As formation mechanisms of plugging zone and criteria for fracture plugging remain unclear,plugging experiments and methods testing granular material mechanical properties are used to study the formation process of th...As formation mechanisms of plugging zone and criteria for fracture plugging remain unclear,plugging experiments and methods testing granular material mechanical properties are used to study the formation process of the plugging zone in fractured formations,analyze composition and ratios of different sizes of particles in the plugging zone,and reveal the essence and driving energy of the formation and damage of the plugging zone.New criteria for selecting lost circulation materials are proposed.The research results show that the formation of the plugging zone has undergone a process from inertial flow,elastic flow,to quasi-static flow.The plugging zone is composed of fracture mouth plugging particles,bridging particles and filling particles,and the proportion of the three types of particles is an important basis for designing drilling fluid loss control formula.The essence of the construction of the plugging zone is non-equilibrium Jamming phase transition.The response of the plugging zone particle system to pressure is driven by entropy force;the greater the entropy,the more stable the plugging zone.Lost circulation control formula optimized according to the new criteria has better plugging effect than the formula made according to conventional plugging rules and effectively improves the pressure-bearing capacity of the plugging zone.The research results provide a theoretical and technical basis for the lost circulation control of fractured formations.展开更多
Using the visualized experimental device of temporary plugging in hydraulic fractures, the plugging behaviors of temporary plugging particles with different sizes and concentrations in hydraulic fractures were experim...Using the visualized experimental device of temporary plugging in hydraulic fractures, the plugging behaviors of temporary plugging particles with different sizes and concentrations in hydraulic fractures were experimentally analyzed under the conditions of different carrier fluid displacements and viscosities. The results show that the greater the carrier fluid viscosity and displacement, the more difficult it is to form a plugging layer, and that the larger the size and concentration of the temporary plugging particle, the less difficult it is to form a plugging layer. When the ratio of particle size to fracture width is 0.45, the formation of the plugging layer is mainly controlled by the mass concentration of the temporary plugging particle and the viscosity of the carrier fluid, and a stable plugging layer cannot form if the mass concentration of the temporary plugging particle is less than 20 kg/m^(3)or the viscosity of the carrier fluid is greater than 3 mPa·s. When the ratio of particle size to fracture width is 0.60, the formation of the plugging layer is mainly controlled by the mass concentration of the temporary plugging particle, and a stable plugging layer cannot form if the mass concentration of the temporary plugging particle is less than 10 kg/m^(3). When the ratio of particle size to fracture width is 0.75, the formation of the plugging layer is basically not affected by other parameters, and a stable plugging layer can form within the experimental conditions. The formation process of plugging layer includes two stages and four modes. The main controlling factors affecting the formation mode are the ratio of particle size to fracture width, carrier fluid displacement and carrier fluid viscosity.展开更多
At present, in the workover operations of old gas wells in the Changqing Gas Field, due to years of exploitation in the production layer, pressure deficits, and general leakage during the well killing, the well must b...At present, in the workover operations of old gas wells in the Changqing Gas Field, due to years of exploitation in the production layer, pressure deficits, and general leakage during the well killing, the well must be plugged before the well can be killed. In particular, the fracture-cavity type fractures of the lower paleocarbonate reservoirs have serious leakage. Traditional plugging materials and traditional plugging materials and methods have some limitations in dealing with leakage problems. Therefore, a composite plugging system using polymer solution as the base carrier fluid, multi-particle size rigid particles, expandable particles and modified fibers is developed. Its formula is: water + 2% polyacrylamide + 0.1% N, N-methylene bisacrylamide polymer gel is the base carrier fluid;the formulation of the particle plugging agent was continuously optimized through the CDL-II high temperature and high pressure dynamic and static plugging ability to plug the core. The final formulation of the plugging agent is: 1) 20% rigid particles (5 mm, 1 mm, 0.5 mm CCP-3 ratio 4:2:1) + 1% 3 mm expanded particles SMK-1 + 1% 1 ~ 2 mm fiber SRXW-10;2) 20% rigid particles (3 mm, 0.1 mm, 0.05 mm CCP-3 ratio 3:2:1) + 1% 3 mm expanded particles SMK-1 + 1% 1 ~ 2 mm fiber SRXW-10. The water swelling multiples of the granular plugging agent in salt water are all above 7 times, which meets the requirements of leak-proof plugging operations under high salinity;3% HCl is selected as the gel breaker, and the plugging system has a gel breaking rate of 95%;through the water plugging and profile control experimental system, the sand-filled pipe is used to simulate the plugging effect under high temperature and high pressure, and the plugging system can be sealed for 5 days at a high temperature of 110°C and a high pressure of 20 MPa to achieve a good plugging of the formation. It is expected that the developed plugging system has a good application prospect in future workover operations.展开更多
基金Supported by National Natural Science Foundation of China(51991361,52074327)Major Engineering Technology Field Test Project of CNPC(2020F-45)。
文摘As formation mechanisms of plugging zone and criteria for fracture plugging remain unclear,plugging experiments and methods testing granular material mechanical properties are used to study the formation process of the plugging zone in fractured formations,analyze composition and ratios of different sizes of particles in the plugging zone,and reveal the essence and driving energy of the formation and damage of the plugging zone.New criteria for selecting lost circulation materials are proposed.The research results show that the formation of the plugging zone has undergone a process from inertial flow,elastic flow,to quasi-static flow.The plugging zone is composed of fracture mouth plugging particles,bridging particles and filling particles,and the proportion of the three types of particles is an important basis for designing drilling fluid loss control formula.The essence of the construction of the plugging zone is non-equilibrium Jamming phase transition.The response of the plugging zone particle system to pressure is driven by entropy force;the greater the entropy,the more stable the plugging zone.Lost circulation control formula optimized according to the new criteria has better plugging effect than the formula made according to conventional plugging rules and effectively improves the pressure-bearing capacity of the plugging zone.The research results provide a theoretical and technical basis for the lost circulation control of fractured formations.
