期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
农村特岗教师专业发展状况及其影响因素的实证研究——以四川省为例 被引量:6
1
作者 蒲大勇 《教育测量与评价》 2018年第2期33-39,64,共8页
"特岗计划"的实施解决了农村教师"进不来"和"下不去"两大问题。但通过对四川省部分农村特岗教师专业发展状况进行调查,发现目前农村特岗教师存在跟进培训弱化、校本教研虚化、职业发展更需助力等问题。... "特岗计划"的实施解决了农村教师"进不来"和"下不去"两大问题。但通过对四川省部分农村特岗教师专业发展状况进行调查,发现目前农村特岗教师存在跟进培训弱化、校本教研虚化、职业发展更需助力等问题。调查还表明,专业情意、需要层次、专业培训、评价制度是影响农村特岗教师专业发展的重要因素。要想提升农村特岗教师专业发展水平,就必须注重教师职前培养的科学性、针对性和师范性,搭建实训研究平台,加大校本研修和专业培训力度。 展开更多
关键词 特岗计划 农村特岗教师 专业发展 影响因素 对策建议
在线阅读 下载PDF
Post-evaluation of a water pollution control plan: methodology and case study 被引量:1
2
作者 Lin ZENG Xin DONG Siyu ZENG Tianzhu ZHANG Jing LI Jining CHEN 《Frontiers of Environmental Science & Engineering》 SCIE EI CAS CSCD 2015年第4期712-724,共13页
China has developed more than 20 water pollution control plans for river basins (RBWPs) since 1996. However, the implementation has generally lagged. This paper proposes a three-step, post-evaluation methodology to ... China has developed more than 20 water pollution control plans for river basins (RBWPs) since 1996. However, the implementation has generally lagged. This paper proposes a three-step, post-evaluation methodology to analyze the implementation result of a RBWP and its influential factors. First, a multi-attribute evaluation method based on an index system is established to score the enforcement results of a RBWP. Indicators measure how well a RBWP has achieved its objectives, which include water quality compliance, pollution load control, project construction, financial inputs, and related management requirements. Second, an interpretive structural model is used to detect the significant factors that affect RBWP implementation. This model can effectively analyze the cause-effect chain and hierarchical relationship among variables. Five groups of factors were identified, namely, plan preparation, water resource endowment, policy, institution, and management. Both qualitative and quantitative methods are employed in the third step to evaluate the extent to which these factors have influenced the execution result of a RBWP, including pre-post contrast, scenario analysis, and correlation analysis. This research then post-evaluated the implementation of the Huai River Basin water pollution control plans (H-RBWPs) over a period of 10 years as a case study. Results showed that the implementation of the H-RBWPs was unsatisfactory during 2001–2005, although it improved during 2006–2010. The poor execution of these plans was partially caused by the underestimation of regional economic development in combination with ineffective industrial structure adjustment policies. Therefore, this case study demonstrates the feasibility and flexibility of the proposed post-evaluation methodology. 展开更多
关键词 river basin water pollution control plan postplan evaluation multi-attribute comprehensive evaluation interpretive structural model combined qualitative/quantitative method
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部