期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Frozen curtain characteristics during excavation of submerged shallow tunnel using Freeze-Sealing Pipe-Roof method 被引量:2
1
作者 Ye Niu ZeQun Hong +1 位作者 Jun Zhang Lei Han 《Research in Cold and Arid Regions》 CSCD 2022年第4期267-273,共7页
The Freeze-Sealing Pipe-Roof(FSPR)method,which has been applied for the first time in the Gongbei Tunnel of the Hong Kong-Zhuhai-Macao Bridge,is a new approach of tunnel pre-support that allows flexible adjustment of ... The Freeze-Sealing Pipe-Roof(FSPR)method,which has been applied for the first time in the Gongbei Tunnel of the Hong Kong-Zhuhai-Macao Bridge,is a new approach of tunnel pre-support that allows flexible adjustment of freeze tube arrangement and can be adapted to different environmental conditions.When the FSPR method is used to construct shallow burial submerged tunnels,the frozen wall to hold back groundwater during excavation will be weakened by air and water flows inside and outside the tunnel,and its waterproof performance needs to be further investigated.In this paper,a two-dimensional numerical model of the temperature field considering excavation and moving water boundary is established based on the preliminary design scheme and in-situ conditions and is used to analyze the variation in frozen curtain properties with various active freezing times during excavation.The results show that excavation has a weakening effect on both sides of the frozen wall,with a greater effect on the inner side,and a positive temperature appears in the local area inside the jacked pipe.The concrete fill in the jacked pipe obviously improves the freezing efficiency,and the tunnel excavation after 60 days of active freezing in the interval filling mode can ensure that the frozen soil thickness at the thinnest segment exceeds 2 m,i.e.,the design requirement.In practice,the active freezing time can be extended appropriately to reduce the influence of river water flow above the tunnel.The study serves as a technical reference for the design and implementation of similar projects. 展开更多
关键词 Freeze-sealing pipe-roof method Submerged tunnel Soil excavation Temperature field Frozen wall thickness
在线阅读 下载PDF
管幕预筑法竖井开挖与顶管施工过程数值模拟分析 被引量:9
2
作者 张可能 彭环云 +2 位作者 许庆伟 黎永索 杨仙 《中国有色金属学报》 EI CAS CSCD 北大核心 2012年第3期985-990,共6页
管幕预筑法竖井设计在国内尚无相应规范,施工过程中其支护结构与周围土体的变形受力特性与安全性尚需进行研究。以某管幕预筑法地铁车站工程为例,利用有限差分软件FLAC3D对其竖井施工过程进行数值模拟,并结合施工监测数据进行对比分析,... 管幕预筑法竖井设计在国内尚无相应规范,施工过程中其支护结构与周围土体的变形受力特性与安全性尚需进行研究。以某管幕预筑法地铁车站工程为例,利用有限差分软件FLAC3D对其竖井施工过程进行数值模拟,并结合施工监测数据进行对比分析,得到竖井支护结构及周边土体的位移与支撑轴力随施工过程的变化规律和特征。研究结果表明:管幕预筑法竖井施工过程对周边土体的变形影响较小,反映竖井新型支护结构的变形控制效果很好;顶管对各部分支护结构及周边土体的影响规律各不相同,主要体现在顶进过程中具有明显的时间性。 展开更多
关键词 管幕预筑法 竖井 顶管 数值模拟
在线阅读 下载PDF
Construction of shallow buried large-span metro stations using the small pipe roof-beam method 被引量:1
3
作者 Qian BAI Wen ZHAO +5 位作者 Yingda ZHANG Pengjiao JIA Xiangrui MENG Bo LU Xin WANG Dazeng SUN 《Frontiers of Structural and Civil Engineering》 SCIE EI CSCD 2024年第1期122-136,共15页
In relation to the Shifu Road Station project on Line 4 of the Shenyang Metro in China,a small-pipe roof-beam method for constructing subway stations is presented.First,a numerical simulation was performed to optimize... In relation to the Shifu Road Station project on Line 4 of the Shenyang Metro in China,a small-pipe roof-beam method for constructing subway stations is presented.First,a numerical simulation was performed to optimize the supporting parameters of the proposed method and determine the design scheme.Subsequently,the deformation of the pipe roof and surface settlement during the construction process were investigated.Finally,the surface settlement attributed to the excavation was studied through field monitoring,and the proposed method was compared with other methods.The results show that an increase in the pipe-roof spacing has little effect on the surface settlement and piperoof deformation.The bearing capacity of the pipe roof can be efficiently utilized once the flexural stiffness reaches 2EI,and the flexural stiffness is not the dominant factor controlling the deformation.The essential stages in controlling surface settlement are the excavations of the transverse pilot tunnels and the soil between them.The final settlement value of the ground was 24.1 mm,resulting in a reduction in the construction period by at least five months while satisfying the control requirements. 展开更多
关键词 subway station pipe-roof method surface settlement SIMULATION on-site monitoring
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部