Objective: to adopt standardized path management in pharmaceutical management of hospital traditional Chinese medicine pharmacies and analyze its specific application value. Methods: from December 2018 to December 201...Objective: to adopt standardized path management in pharmaceutical management of hospital traditional Chinese medicine pharmacies and analyze its specific application value. Methods: from December 2018 to December 2019 in our hospital, 300 Chinese medicine management materials were selected as the object of this experimental study. June 2019 was taken as the time point, and standardized path management was implemented in the pharmaceutical management of hospital Chinese medicine after June 2019. The 150 Chinese medicine management materials before June 2019 were taken as the control group, while the 150 Chinese medicine management materials after June 2019 were taken as the research group. Observe and analyze the drug audit, deployment and review of the two groups of studies, and then conduct a satisfaction survey on the management of the traditional Chinese medicine pharmacy, and record the results. Results: the results of drug audit rate, formulation rate and review rate in the two groups were analyzed. The results in the study group were 98.70%, 96.70% and 1.33% respectively. The data in the study group were better than those in the control group, which were 75.30%, 76.70% and 15.30%, respectively. The difference was statistically significant (P < 0.05). In addition, observing the satisfaction results of the two groups of patients on the management of the traditional Chinese medicine pharmacy, the satisfaction of the research group was 98.70%, while that of the control group was only 77.30%. The data of the control group was significantly lower than that of the research group, with significant difference (P<0.05). Conclusion: the adoption of standardized path management in the pharmaceutical management of Chinese pharmacy is beneficial to improve the audit rate, deployment rate and reduce the review rate of pharmaceutical products. In addition, patients' satisfaction with the management of Chinese pharmacy has also been significantly improved, which is worthy of scientific research and clinical promotion.展开更多
In the process of urbanization in our country, the number of construction projects is constantly increasing. At the same time, the construction of urban infrastructure meets the needs of the people. Urban construction...In the process of urbanization in our country, the number of construction projects is constantly increasing. At the same time, the construction of urban infrastructure meets the needs of the people. Urban construction projects are service-oriented projects that not only have market competitiveness in terms of quality and technology, but also provide public services. Therefore, quality and technology management must be continuously improved and perfected.展开更多
With the development of the new normal of economy, the business development space of the enterprise is also expanding, bringing more development opportunities to the enterprise. The main development of the new normal ...With the development of the new normal of economy, the business development space of the enterprise is also expanding, bringing more development opportunities to the enterprise. The main development of the new normal of economy is in terms of structural optimization and economic growth. At this stage, enterprises are also paying more attention to stable and healthy development. Therefore, this paper focuses on the problems existing in the business management of the enterprise under the background of the new normal of economy, and puts forward corresponding suggestions, so as to actively expand new channels and new channels of business management, and enhance the market integration level of the enterprise.展开更多
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio...According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,展开更多
文摘Objective: to adopt standardized path management in pharmaceutical management of hospital traditional Chinese medicine pharmacies and analyze its specific application value. Methods: from December 2018 to December 2019 in our hospital, 300 Chinese medicine management materials were selected as the object of this experimental study. June 2019 was taken as the time point, and standardized path management was implemented in the pharmaceutical management of hospital Chinese medicine after June 2019. The 150 Chinese medicine management materials before June 2019 were taken as the control group, while the 150 Chinese medicine management materials after June 2019 were taken as the research group. Observe and analyze the drug audit, deployment and review of the two groups of studies, and then conduct a satisfaction survey on the management of the traditional Chinese medicine pharmacy, and record the results. Results: the results of drug audit rate, formulation rate and review rate in the two groups were analyzed. The results in the study group were 98.70%, 96.70% and 1.33% respectively. The data in the study group were better than those in the control group, which were 75.30%, 76.70% and 15.30%, respectively. The difference was statistically significant (P < 0.05). In addition, observing the satisfaction results of the two groups of patients on the management of the traditional Chinese medicine pharmacy, the satisfaction of the research group was 98.70%, while that of the control group was only 77.30%. The data of the control group was significantly lower than that of the research group, with significant difference (P<0.05). Conclusion: the adoption of standardized path management in the pharmaceutical management of Chinese pharmacy is beneficial to improve the audit rate, deployment rate and reduce the review rate of pharmaceutical products. In addition, patients' satisfaction with the management of Chinese pharmacy has also been significantly improved, which is worthy of scientific research and clinical promotion.
文摘In the process of urbanization in our country, the number of construction projects is constantly increasing. At the same time, the construction of urban infrastructure meets the needs of the people. Urban construction projects are service-oriented projects that not only have market competitiveness in terms of quality and technology, but also provide public services. Therefore, quality and technology management must be continuously improved and perfected.
文摘With the development of the new normal of economy, the business development space of the enterprise is also expanding, bringing more development opportunities to the enterprise. The main development of the new normal of economy is in terms of structural optimization and economic growth. At this stage, enterprises are also paying more attention to stable and healthy development. Therefore, this paper focuses on the problems existing in the business management of the enterprise under the background of the new normal of economy, and puts forward corresponding suggestions, so as to actively expand new channels and new channels of business management, and enhance the market integration level of the enterprise.
基金supported by the National Science and Technology Plan of China (Major Project of the Eleventh Five-Year Plan, Grant No. 2006BAB04A13)the Philosophy and Social Science Fund of Education Department of Jiangsu Province (Grant No. 07SJD630006)+1 种基金the Third Key Discipline (Techno-Economics and Management) of the Project 211the Key Disciplines of Jiangsu Province (Engineering and Project Management)
文摘According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,