(2014A030313441)the Guangzhou Science and Technology Project(201510010169)+1 种基金the Guangdong Province Science and Technology Project(2016B090918071,2014A040401076)the National Natural Science Foundation of China(61072028)
文摘The interconnect temperature of very large scale integration(VLSI) circuits keeps rising due to self-heating and substrate temperature, which can increase the delay and power dissipation of interconnect wires. The thermal vias are regarded as a promising method to improve the temperature performance of VLSI circuits. In this paper, the extra thermal vias were used to decrease the delay and power dissipation of interconnect wires of VLSI circuits. Two analytical models were presented for interconnect temperature, delay and power dissipation with adding extra dummy thermal vias. The influence of the number of thermal vias on the delay and power dissipation of interconnect wires was analyzed and the optimal via separation distance was investigated. The experimental results show that the adding extra dummy thermal vias can reduce the interconnect average temperature, maximum temperature, delay and power dissipation. Moreover, this method is also suitable for clock signal wires with a large root mean square current.
文摘A steam power plant can work as a dual purpose plant for simultaneous production of steam and elec-trical power. In this paper we seek the optimum integration of a steam power plant as a source and a site utility sys-tem as a sink of steam and power. Estimation for the cogeneration potential prior to the design of a central utility system for site utility systems is vital to the targets for site fuel demand as well as heat and power production. In this regard, a new cogeneration targeting procedure is proposed for integration of a steam power plant and a site utility consisting of a process plant. The new methodology seeks the optimal integration based on a new cogenera-tion targeting scheme. In addition, a modified site utility grand composite curve(SUGCC) diagram is proposed and compared to the original SUGCC. A gas fired steam power plant and a process site utility is considered in a case study. The applicability of the developed procedure is tested against other design methods(STAR? and Thermoflex software) through a case study. The proposed method gives comparable results, and the targeting method is used for optimal integration of steam levels. Identifying optimal conditions of steam levels for integration is important in the design of utility systems, as the selection of steam levels in a steam power plant and site utility for integration greatly influences the potential for cogeneration and energy recovery. The integration of steam levels of the steam power plant and the site utility system in the case study demonstrates the usefulness of the method for reducing the overall energy consumption for the site.
文摘Based on the research of wind power development policies, this paper put forward the reform directions to improve the disadvantages of the policies. The wind power’s grid integration status quo is introduced, and the bottle neck of grid integration is analyzed. By the study on the economic benefits of wind power integration in China’s present stage, the results indicate that the wind power industry is in good condition of profits and the profits are higher with the increase of the wind resources in the areas. Through expanding the difference of the power purchase prices in different resource areas, it is beneficial for the nationwide harmonious development of wind power. At last, the present and future benefits of the energy conservation and emission reduction from wind power integration are estimated, which shows that the environmental benefits of "wind-thermal exchange" will be more and more outstanding along with the expansion of the scale of wind power.
文摘Information resources integration for enterprises at present is fairly hot in the course of information construction, as well as difficult. To achieve this goal, different developers adopt different technical means and their implementation results are also diversified for various reasons. Hereunder, the article, taking the information construction and resources integration activities by Electric Power of Henan (EPH) as an example, deploys a deep analysis and discussion on necessity and essential factors and how to ensure high effect in the process of information integration.
文摘This study presents a comprehensive impact analysis of the rotor angle stability of a proposed international connection between the Philippines and Sabah,Malaysia,as part of the Association of Southeast Asian Nations(ASEAN)Power Grid.This study focuses on modeling and evaluating the dynamic performance of the interconnected system,considering the high penetration of renewable sources.Power flow,small signal stability,and transient stability analyses were conducted to assess the ability of the proposed linked power system models to withstand small and large disturbances,utilizing the Power Systems Analysis Toolbox(PSAT)software in MATLAB.All components used in the model are documented in the PSAT library.Currently,there is a lack of publicly available studies regarding the implementation of this specific system.Additionally,the study investigates the behavior of a system with a high penetration of renewable energy sources.Based on the findings,this study concludes that a system is generally stable when interconnection is realized,given its appropriate location and dynamic component parameters.Furthermore,the critical eigenvalues of the system also exhibited improvement as the renewable energy sources were augmented.
基金supported by the Deanship of Postgraduate Studies and Scientific Research at Majmaah University in Saudi Arabia under Project Number(ICR-2024-1002).