基金Supported by National Natural Science Foundation of China (U21A20105)Science and Technology Innovation Fund of PetroChina (2020D-5007-0208)。
文摘Using the visualized experimental device of temporary plugging in hydraulic fractures, the plugging behaviors of temporary plugging particles with different sizes and concentrations in hydraulic fractures were experimentally analyzed under the conditions of different carrier fluid displacements and viscosities. The results show that the greater the carrier fluid viscosity and displacement, the more difficult it is to form a plugging layer, and that the larger the size and concentration of the temporary plugging particle, the less difficult it is to form a plugging layer. When the ratio of particle size to fracture width is 0.45, the formation of the plugging layer is mainly controlled by the mass concentration of the temporary plugging particle and the viscosity of the carrier fluid, and a stable plugging layer cannot form if the mass concentration of the temporary plugging particle is less than 20 kg/m^(3)or the viscosity of the carrier fluid is greater than 3 mPa·s. When the ratio of particle size to fracture width is 0.60, the formation of the plugging layer is mainly controlled by the mass concentration of the temporary plugging particle, and a stable plugging layer cannot form if the mass concentration of the temporary plugging particle is less than 10 kg/m^(3). When the ratio of particle size to fracture width is 0.75, the formation of the plugging layer is basically not affected by other parameters, and a stable plugging layer can form within the experimental conditions. The formation process of plugging layer includes two stages and four modes. The main controlling factors affecting the formation mode are the ratio of particle size to fracture width, carrier fluid displacement and carrier fluid viscosity.
文摘At present, in the workover operations of old gas wells in the Changqing Gas Field, due to years of exploitation in the production layer, pressure deficits, and general leakage during the well killing, the well must be plugged before the well can be killed. In particular, the fracture-cavity type fractures of the lower paleocarbonate reservoirs have serious leakage. Traditional plugging materials and traditional plugging materials and methods have some limitations in dealing with leakage problems. Therefore, a composite plugging system using polymer solution as the base carrier fluid, multi-particle size rigid particles, expandable particles and modified fibers is developed. Its formula is: water + 2% polyacrylamide + 0.1% N, N-methylene bisacrylamide polymer gel is the base carrier fluid;the formulation of the particle plugging agent was continuously optimized through the CDL-II high temperature and high pressure dynamic and static plugging ability to plug the core. The final formulation of the plugging agent is: 1) 20% rigid particles (5 mm, 1 mm, 0.5 mm CCP-3 ratio 4:2:1) + 1% 3 mm expanded particles SMK-1 + 1% 1 ~ 2 mm fiber SRXW-10;2) 20% rigid particles (3 mm, 0.1 mm, 0.05 mm CCP-3 ratio 3:2:1) + 1% 3 mm expanded particles SMK-1 + 1% 1 ~ 2 mm fiber SRXW-10. The water swelling multiples of the granular plugging agent in salt water are all above 7 times, which meets the requirements of leak-proof plugging operations under high salinity;3% HCl is selected as the gel breaker, and the plugging system has a gel breaking rate of 95%;through the water plugging and profile control experimental system, the sand-filled pipe is used to simulate the plugging effect under high temperature and high pressure, and the plugging system can be sealed for 5 days at a high temperature of 110°C and a high pressure of 20 MPa to achieve a good plugging of the formation. It is expected that the developed plugging system has a good application prospect in future workover operations.