文摘In the contemporary era,the global expansion of electrical grids is propelled by various renewable energy sources(RESs).Efficient integration of stochastic RESs and optimal power flow(OPF)management are critical for network optimization.This study introduces an innovative solution,the Gaussian Bare-Bones Levy Cheetah Optimizer(GBBLCO),addressing OPF challenges in power generation systems with stochastic RESs.The primary objective is to minimize the total operating costs of RESs,considering four functions:overall operating costs,voltage deviation management,emissions reduction,voltage stability index(VSI)and power loss mitigation.Additionally,a carbon tax is included in the objective function to reduce carbon emissions.Thorough scrutiny,using modified IEEE 30-bus and IEEE 118-bus systems,validates GBBLCO’s superior performance in achieving optimal solutions.Simulation results demonstrate GBBLCO’s efficacy in six optimization scenarios:total cost with valve point effects,total cost with emission and carbon tax,total cost with prohibited operating zones,active power loss optimization,voltage deviation optimization and enhancing voltage stability index(VSI).GBBLCO outperforms conventional techniques in each scenario,showcasing rapid convergence and superior solution quality.Notably,GBBLCO navigates complexities introduced by valve point effects,adapts to environmental constraints,optimizes costs while considering prohibited operating zones,minimizes active power losses,and optimizes voltage deviation by enhancing the voltage stability index(VSI)effectively.This research significantly contributes to advancing OPF,emphasizing GBBLCO’s improved global search capabilities and ability to address challenges related to local minima.GBBLCO emerges as a versatile and robust optimization tool for diverse challenges in power systems,offering a promising solution for the evolving needs of renewable energy-integrated power grids.
文摘Based on conventional static line rating method, the actual current carrying capability of overhead conductors cannot be judged. Due to continuous increment in electricity demand and the difficulties associated with new line constructions, the overhead lines are therefore required to be rated based on a method that should establish their real-time capability in terms of electricity transmission. The method used to determine the real-time ampacity of overhead conductors not only can enhance their transmission capacity but can also help in allowing excessive renewable generation in the electricity network. In this research work, the issues related to analyzing an impact of wind power on periodical loading of overhead line as well as finding its static and dynamic ampacities with line current are investigated in detail. Moreover, the investigation related to finding a suitable location for the construction of a 60 MW wind farm is taken on board. Thereafter, the wind park is integrated with a regional grid, owned by Fortum Distribution AB. In addition to that, the electricity generated from the wind park is also calculated in this project. Later on, the work is devoted to finding the static and dynamic line ratings for “VL3” overhead conductor by using IEEE-738-2006 standard. Furthermore, the project also deals with finding the line current and making its comparison with maximum capacity of overhead conductor (VL3) for loading it in such a way that no any violation of safe ground clearance requirements is observed at all. Besides, the line current, knowing the conductor temperature when it transmits the required electricity in the presence of wind power generation is also an important factor to be taken into consideration. Therefore, based on real-time ambient conditions with actual line loading and with the help of IEEE-738-2006 standard, the conductor temperature is also calculated in this project. At the end, an economic analysis is performed to evaluate the financial advantages related to applying the dynamic line ratings approach in place of traditional static line ratings technique across an overhead conductor (VL3) and to know how much beneficial it is to temporarily postpone the rebuilding and/or construction of a new transmission line. Furthermore, an economic analysis related to wind power system is taken into consideration as well to get familiar with the costs related to building and connecting a 60 MW wind farm with the regional grid.
文摘Appropriate wind power integration standards are of great importance to standardize wind power integration and guarantee the safety and stability of the power system. This article describes the wind power integration standards of China explicitly and explains several important points of the newly revised wind power integration standards of China in comparison with standards of Germany, Denmark, etc. The newly revised standards can meet the technical demand of China's large-scale centralized development of wind power, and guarantee the safety, stability and economy of the grid and wind farm.
文摘Under this historical background, significant changes have taken place in many industries, especially in the material supply management of power companies. In this paper, the basic concepts and characteristics of the supplier management system are firstly discussed, then the problems in the material supply process of the power company are discussed, and finally the right is given, and the reference is tried to provide for the relevant social people to promote the sustainable development of the power supply industry.
基金Danish Agency for Science, Technology and Innovation (No. 6144-00037)Danish InnovationFunding (No. 5185-00005A)
文摘Denmark’ goal of being independent of fossil energy sources in 2050 puts forward great demands on all energy subsystems (electricity, heat, gas and transport, etc.) to be operated in a holistic manner. The Danish experience and challenges of wind power integration and the development of district heating systems are summarized in this paper. How to optimally use the cross-sectoral flexibility by intelligent control (model predictive control-based) of the key coupling components in an integrated heat and power system including electrical heat pumps in the demand side, and thermal storage applications in buildings is investigated.